Original source · versioned page text
200917 La Mer Working Drawings - Rev #
Work in Progress
rev date issued details
client sign-off: date: Working Drawings
#-
WI 20.09.17 MS Working Drawings Rev#
P
DR01
REN02 block wall
REN02 HWD01 level 2 RL 6,445
HWD01
975
SHR-01
fall pool level 1 RL 5,470
REN01 new security gate- refer
to schedules
1,585
new concrete stairs
finish: STA01
noosa boardwalk
fall 1:100 new proposed path level RL 3,885
ground level
1 Section G
1.5 Scale
key plan 1:500
a: shop 5, 212 david low way, peregian beach, qld 4573
p: (07) 5471 3033 Alterations and Additions Scale
sparks architects www.sparksarchitects.com
37 Hastings Street, Noosa Heads La Mer Body Corporate 141 MS Section G WD 3.7
sparks architects pty. ltd. abn 89 124 611 721
qld architect's registration No. 3974 project client job no. drawn drawing dwg no.
GSPublisherVersion 166.6.74.18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.