Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
SCC CORRESPONDENCE
Place Barcode here
I 1111111111111111111111111
80602695 I
_J
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
Part l) Of "67
Application number: N)c_.\) \d J 0’2.a~
_..CjDocuments and-SeningSoeje\Desktop\Multi Part Record Cover Sheet NEXT PART
r----- (3).doc
~
I ".
I _ ’.’ -.
I
.
, ~
’ ~~ ~ ,
L
a ~ ~_, I I _
1.",,-" I
l-- - -
~~
I
_:0_ ~~~"Z~~..~
l
-
.. -
IBOX: ~. l-:... .~.o..........l
R:
-r--M
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 51 (of 115)
Page 2
,
Prepared for
Northbrook Corporation Pty Ltd
23 October 2012
<.f)CElrdn
Shaping the Future
~
[OCR of page images]
Noosa on Weyba
Flood Study
5101-19-03
Prepared for
Northbrook Corporation Pty Ltd
23 October 2012
qc»
Cardnao
Shaping the Future
Page 3
Noosa on Weyba
Flood Study
~,.,CardnO.
Cardno (Qld)Pty Ltd
ABN 57051 074992
Level 11 Green Square North Tower
515 St Paul’s Terrace
Fortitude Valley Qld 4006
Locked Bag 4006 Fortitude Valley
Queensland 4006 Australia
Telephone: 07 3369 9822
Facsimile: 07 3369 9722
International: +61 733699822
[email protected]
www.cardno.com.au
Document Information
Prepared for Northbrook Corporation Pty Ltd
Project Name Noosa on Weyba
File Reference 0:\51 01-19-03\wp\R1 v1 Flood Study\Flood Study v1.doc
Job Reference 5101-19-03
Date 23 October 2012
Document Control
Version Date Author Author Reviewer Reviewer
Initials Initials
1 23 October 2012 Nadia Guterres Michael Delia
"@2012 Cardno All Rights Reserved. Copyright in the whole and every part of this document belongs to Cardno
and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on
any media to any person without the prior written consent of Card no."
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page ii
Page 4
Noosa on Weyba
Flood Study
~,.,CardnO.
Table of Contents
1 Introduction 1
2 Site Description 2
3 Hydraulic Modelling 3
3.1 Available Flood Modelling 3
3.2 TUFLOW Model 3
3.2.1 Summary 3
3.2.2 Topography and Grid Size 3
3.2.3 Roughness Values 4
3.2.4 Model Inflows 4
3.2.5 Boundary Conditions 5
3.2.6 Model Runs 5
3.2.7 Time Step 7
3.2.8 Existing Structures 7
3.3 Model Calibration 9
4 Hydrologic Model 11
4.1 Rational Method 11
4.1.1 Sub-catchments 11
4.1.2 Times of Concentration 11
4.1.3 Rainfall Intensity 11
4.1.4 Fraction Impervious 11
4.1.5 Runoff Coefficient 11
4.1.6 Resultant Peak Flows 12
4.2 WBNM Model 12
4.2.1 Summary 12
4.2.2 Developed Case 13
4.3 PMF Inflows 15
5 TUFLOW Calibration 16
5.1 February 2012 Event 16
6 Existing Case Results 18
6.1 Peak Water Levels 18
6.2 Peak Flows 18
6.3 Peak Velocities 18
7 Proposed Development 19
7.1 Proposed Development 19
7.2 Proposed Structures 19
7.3 Proposed Stormwater Treatment 21
8 Developed Case Results 22
8.1 Peak Water Levels 22
8.2 Peak Flows 23
8.3 Peak Velocities 23
8.4 Flood Storage 24
8.5 Sensitivity Analysis 25
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page iii
Page 5
Noosa on Weyba
Flood Study
~,.,CardnO.
8.5.1 Waterway Corridor Revegetation 25
8.5.2 Culvert Blockage 25
8.6 Proposed Emergency Evacuation Routes 25
9 CONCLUSION 27
Tables
Table 3-1 TUFLOW Model Runs................. ..................................................................................................
6
Table 4-1 Bransby Williams Time of Concentration Calculations..................... ..........................................
11
Table 4-2 Rational Method Peak Flows...................................................................................................... 12
Table 4-3 WBNM Sub-catchments -
Existing Case.................................................................................... 12
Table 4-4 Comparison to Rational Method Flows................... ....................................................................
13
Table 4-5 WBNM Sub-catchments -
Developed Case......... ......................................................................
13
Table 4-6 100 Year ARI Local Peak Flows .................................................................................................14
Table 4-7 PMF Rainfall................................................................................................................................15
Table 8-1 Flood Storage within Lot 11 ........................................................................................................
24
Figures
Figure 1 Site Location
Figure 2 WBNM Sub-catchments
Figure 3 TUFLOW Model Setup
Figure 4 TUFLOW Comparison Points
Figure 5 Existing Case DEM
Figure 6 100 Year ARI Existing Case Peak Water Level (Local and Regional)
Figure 7 100 Year ARI Existing Case Peak Depth (Local and Regional)
Figure 8 100 Year ARI Existing Case Peak Velocity (Local and Regional)
Figure 9 10 Year ARI Existing Case Peak Water Level (Local and Regional)
Figure 10 2 Year ARI Existing Case Peak Water Level (Local and Regional)
Figure 11 February 2012 Flood Event -
Peak Water Level
Figure 12 100 Year ARI Existing Case Peak Water Level with Climate Change
Figure 13 Proposed Development Plan
Figure 14 Evacuation Routes
Figure 15 Developed Case DEM
Figure 16 100 Year ARI Developed Case Peak Water Level (Local and Regional)
Figure 17 100 Year ARI Developed Case Peak Depth (Local and Regional)
Figure 18 100 Year ARI Developed Case Peak Velocity (Local and Regional)
Figure 19 10 Year ARI Developed Case Peak Water Level (Local and Regional)
Figure 20 2 Year ARI Developed Case Peak Water Level (Local and Regional)
Figure 21 100 Year ARI Developed Case Peak Water Level with Climate Change
Figure 22 Flood Level Impact -
Design Event 1 (100 Year ARI Local)
Figure 23 Flood Level Impact -
Design Event 2 (50Year ARI Local)
Figure 24 Flood Level Impact -
Design Event 3 (20Year ARI Local)
Figure 25 Flood Level Impact -
Design Event 4 (10Year ARI Local)
Figure 26 Flood Level Impact -
Design Event 5 (5 Year ARI Local)
Figure 27 Flood Level Impact -
Design Event 6 (2Year ARI Local)
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page iv
Page 6
Noosa on Weyba
Flood Study
~,.,CardnO.
Figure 28 Flood Level Impact -
Design Event 7 (1 Year ARI Local)
Figure 29 Flood Level Impact -
Design Event 8 and 9 (100 Year ARI Storm Surge)
Figure 30 Flood Level Impact -
Design Event 10 (100 Year ARI Regional)
Figure 31 Flood Level Impact -
Design Event 11 (50 Year ARI Regional)
Figure 32 Flood Level Impact -
Design Event 12 (20 Year ARI Regional)
Figure 33 Flood Level Impact -
Design Event 13 (10 Year ARI Regional)
Figure 34 Flood Level Impact -
Design Event 14 (5 Year ARI Regional)
Figure 35 Flood Level Impact -
Design Event 15 (2Year ARI Regional)
Figure 36 Sensitivity Analysis -
Impact of Revegetation of Waterway Corridor
Figure 37 Sensitivity Analysis -
Impact of Culvert Blockage
Figure 38 Developed Case PMF (Local)Peak Water Level
Figure 39 Developed Case PMF (Local)Peak Depth
Appendi s
Appendix A Concept Development Plan
Appendix B Noosa River Flood Study Cross-sections
Appendix C Sunshine Coast Regional Council Defined Flood Levels
Appendix D Rainfall Intensities
Appendix E February 2012 Flood Survey Levels
Appendix F Peak Water Levels
Appendix G Peak Flows
Appendix H Peak Velocities
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page v
Page 7
Noosa on Weyba
Flood Study
~,.,CardnO.
1 Introduction
The subject site encompasses the following lots:
The J & K Hofmann land:
. Lot 7 on RP46782 1.99 ha
. Lot 2 on RP160983 93.1 ha
. Lot 2 on SP179590 12.5 ha
. Lot 53 on SP163571 110.0 ha
The Northbrook Pty Ltd land:
. Lot 1667 on M3772 44.4 ha
. Lot 11 on RP893393 40.7 ha
. Lot 12 on RP893393 0.61 ha
It is proposed to develop around 19 percent of this site for residential purposes, with 4 percent of the site
used as parks and lake buffer zone and the remaining 77 percent of the site dedicated as green space and
conservation areas. The concept master plan for the development is shown in Appendix A.
The aim of this report is to:
. determine the relevant flood levels for the site, including local and regional flood events for use in
master planning, to ensure that all lots and roads have sufficient flood immunity;
. look at the potential impact of development on peak flood levels and flows for neighbouring areas;
. determine mitigation strategies that would be required to reduce any impact on neighbouring areas;
. determine the appropriate flood levels for the site taking into account climate change, i.e. increased
rainfall intensity and a rise in sea level of 0.8 metres; and
. size culvert crossings to ensure that the site is accessible during a Probable Maximum Flood (PMF)
event, as requested by Council.
Measures to improve flood levels and access for lots located on the neighbouring Lake Entrance Boulevard
are also proposed.
Regional flood modelling has been conducted of the Noosa River in Mike 11. The results of this study are
outlined in the Noosa River Flood Study (JWP,1995). This modelling was recently updated by Council to
use Version 2010 of Mike 11 and was run for several more storm durations. The cross-sections used in this
modelling are shown in Appendix A. This modelling does not include the local tributaries located within or
adjacent to the site, and is therefore not of sufficient quality to use to determine flood levels throughout the
site. This regional flood modelling does however take into account the impact of storm surge.
The flow patterns and interactions between the different creeks and Lake Weyba are quite complex and so
the software used for this analysis was TUFLOW, which is a two and one dimensional flood model.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 1
Page 8
Noosa on Weyba
Flood Study
~,.,CardnO.
2 Site Description
The J & K Hofmann land is bounded by Hollett Road to the south, Eenie Creek to the north and it includes
lots on both sides of Walter Hay Drive. Tributaries of Eenie Creek run through or adjacent to these lots. The
site is currently used for rural purposes and the majority of the site is densely vegetated with sections that
have been cleared for grazing purposes. The site is relatively steeply sloped, and the tributaries are well
defined, except for the area just to the north of Hollett Road where the ground is fairly flat and flows disperse
over a wide area.
The Northbrook Pty Ltd land is located to the south-east of the J & K Hofmann land and is bounded by
Tidswell Road to the west and Lake Weyba to the east. The site is currently used for rural purposes. The
majority of Lot 11 has been cleared with sections of remnant vegetation. A tributary of Lake Weyba,
historically known as Keyser Creek, is located within Lot 11, and drains from south to north. Keyser Creek,
within Lot 11 is relatively flat and low lying with levels ranging from 0.7 to 1.1 mAHD. A track located in an
existing council road reserve along the northern boundary of the site currently acts as a bund controlling
outflows. It has a minimum level of 1.14 mAHD. At the southern boundary of the site the level of Keyser
Creek rises sharply to a minimum level of around 1.8 mAHD. The western section of Lot 11 is relatively flat
with a grade of around 1 percent and levels from 0.7 to 6.5 mAHD. The central section of Lot 11 drains
towards Keyser Creek and is generally more steeply sloped with levels up to 14.5 mAHD. The eastern
section of Lot 11 drains towards Lake Weyba and is generally steeply sloped with a grade of around 5
percent, and levels from 0.5 to 14.5 mAHD.
Lake Weyba is connected to Noosa River via Weyba Creek.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 2
Page 9
Noosa on Weyba
Flood Study
~,.,CardnO.
3 Hydraulic Modelling
3.1 Available Flood Modelling
Regional flood modelling has been conducted of the Noosa River in Mike 11. The results of this study are
outlined in the Noosa River Flood Study (JWP,1995). This modelling was recently updated by Council to
use Version 2010 of Mike 11 and was run for several more storm durations. The cross-sections used in this
modelling are shown in Appendix A. This modelling does not include the local tributaries, including Eenie
Creek and Keyser Creek, and is therefore not of sufficient quality to use to determine flood levels throughout
the site. This regional flood modelling does however take into account the impact of storm surge. The flood
search certificate for the site is provided in Appendix B. These flood levels are taken from the updated
regional flood modelling. The levels are:
. 100 year ARI = 2.09 mAHD
. 20 year ARI = 1.53 mAHD
. 10 year ARI = 1.45 mAHD
A storm tide study of the Noosa River has recently been conducted. However, at the time of writing, the final
results of this analysis were not available from Sunshine Coast Regional Council (SCRC). The storm tide
levels used as tailwater conditions in the Noosa River Flood Study (JWP,1995)were:
. 100 year ARI = 1.8 mAHD
. 20 year ARI = 1.5 mAHD
The peak 100 year regional flood level was a combination of 100 year Average Recurrence Interval (ARI)
inflows and the 20 year ARI storm surge (per comm. Geoff Newell, SCRC). The 30 hour storm was the peak
regional flood event for Lake Weyba.
3.2 TUFLOW Model
3.2.1 Summary
The flow patterns and interactions between the different creeks and Lake Weyba are quite complex and so
the software used for this analysis was TUFLOW, which is a two and one dimensional flood model. The
model extent included Eenie Creek and its tributaries, Keyser Creek, Lake Weyba and Weyba Creek. Lake
Weyba and Weyba Creek were modelled in 1 D using the Mike 11 cross-sections from the regional flood
model, and trimmed where necessary to avoid duplication of storage. The model extended downstream to
Section Weyba 6.5, which is located at Weyba Road. The remaining area used Aerial Laser Survey (ALS)
obtained from the Department of Environment and Heritage Protection (DEHP),formerly DERM.
The TUFLOW model was validated against the February 2012 flood event which resulted in significant
inundation of properties along Lake Entrance Boulevard.
TUFLOW Version 2011-09-AF iSP was used in the analysis.
3.2.2 Topography and Grid Size
The digital terrain model (DTM)created in 12d used ALS data obtained from DEHP. This data was part of a
larger dataset obtained for the SCRC in 2008/09 by Schlencker Mapping Ptd Ltd using LiDAR technology.
The reported accuracy of this data is:
Vertical data:
Spatial Accuracy: O.15m @ 67 % CI
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 3
Page 10
Noosa on Weyba
Flood Study
~,.,CardnO.
Horizontal data:
Spatial Accuracy: 0.2 @ 67 % CI
The permanent waterbodies, as shown on aerial photography, of Eenie Creek and Keyser Creek were
manually defined in TUFLOW as minimum z shapes. This was necessary to reduce some triangulation
errors in the OEM which created false blockages across the waterway and created instabilities in the results.
Similarly other flow blockages in the tributaries, caused by triangulation errors, were removed by inserting
gully lines. The ALS data of the waterway does not penetrate the water surface, and so the storage and flow
capacity below this level is not included. This may result in an overestimation of the minor flood levels.
However, the impact is expected to be negligible for the major flood events.
The grid size used in TUFLOW was 5 metres. This is a grid size typical of urban areas and results in surface
levels at 2.5 metre intervals being used in the modelling.
For the developed case OTM, the earthworks model created in 12d was overlaid onto the existing surface
grid and re-exported.
3.2.3 Roughness Values
The Manning’s n roughness values used in the 10 sections of Lake Weyba and Weyba Creek were kept at
the same values as those used in the Mike 11 modelling. The values varied at different sections but were
typically:
. n = 0.025 for waterway areas; and
. n = 0.10 for dense vegetation.
The Manning’s n roughness values used in the 20 grid were:
. n = 0.03 for waterway areas;
. n = 0.12 for de nse vegetation;
. n = 0.20 for urban areas;
. n = 0.05 for grass areas with a few trees; and
. n = 0.04 for roadway crossings
A sensitivity analysis was conducted with a roughness value of 0.15 for dense vegetation areas. This
resulted in an increase in 100 year ARI peak water levels of around 100 to 150mm along Eenie Creek and
around 50mm along Keyser Creek. The impacts in Keyser Creek were not as great due to the low velocities
in this area.
The roughness values used in TUFLOW are shown in Figure 3.
3.2.4 Model Inflows
The inflows into the TUFLOW model were taken from a WBNM model, which was compared to peak flows
using the Rational Method. The location of the inflows is shown in Figure 3. The TUFLOW inflows were
either inserted as 20 SA inflows, 20 boundary inflows or 10 inflows. The catchment delineation in the area
surrounding the site was different to that used in the regional flood modelling as there was insufficient detail
in the regional modelling. The developed case inflows were modified as required due to the increase in
impervious area and changes in catchment delineation. Further detail of the WBNM model is given in
Section 4.
For the climate change scenario, the inflows were increased by 20 percent to account for an intensification of
rainfall. This is the amount specified by the Inland Flooding Study (OERM,2010)for the planning year 2090.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 4
Page 11
Noosa on Weyba
Flood Study
~,.,CardnO.
3.2.5 Boundary Conditions
For local flood events the initial water level and tailwater level was set at Mean High Water Springs (MHWS)
as recommended by SCRC. The MHWS level at Munna Point, which is the closest permanent tidal datum, is
0.36 mAHD (Maritime Safety Queensland, 2012). This lower tailwater level ensures that the impact of
development is not drowned out. A sensitivity analysis was run using a tailwater level equal to Highest
Astronomical Tide (HAT)of 0.68 mAHD. This resulted in an increase in 100 year ARI peak water levels of
around 10mm,which was not considered significant.
The 100 year ARllocal flood event was also run in combination with storm surge as a tailwater condition, to
check the 100 year ARI levels throughout the site. The 100 year ARI local flows were combined with the 20
year ARI storm surge level of 1.5 mAHD. The 20 year ARI local flows and the 100 year ARI storm surge
level of 1.8 mAHD were also run. The Noosa River Flood Study (JWP,1995) estimates that both of these
combinations are equivalent to a 100 year ARI event. The 100 year ARI inflows with the 20 year ARI storm
surge resulted in the highest peak water levels throughout the site.
For the regional flood events the initial water level and tailwater level were set as the hydrograph from the
Mike 11 model at Weyba 6.5 for the 30 hour event. The hydrographs were scaled to match the reported
peak levels from the upgraded modelling. The peak tailwater levels adopted were:
. 100 year ARI = 2.04 mAHD (20 year ARI storm tide tailwater);
. 50 year ARI = 1.76 mAHD (10 year ARI storm tide tailwater);
. 20 year ARI = 1.52 mAHD (5 year ARI storm tide tailwater);
. 10 year ARI = 1.39 m AHD (HATtailwater);
. 5 year ARI = 1.33 m AHD (HATtailwater); and
. 2 year ARI = 1.26 m AHD (HATtailwater).
For the climate change scenario a sea level rise of 0.8m was adopted, as recommended by the Queensland
Coastal Plan (2012)for the year 2100. The tailwater level for the 100 year ARI local event was therefore set
at 2.3 mAHD, which is the current 20 year ARI storm surge level plus 0.8 metres. An equivalent 100 year
ARI event (as indicated in the Noosa River Flood Study) is considered to be the 20 year ARI local flows with
a 100 year ARI storm surge level. This scenario, which had a tailwater level of 2.6 mAHD, was therefore
also modelled. The impact of sea level rise on the regional flood event, which would then be adopted as the
tailwater condition, was not available. However, given that the local flood levels throughout the site are
typically higher than the regional flood levels, it was not considered necessary to model this event.
For the Probable Maximum Flood (PMF)event, a tailwater condition of 2.68 mAHD was adopted. This is the
1000 year ARI storm surge level as defined by the Queensland Climate Change and Community
Vulnerability to Tropical Cyclones (2004) report. This is the tailwater condition currently being used by
Council to define the PMF event. It should be noted that the Noosa River Flood Study used the 100 year
ARI storm surge level in combination PMF river inflows as the PMF event. Therefore the current PMF
scenario is a conservative assumption.
3.2.6 Model Runs
The model runs conducted for the analysis are listed in Table 3.1 below. The local flood events were run for
a range of storm durations. The peak events were the 1.5 and 24 hour events, with the shorter duration
event resulting inpeaks only in upstream parts of the model. However, for the 24 hour event the peak
generally occurred between 2.5 and 4 hours, which was similar to the calculated times of concentration for
the catchments (refer Section 4.1).
The regional flood event has a time of concentration around 30 hours (per comm. Geoff Newell, SCRC).
Therefore for the 100 year ARI regional storm event, the coincident local event (which has a time of
concentration of around 3 hours) is approximately equal to the 1 year ARllocal storm event. It was therefore
decided to use the 30 hour local storm and run it concurrently with the 30 hour regional storm as it resulted in
higher regional flood levels.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 5
Page 12
Noosa on Weyba
Flood Study
~,.,CardnO.
Table 3-1 TUFlOW Model Runs
1~1il!m
IDm’iflnl? I lh11lom OOWtItml(Wrt41 ~!~I
Local Events -
MHWS
1 100 year ARI MHWS 100
2 50 year ARI MHWS 50
3 20 year ARI MHWS 20
4 10 year ARI MHWS 10
5 5 year ARI MHWS 5
6 2 year ARI MHWS 2
7 1 year ARI MHWS 1
100 Year ARI Local Event -
Storm Surge
1.8 mAHD -
100 year
8 20 year ARI 100
storm surge
1.5 mAHD 20 year
-
9 100 year ARI 100
storm surge
Regional Events
Regional 100 year,
10 100 year, 30 hour 30 hour 100
(peak of 2.04 mAHD)
Regional 50 year,
11 50 year, 30 hour 30 hour 50
(peak of 1.76 mAHD)
Regional 20 year,
12 20 year, 30 hour 30 hour 20
(peak of 1.52 mAHD)
Regional 10 year,
13 10 year, 30 hour 30 hour 10
(peak of 1.39 mAHD)
Regional 5 year,
14 5 year, 30 hour 30 hour 5
(peak of 1.33 mAHD)
Regional 2 year,
15 2 year, 30 hour 30 hour 2
(peak of 1.26 mAHD)
Probable Maximum Flood
2.68 mAHD 1000 year
16 PMF
I .
Storm Surge
-
PMF
Climate Change
20 year ARI- 2.6 mAHD 100 year
-
17 100 (CC)
increased by 20% storm surge + 0.8m
100 year ARI -
2.3 mAHD -
20 year
18 100 (CC)
increased by 20% storm surge + 0.8m
The initial water levels in TUFlOW were set to equal the downstream tailwater condition. The existing dam
located within the Hofmann site was assumed to be full prior to the start of the storm events.
The modelled PMF event addresses local flooding only. The regional Noosa River PMF event will result in
the peak water levels for lake Weyba and the downstream section of the site. Council has advised that the
latest PMF level for Lake Weyba is 4.23 mAHD (per comm. Geoffrey Newell). This flood level will therefore
also need to be referenced when defining road levels that will be used as emergency evacuation routes.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 6
Page 13
Noosa on Weyba
Flood Study
~,.,CardnO.
3.2.7 Time Step
The time step adopted in the modelling was 3 seconds for the 2D area and 1 second for the 1 D area. For
TUFLOW modelling it is recommended that the 2D time step not be less than a quarter of the grid size,
which would be 1.25 seconds in this instance. A model requiring a smaller time step can indicate
instabilities.
The resultant continuity error in the TUFLOW modelling was around 0.15 percent, which indicates that the
model was very stable.
3.2.8 Existing Structures
The existing culvert crossings of Lake Entrance Boulevard and Aspera Place were entered into the model as
1 D structures. The details of the culvert crossings were taken from SCRC online mapping. Where no
information was available for the invert levels or sizes, the details were taken from site inspection. The
photographs below show the culvert crossings in this area.
Photo 1 lake Entrance Boulevard -
Crossing 1
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 7
Page 14
Noosa on Weyba
Flood Study
~,.,CardnO.
Photo 3
The structures were:
. Lake Entrance Boulevard Crossing 1 -
3/2100 by 1800mm RCBC (upstream IL = 0.6 mAHD,
downstream IL = 0.55 mAHD, length = 23.7m);
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 8
Page 15
Noosa on Weyba
Flood Study
~,.,CardnO.
. Lake Entrance Boulevard Crossing 2 -
4/2700 by 900mm RCBC (upstream IL = 1.19 mAHD,
downstream IL = 1.18 mAHD, length =
22.3m);
. Lake Entrance Boulevard Crossing 3 -
2/750mm RCPs (upstream IL = 1.038 mAHD, downstream IL
= 0.816 mAHD, length = 37.1 m); and
. Aspera Place Crossing -
1 0/1800mm RCPs (upstream IL = 2.40 mAHD, downstream IL = 2.30
mAHD, length =
20m).
The road height levels were taken from the DTM.
The third crossing of Lake Entrance Boulevard appears to be deliberately undersized so as to divert flows
through the waterway crossing of Aspera Place, and reduce flooding of downstream areas along Lake
Entrance Boulevard.
A 450mm low flow pipe was included underneath Hollett Road. The surveyed invert level of this culvert was
6.53 mAHD.
Typical entry and exit losses of 0.5 and 1.0 respectively were assumed for the culverts, unless specified
otherwise.
No blockage of the existing culverts was assumed.
The Walter Hay Drive bridge was modelled as a 2D structure based on plans obtained from the Department
of Main Roads.
No structures were included in the 1 D section of the model as the model ended upstream of Weyba Road.
The recent bridge crossing of Weyba Creek at Eenie Creek Road was not included as it was not in the Mike
11 model. The bridge crossing is not expected to have a significant impact on peak flood levels as the
bridge deck is well above peak flood levels, there is a large spacing between piers, and there are low flow
velocities in this area.
3.3 Model Calibration
The results of the TUFLOW model were compared to the flood event of the 24th of February 2012. SCRC
had debris levels surveyed around Lake Entrance Boulevard following this event. The rainfall was quite
spatially varied. The closest gauges at Tewantin and Upper Doonan recorded 196mm and 109mm
respectively over a 210 minute period. The rainfall applied to the WBNM sub-catchments were weighted
based on their location relative to the gauges.
The intensity frequency duration (IFD) analysis of this rainfall event at the two gauges is shown below in
Image 1.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 9
Page 16
Noosa on Weyba
Flood Study
~,.,CardnO.
100
~
..c:
E
i!’
.;;;
c:
Qj
~
~
;
0::
10
0.125 0.25 0.5
Hours
-1Year ARI -2YearARI -SYearARI -10Year ARI -2QYearARI -50Year ARI -lOOYearARI ......
TewantinGauge ---
Upper Doonan Gauge
Image 1 IFD Analysis of February 2012 Event
The above image shows that the rainfall recorded at the Tewantin gauge had an ARI of more than 100 years
for storm durations between 1 and 3 hours, which is similar to the times of concentration of the sub-
catchments. The rainfall recorded at the Upper Doonan gauge had an ARI of approximately 5 years. This
highlights the spatial variability of rainfall intensity during this event. As the site and its contributing
catchments are located between these two gauges it is likely that the resultant ARI would be less than 100
years.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 10
Page 17
Noosa on Weyba
Flood Study
~,.,CardnO.
4 Hydrologic Model
4.1 Rational Method
4.1.1 Sub-catchments
The catchment areas were delineated using a combination of LiDAR data from DEHP, the digital 25 metre
grid DTM of South-East Queensland provided by DEHP and the catchment boundaries used in the Noosa
River Flood Study. The resultant sub-catchments are shown in Figure 1. The delineation of the Eenie
Creek and Keyser Creek tributaries of Lake Weyba was much more detailed than that conducted for the
regional flood study, and so comparison of the resultant peak flows from these catchments is not
appropriate.
4.1.2 Times of Concentration
The times of concentration were points for different tributaries using the Bransby
calculated at several
William’s Equation, which is the preferred method of QUDM (2007) for rural catchments less than 500
hectares. A summary of the calculations is shown below in Table 4-1. The total time of concentration for the
two creeks draining towards Lake Weyba was around 3 hours.
.
Ta ble 41 - B ransb)y Wll"
I lams rImeofConcentratlon Ca I cu I atlons
~ mmmrn
~
~
t.::mm
~
V
. ,
,
.
’ii3
~
EC A2 230.29 2.53 1.54 78.1
EC B2 349.48 4.44 3.62 110.8
EC C1 72.48 2.08 1.89 69.0
EC E4 285.22 2.50 1.34 77.6
EC F6 76.58 1.41 1.53 48.8
KC 12 139.68 1.75 1.65 56.1
KC H2 246.54 2.49 1.31 79.0
All
catchments
draining to 1643.33 7.58 2.64 172.7
Eenie Creek
and Keyser
Creek
4.1.3 Rainfall Intensity
The rainfall intensities were taken from Noosa using AUSIFD. The resultant rainfall intensities are shown in
Appendix C.
4.1.4 Fraction Impervious
The fraction impervious values for the sub-catchments were taken from the values used for the Noosa River
Flood Study. The lake was assumed to be fully impervious.
4.1.5 Runoff Coefficient
The runoff coefficient for each sub-catchment was calculated from QUDM. Based on the rainfall intensity a
10 year runoff co-efficient for fully pervious areas of 0.70 was adopted.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 11
Page 18
Noosa on Weyba
Flood Study
~,.,CardnO.
4.1.6 Resultant Peak Flows
The resultant 100 year ARI peak flows for the sub-catchments are shown in Table 4-2.
Table 4-2 Rational Method Peak Flows
UiIilYm(jJiIJ
\1Eil <<iIil~
( ~~
IiImftim r:br
~
An Shugr,o
~(PE1) ~~’lI[1 =’ ~
EC A2 230.29 0.025 0.705 88.5 47.9
EC B2 349.48 0.062 0.712 74.1 61.4
EC C1 72.48 0.050 0.710 94.4 16.2
EC E4 285.22 0.024 0.705 88.8 59.5
EC F6 76.58 0.002 0.700 113.5 20.3
KC 12 139.68 0.050 0.710 104.9 34.7
KC H2 246.54 0.028 0.706 88.1 51.1
4.2 WBNM Model
4.2.1 Summary
A WBNM model was set up of all the sub-catchments shown in Figure 1. The details of each sub-catchment
are shown in Table 4-3. The sub-catchments prefixed with EC stand for the Eenie Creek sub-catchments,
those prefixed with KC stand for Keyser Creek sub-catchments and those prefixed with LW stand for Lake
Weyba and Weyba Creek sub-catchments.
Ta ble 43 - WBNM Su b -catch men ts- E.
XISfmg Case
to liI~E;b ~ to rn~I;b
I ~=S1n mml IImrow.n.JI~i ~l;’
m irn’1[l amn [bj].r:r.’f!.J1r..1 I
EC_A1 165.89 0.00 EC F7 6.27 0.00
EC A2 64.39 0.09 EC F8 3.68 0.00
EC A3 27.42 0.56 EC G1 4.78 0.00
EC A4 93.28 0.73 EC G2 2.45 0.00
EC A5 24.87 0.21 KC H1 31.34 0.00
EC A6 143.69 0.00 KC H2 29.91 0.00
EC B1 299.10 0.05 KC H3 8.54 0.00
EC B2 50.39 0.13 KC H4 63.02 0.00
EC C1 72.48 0.05 KC 11 97.15 0.05
EC C2 7.98 0.20 KC 12 42.53 0.05
EC_D1 5.30 0.45 KC_13 14.48 0.00
EC E1 246.45 0.02 KC 14 12.27 0.00
EC E2 24.50 0.05 KC 15 10.33 0.00
EC E3 6.34 0.05 LW 62 222.49 0.11
EC E4 7.93 0.05 LW 63 99.73 0.33
EC F1 27.06 0.00 LW 64 997.21 1.00
EC F2 3.66 0.05 LW 65 1468.53 0.11
EC F3 5.79 0.00 LW 69 156.53 0.00
EC F4 12.87 0.00 LW 70 138.55 0.33
EC F5 9.55 0.00 LW A 6.84 0.00
EC F6 17.65 0.00 LW B 3.85 0.00
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 12
Page 19
Noosa on Weyba
Flood Study
~,.,CardnO.
An initial loss of 15mm and continuing loss of 2.5 mm/hr was assumed for pervious areas. An initial loss of
Omm and continuing loss of 0 mm/hr was assumed for impervious areas. These were the rainfall losses
adopted in the Noosa River RAFTS model.
The WBNM model was run for a range of storm durations to determine the peak flows. A lag factor of 1.3
was ultimately adopted for all sub-catchments. This is within the advised range of 1.3 to 1.8. The resultant
peak flows, compared to the Rational Method and the Noosa River RAFTS model, are shown in Table 4-4.
As this table shows the peak flows match fairly well with the Rational Method results. The peak flows were
compared to the RAFTS model for the 30 hour event, as this was the critical event for the regional flood
model and the RAFTS model was not run for the same range of durations as the WBNM model. The results
show a good correlation with the smaller catchments, but an overestimation of flows for the larger catchment.
Therefore the flows from the WBNM model are conservatively high when compared to this regional flood
model.
Ta ble 44 -
Companson t0 Raf.ona1Meth 0d FIows
~
~ ’iE!J~~~~ l.lIil~i’l/J
II!t
rmm.hfiO ~~:J~IM
EC A2 47.9 46.0 -4.1
EC B2 61.4 65.9 6.8
EC C1 16.2 17.8 9.8
EC E4 59.5 54.9 -7.7
EC F6 20.3 19.5 -4.1
KC H2 51.6 49.7 -3.8
KC 12-
34.7 30.2 -13.0
rmID~(.ilill~~
~~l
IDwm,
~
r.’j:J~I~fL
li!.iJiU
~
LW 65 133.0 181.1 36.2
LW 69 24.6 25.0 1.6
LW 70 23.3 23.5 1.0
4.2.2 Developed Case
For the developed case scenario the fraction impervious values were changed to represent the increase in
impervious area. A fraction impervious of 0.60 was used for standard residential areas, 0.70 for townhouses
and retirement villas and 0.80 for apartment buildings.
The properties of the developed case sub-catchments are shown in Table 4-5. The modified sub-
catchments have been bolded and italicised.
Table 4-5 WBNM Sub-catchments _
Developed Case
t.:.mID (itimmim ~ t.i.mEl (itimmim
I~ (IffiJ) .
.
. ~ m .
.
.
I
EC A1 165.89 0.00 EC_F7 6.27 0.45
EC A2 64.39 0.09 EC_F8 3.68 0.46
EC A3 27.42 0.56 EC G1 4.78 0.00
EC A4 93.28 0.73 EC G2 2.45 0.70
EC A5 24.87 0.21 KC H1 31.34 0.00
EC A6 143.69 0.00 KC_H2 29.91 0.03
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 13
Page 20
Noosa on Weyba
Flood Study
~,.,CardnO.
~ [ ~ ~ liIiH~
I rom::~1]iD arnn Dm.rm(.nr..1 romli1-;’Tii’I2I n am1) Dmrowfl.m.1 I
EC B1 299.10 0.05 KC H3 8.54 0.60
EC B2 50.39 0.13 KC H4 63.02 0.00
EC C1 72.48 0.05 KC 11 97.15 0.05
EC C2 7.98 0.20 KC 12 42.53 0.05
EC D1 5.30 0.45 KC_/3 14.48 0.60
EC E1 246.45 0.02 KC /4 12.27 0.39
EC E2 24.50 0.05 KC_/5 10.33 0.40
EC_E3 6.34 0.44 LW 62 222.49 0.11
EC E4 7.93 0.05 LW 63 99.73 0.33
EC F1 27.06 0.00 LW 64 997.21 1.00
EC F2 3.66 0.25 LW 65 1468.53 0.11
EC_F3 5.79 0.60 LW 69 156.53 0.00
EC F4 12.87 0.00 LW 70 138.55 0.33
EC_F5 9.55 0.47 LW_A 6.84 0.55
EC_F6 17.65 0.04 LW B 3.85 0.42
The resultant peak local 100 year ARI flows for each WBNM sub-catchment are shown in Table 4-6 for the
existing and developed cases.
Table 4-6 100 Year ARI Local Peak Flows
~ tffiID~~~~ (3! mID~~~~1
aDSIIlI~iD ~ IiWlM’ aDSJill~ln ~
~ ~ ~ [!h!IMoUUflI
~
EC A1 34.5 34.5 EC_F7 2.4 3.3
EC A2 17.0 17.0 EC_F8 1.6 2.1
EC A3 12.9 12.9 EC G1 1.9 1.9
EC A4 43.1 43.1 EC_G2 1.1 1.5
EC A5 8.9 8.9 KC H1 8.8 8.8
EC A6 30.7 30.7 KC_H2 8.5 8.8
EC B1 58.3 58.3 KC_H3 3.0 4.7
EC B2 14.6 14.6 KC H4 15.4 15.4
EC C1 17.8 17.8 KC 11 22.8 22.8
EC C2 3.4 3.4 KC 12 11.8 11.8
EC D1 2.8 2.8 KC_/3 4.7 7.5
EC E1 48.7 48.7 KC_/4 4.1 5.7
EC E2 7.6 7.6 KC_/5 3.6 4.9
EC_E3 2.5 3.3 LW 62 47.2 47.2
EC E4 3.0 3.0 LW 63 33.0 33.0
EC_F1 7.8 7.8 LW 64 403.0 403.0
EC F2 1.6 1.9 LW 65 230.0 230.0
EC F3 2.2 3.3 LW 69 32.9 32.9
EC F4 4.3 4.3 LW 70 43.6 43.6
EC_F5 3.3 4.8 LW_A 2.5 3.7
EC_F6 5.6 5.8 LW_B 1.6 2.1
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 14
[OCR of page images]
Noosa on Weyba
Flood Study
EC_B1 299.10 0.05 KC_H3 8.54 0.60
EC_B2 50.39 0.13 KC_H4 63.02 0.00
EC_C1 72.48 0.05 KC_I1 97.15 0.05
EC_C2 7.98 0.20 KC_I2 42.53 0.05
EC_D1 5.30 0.45 KC_I3 14.48 0.60
EC_E1 246.45 0.02 KC_I4 12.27 0.39
EC_E2 24.50 0.05 KC_I5 10.33 0.40
EC_E3 6.34 0.44 LW_62 222.49 0.11
EC_E4 7.93 0.05 LW_63 99.73 0.33
EC_F1 27.06 0.00 LW_64 997.21 1.00
EC_F2 3.66 0.25 LW_65 1468.53 0.11
EC_F3 5.79 0.60 LW_69 156.53 0.00
EC_F4 12.87 0.00 LW_70 138.55 0.33
EC_F5 9.55 0.47 LW_A 6.84 0.55
EC_F6 17.65 0.04 LW_B 3.85 0.42
The resultant peak local 100 year ARI flows for each WBNM sub-catchment are shown in Table 4-6 for the
existing and developed cases.
Table 4-6 100 Year ARI Local Peak Flows
EC_A1 34.5 34.5 EC_F7 2.4 3.3
EC_A2 17.0 17.0 EC_F8 1.6 2.1
EC_A3 12.9 12.9 EC_G1 1.9 1.9
EC_A4 43.1 43.1 EC_G2 1.1 1.5
EC_AS 8.9 8.9 KC_H1 8.8 8.8
EC_A6 30.7 30.7 KC_H2 8.5 8.8
EC_B1 58.3 58.3 KC_H3 3.0 4.7
EC_B2 14.6 14.6 KC_H4 15.4 15.4
EC_C1 17.8 17.8 KC_I1 22.8 22.8
EC_C2 3.4 3.4 KC_I2 11.8 11.8
EC_D1 2.8 2.8 KC_I3 4.7 7.5
EC_E1 48.7 48.7 KC_I4 41 5.7
EC_E2 7.6 7.6 KC_I5 3.6 4.9
EC_E3 2.5 3.3 LW_62 47.2 47.2
EC_E4 3.0 3.0 LW_63 33.0 33.0
EC_F1 7.8 7.8 LW_64 403.0 403.0
EC_F2 1.6 1.9 LW_65 230.0 230.0
EC_F3 2.2 3.3 LW_69 32.9 32.9
EC_F4 4.3 4.3 LW_70 43.6 43.6
EC_F5 3.3 4.8 LWA 2.5 3.7
EC_F6 5.6 5.8 LW_B 1.6 2.1
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc
Commercial in Confidence
Page 14
Page 21
Noosa on Weyba
Flood Study
~,.,CardnO.
For the developed case, for catchments E3, F7 and F8, off-line detention basins will be utilised to reduce
peak flows back to the existing case levels. Therefore for these sub-catchments the existing case inflows
were used in the TUFLOW modelling. The size of the detention basins required will be determined during
detailed design. The proposed culvert crossings will provide "on-line" detention of peak flows for other sub-
catchments. For the catchments draining directly towards Lake Weyba, detention basins are not proposed.
Sio-retention basins and swales will provide attenuation of minor flows. It should be noted that the minor
flow attenuation provided by the proposed rainwater tanks and bio-retention basins has not been included in
the analysis. Appropriate erosion and scour protection will be required on all outlets.
4.3 PMF Inflows
The WSNM model was used to calculate the Probable Maximum Flood (PMF)flows utilising the Generalised
Short Duration Method (GSDM)as the catchment area is less than 1000 km2. A moisture adjustment factor
(MAF)of 0.85 was adopted and the catchment was assumed to be 100 percent rough. The resultant rainfall
depths for the PMP event are shown in Table 4-7.
Table 4-7 PMF Rainfall
l!l!ooat.!m(mnD) 60 90 120 180 270 360
~i11:mI!nmil(ljjmj) 350 448 517 626 747 832
The peak flows from the sub-catchments typically resulted from the 90 minute event and so this was used in
the analysis. It should be noted that in the downstream section of the model, the regional Noosa River PMF
levels event will dominate. The current PMF level in Lake Weyba is 4.23 mAHD.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 15
Page 22
Noosa on Weyba
Flood Study
~,.,CardnO.
5 TUFLOW Calibration
5.1 February 2012 Event
Following the 24th February 2012 flood event debris levels were surveyed by Council around Lake Entrance
Boulevard, located to the north of the site, which had several houses inundated. The survey levels are
shown in Appendix E. The surveyed levels compared to the TUFLOW results are shown in Table 5-1. The
Manning’s n roughness value for densely vegetated areas was increased to a 0.12 (refer Section 3.2) to
provide a closer match to the surveyed flood levels.
=’ ’ii!OOf!1!l1
rwmm
I.UWJWLti
lkml (I
Council Survey Levels
Crossing of Lake Entrance 4.19 4.19 0
Boulevard
Lots on Lake Entrance Boulevard 3.56 to 3.67 3.58 -
-40
JFP Survey Levels
Easement 2.8 3.22 420
Eenie Creek 1.3 to 1.4 2.97 -
1620
Walter Hay Drive 1.5 2.72 1220
Lot 11 1.2 to 1.5 2.00 to 2.09 -700
Within the lots along the south-east side of Lake Entrance Boulevard, the debris levels ranged from 3.56 to
3.67 mAHD. In this area the modelled flood level was 3.58 mAHD. On the other side of the road, a debris
level was recorded as 3.75 mAHD. The modelled flood level was 3.57m AHD, as it was downstream of the
other locations. At the creek crossing of Lake Entrance Boulevard the recorded debris level was 4.19
mAHD. The modelled flood level at this location was also 4.19 mAHD. The results of the TUFLOW model
were therefore considered to match very well with the recorded debris levels from Council.
Debris levels surrounding the site were also surveyed by JFP. The survey plan is attached in Appendix E.
The survey was taken on the 24th of April 2012, and the last significant rainfall event occurred on the 22nd of
March 2012. The recorded debris level over the electrical easement was 2.80 mAHD. The modelled flood
level at this location for the February 2012 event was 3.22 mAHD. At the confluence of the local tributary
with Eenie Creek, the recorded debris levels were 1.3 and 1.4 mAHD. The modelled flood level was 2.97
mAHD. At Walter Hay Drive the recorded debris level was 1.5 mAHD and the modelled flood level was 2.72
mAHD. Within Lot 11 on RP893393 the recorded debris levels ranged from 1.2 to 1.5 mAHD. The modelled
flood levels were between 2.00 and 2.09 mAHD.
Compared to the JFP surveyed levels the results of the flood model are significantly higher. There are
several factors that could have influenced this discrepancy;
. The survey was conducted two months after the flood event, during which subsequent rainfall events
may have washed away debris;
. The rainfall within the local catchments may have been less intense than recorded at the nearby
gauges, which showed an extremely spatially varied rainfall pattern;
. The assumed tailwater and initial water level condition of MHWS may have been overly conservative
and impacted on the flood levels of downstream areas;
. The existing dam may not have been full prior to the rainfall event and could have provided
additional attenuation of peak flows; and
. The ALS data does not penetrate the water surface which can result in an overestimation of minor
flood levels in TUFLOW.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 16
Page 23
Noosa on Weyba
Flood Study
~,.,CardnO.
It should be noted that the water surface profile required to match the Council debris levels with the JFP
debris levels would have been unrealistic. It was therefore considered that a calibration to the higher debris
levels was the most reasonable approach.
The resultant flood levels for the February 2012 event are shown in Figure 10. For the upstream areas of
Eenie Creek, the resultant modelled water levels were between the 50 and 100 year ARI levels. Within
Keyser Creek the resultant water levels were roughly equivalent to the 20 year ARI event.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 17
Page 24
Noosa on Weyba
Flood Study
~,.,CardnO.
6 Existing Case Results
6.1 Peak Water levels
Figure 6 shows the existing case 100 year ARI peak water levels. It should be noted that this figure shows
the maximum extent of inundation from design events 1, 8, 9 and 10 and so includes all local and regional
flood events. The 100 year ARI peak water level with climate change is shown in Figure 12. The 10 and 2
year ARI peak water levels are shown in Figures 9 and 10 respectively.
The existing case peak water levels at the comparison points shown in Figure 4 are provided in Appendix F.
The 100 year ARI extent of inundation covers a significant portion of the Northbrook site, particularly the
western drainage channel which encompasses Keyser Creek. The existing case 100 year ARI local peak
flood levels within Keyser Creek within Lot 11 range from 2.09 to 2.17 mAHD. With the 20 year ARI storm
surge as a tailwater condition the 100 year ARI peak water level is between 2.16 and 2.23 mAHD. The 100
year ARI regional peak flood levels range from 2.16 and 2.18 mAHD in this area. With the impact of climate
change the future 100 year ARI water levels in this area will be between 2.78 and 2.79 mAHD. Therefore
filling is required to ensure that the proposed lots in this area are not inundated.
The 100 year ARI peak flood levels within Eenie Creek and its tributaries are also a result of the 100 year
ARI local inflows combined with the 20 year ARI storm surge level. This demonstrates that the local storm
surge events result in the peak flood levels throughout the site.
The proposed development within the Hofmann site generally does not extend into areas which are
inundated in the 100 year ARI event, even with the impact of climate change. Only three lots in Precinct I
will require filling. These lots are located in an area that has existing levels of approximately 2.5 mAHD and
above.
The existing case results demonstrated that the area around Lake Entrance Boulevard currently experiences
a significant amount of flooding. The second crossing of Lake Entrance Boulevard is un-trafficable during a
2 year ARI event, with a depth of flooding across the road of approximately 500mm. Access to the 70 lots
located to the south of this crossing is therefore restricted being restricted during a 2 year ARI event and
above.
The existing Tidswell Road access track is also un-trafficable during a 5 year ARI event, which would prevent
access to the lot located to the south of Lot 11 .
6.2 Peak Flows
The existing case peak flows at the comparison lines throughout the 2D section of the model shown in
Figure 4 are provided in Appendix G.
6.3 Peak Velocities
The 100 year ARI peak velocities are shown in Figure 8. The existing case peak velocities at the
comparison points shown in Figure 4 are provided in Appendix H.
The peak velocities in the western drainage channel are quite low, with peak velocities typically around
0.2 mfs. The peak velocities in the tributary that drains through the J&K Hofmann site are typically around
0.5 mfs.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 18
Page 25
Noosa on Weyba
Flood Study
~,.,CardnO.
7 Proposed Development
7.1 Proposed Development
The proposed development plan is shown in Figure 13. The roughness values were not altered in the
developed case, as proposed urban areas will be filled, where necessary, to above the 100 year ARI
developed case peak flood level (with climate change).
J&K Hofmann Site
The proposed development of the J&K Hofmann site is predominantly outside of the 100 year ARI inundation
extent. Minor sections of filling are required for three lots within Precinct I. The 100 year ARI developed
case peak flood level (with climate change) is 3.45 mAHD in this area. Therefore the minimum floor levels
will be set above 3.95 mAHD to provide sufficient flood immunity in accordance with SCRC requirements.
Compensatory excavation in this area is not proposed. However, if required by Council, this could be
conducted in the asset protection zone adjacent to the filled lots.
To provide attenuation of peak flows, a culvert crossing of the Eenie Creek tributary will be located within the
easement at the northern end of the site. Detention basins will also be required for the northern section of
Precinct I as well as Precinct L. Sizing of these detention basins will be conducted during detailed design.
It is proposed that Hollett Road West should be upgraded by council, as a cost to the Noosa on Weyba
project, to ensure that 10 year ARI flood immunity is provided. This road will also be trafficable during a PMF
event to allow for emergency access to Precincts L, K and J. Precincts H and I will be able to access the site
from Walter Hay Drive.
Northbrook Site
It is proposed that a large area will be filled to levels above the 100 year ARI flood level (with climate
change). A waterway corridor of a minimum 120 metre width will be maintained in this area. At the southern
boundary of the site, the waterway corridor increases to around 190 metres so that existing overland flow
paths are maintained. No excavation within the waterway corridor is proposed so as to maintain existing
vegetation. The 100 year ARI developed case peak flood level (with climate change) is 2.90 mAHD in these
areas. Therefore the minimum floor levels will be set above 3.40 mAHD to provide sufficient flood immunity
in accordance with SCRC requirements. The entire area will be filled to levels above the 100 year ARI flood
level (with climate change).
Road crossings of Keyser Creek and one of its tributaries are also proposed. These crossings will have 100
year ARI flood immunity. Site access along the northern crossing of Keyser Creek (i.e. Hollett Road East)
will also be trafficable during a PMF event. The road crossings will also provide attenuation of peak flows.
A secondary access route along Tidswell Road is also proposed, and so this road needed to be upgraded in
the modelling to provide sufficient flood immunity.
7.2 Proposed Structures
The proposed culvert crossings are shown in Figure 11. The details of the proposed structures are shown
below. The evacuation routes are shown in Figure 12. To be considered trafficable, the roads were
designed to have a maximum flow depth of 250mm and a depth-velocity (dV)product of less than 0.4 m2/s.
During PMF events, access for emergency vehicles would be required. These vehicles are typically larger
than standard vehicles and so can handle greater flow depths across roads. Based on Project 10 of
Australian Rainfall and Runoff (AR&R): Appropriate Safety Criteria for Vehicles (2011), large 4WDs can
cross roads with maximum depths of 500mm, with a limiting dV product of 0.6 m2/s. Large passenger cars
can cross roads with maximum depths of 400mm, with a limiting dV product of 0.45 m2/s. For PMF events
trafficability was assumed if the depth was less than 400mm with a dV product of 0.45 m2/s.
Typical entry and exit losses of 0.5 and 1.0 were assumed unless specified otherwise.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 19
Page 26
Noosa on Weyba
Flood Study
~,.,CardnO.
Hollett Road Upgrade (Hollett Road West)
The minimum road level will need to be set at 7.35 mAHD. 10 year ARI flood immunity is proposed with
PMF trafficability.
The existing low flow pipe should be replaced with 3/1200 by 450 RCBCs (upstream IL 6.55 mAHD, =
downstream IL = 6.50 mAHD, length = 12m). Approximately 12 metres to the west 3/1200 by 450 RCBCs
(upstream IL 6.65 mAHD, downstream IL
= 6.60 mAHD, length
=
12m) should also be installed. No
=
excavation beyond the road reserve will be required.
For the previous development application for this section of the site a drainage channel located on the
northern side of the Hollett Road was proposed, to improve local drainage. This would require clearing of
vegetation. For this application this drainage channel has not been included, and larger culverts have
instead been utilised to provide sufficient flood immunity. This will minimise the amount of vegetation
clearance required.
Easement Crossing
This crossing is not required for access purposes for the site. However, it could potentially be utilised by
existing properties around Lake Entrance Boulevard and Aspera Place as an alternative flood access route,
as 70 properties in this area are inaccessible during a 2 year ARI event and above.
The minimum road level will be set at 4.30 mAHD. 10 year ARI flood immunity is proposed with 100 year
ARI trafficability.
The proposed culvert is a 1/1500 by 1500 RCBCs (upstream IL = 2.00 mAHD, downstream IL = 1.95 mAHD,
length =
15m).
Tidswell Road Crossing
An upgrade of Tidswell Road is proposed as a secondary access route for the development. It is proposed
that the existing track will be upgraded by Council, as a cost to the subject development, so that 5 year ARI
flood immunity is provided, as required for rural roads. The minimum road level will be raised from around
3.40 mAHD to 4.15 mAHD.
The proposed culverts include 3/1500 by 600 RCBCs (upstream IL = 3.30 mAHD, downstream IL = 3.15
mAHD, length =
15m) and 1/1500 by 600 RCBC (upstream IL = 3.35 mAHD, downstream IL = 3.10 mAHD,
length =
15m).
Southern Keyser Creek Crossing
This crossing of the creek will link Precincts F and G using the route of an existing rural dam wall. The
minimum road level was set at 3.15 mAHD. It is proposed that this crossing have 100 year ARI flood
immunity (with climate change). This crossing will not be trafficable during a PMF event, but alternative
access for Precinct F is provided along the fire trail located along the southern boundary of the site. This fire
trail will therefore need to be formalised so that it can perform this function.
The culverts will consist of 7/3000 by 1500 RCBCs (upstream IL = 0.90 mAHD, downstream IL = 0.85
mAHD, length 35m). Approximately 30 metres to the east a 2700 by 1200 RCBC (upstream IL
= = 1.35
mAHD, downstream IL 1.30 mAHD, length
=
12m)will be installed to drain local flows in this area.
=
The entry and exit losses were assumed to be 0.4 and 0.7 as wingwalls between 30 and 70 degrees will be
utilised, and scour resistant outlet pad will be installed (refer Section 7.16.2 of QUDM).
Northern Keyser Creek Crossing (Hollett Road East)
This crossing of the creek will provide access to Precincts A, B, C, D and E. The minimum road level is 4.00
mAHD. It is proposed that this crossing have 100 year ARI flood immunity (with climate change) and be
trafficable during a PMF event. The culverts will consist of 7/3300 by 1500 RCBCs (upstream IL = 0.85
mAHD, downstream IL = 0.80 mAHD, length = 35m).
The entry and exit losses were assumed to be 0.4 and 0.7 as wingwalls between 30 and 70 degrees will be
utilised, and scour resistant outlet pad will be installed (refer Section 7.16.2 of QUDM).
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 20
Page 27
Noosa on Weyba
Flood Study
~,.,CardnO.
Keyser Creek Tributary Crossing (Hollett Road East)
A crossing of this small tributary will be required to provide access to Precincts A, B, C, D, E, F and G. The
road level is quite variable. It is proposed that this road have 50 year ARI flood immunity and be trafficable
during a PMF event.
Several culvert crossings are required. They consist of 1/2700 by 1200 RCBC (upstream IL = 4.00 mAHD,
downstream IL = 3.75 mAHD, length = 25m); 1/600 RCP (upstream IL = 4.00 mAHD, downstream IL = 3.60
mAHD, length 25m); and 1/525 RCP (upstream IL 4.70 mAHD, downstream IL 4.50 mAHD, length
= = = =
25m). At other points along the road, underdrainage will be required for local overland flows.
This crossing is located to the north of the Noosa Wildlife Refuge. To allow for the safe passage of koalas
and other animals, between the Refuge and the environmental protection land on the subject site, the
minimum culvert height has been set at 1200mm, with a width of 2700mm. The Department of Main Roads
Fauna Sensitive Road Design (2000) indicates that culverts of this height have been known to allow for
passage of small, medium and large mammals, semi-arboreal mammals (which includes koalas),
microchiropteran bats, reptiles, birds, amphibians and introduced predators.
7.3 Proposed Stormwater Treatment
Numerous water sensitive urban design (WSUD)measures are proposed to treat stormwater. These include
bio-retention gardens and tree-pits located within the road reserve, vegetated swales, bio-retention swales,
bio-retention basins, litter baskets and rainwater tanks. For further details refer to the Stormwater
Management Plan (Cardno,October 2012). The proposed treatment measures will be located outside of the
100 year ARI extent of inundation. The waterway corridor will not be utilised for stormwater treatment
purposes; stormwater will be treated to a sufficient level before it is discharged to this area.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 21
Page 28
Noosa on Weyba
Flood Study
~,.,CardnO.
8 Developed Case Results
8.1 Peak Water levels
The developed case peak water levels are shown in Appendix F. The resultant impact on peak water levels
for the local and regional flood events are also shown in Figures 22 to 35.
J&K Hofmann Site
The 100 year ARI peak flood level (with climate change) around Precinct H is approximately 3.01 mAHD.
Therefore the minimum floor levels in this area are 3.51 mAHD.
The 100 year ARI peak flood level (with climate change) around the northern section of Precinct I is
approximately 3.48 mAHD. Therefore the minimum floor levels in this area are 3.98 mAHD. (refer above)
The remainder of Precinct I is well above the flood level of the tributary, even with the easement in place.
The 100 year ARI peak flood level (with climate change) around Precinct K is approximately 7.16 mAHD.
Therefore the minimum floor levels in this area are 7.66 mAHD.
The 100 year ARI peak flood level (with climate change) around Precinct L is a maximum of 5.40 mAHD.
Therefore the minimum floor levels in this area are 5.90 mAHD Precinct J is located well above the flood
level of the tributaries.
The 100 year ARI peak water level over Hollett Road West is variable but is approximately 7.40 mAHD at the
crest, with a maximum depth of 50mm. The PMF peak depth is approximately 270mm, which is considered
trafficable. The dV product across the road in a PMF event is approximately 0.20m2/s. The peak water levels
immediately upstream of this crossing have been increased in major flood events. However, the increase is
generally contained within the road reserve and does not extend a significant distance upstream.
The 100 year ARI peak water level across the proposed easement crossing is 4.36m AHD, resulting in a
flood depth of 60mm, and so it is trafficable in a 100 year ARI event. It also has 10 year ARI immunity. This
crossing does not have PMF trafficability. This crossing could potentially improve flood access for the
neighbouring Lake Entrance Boulevard area. The peak water levels upstream of the easement crossing are
increased. This increase is contained within the site.
The water levels downstream of the easement are decreased by approximately 6mm in the 100 year ARI
event and 10mm in the 20 year ARI event. This decrease extends up to Lake Entrance Boulevard. In the 2
and 1 year ARI events, there are some small areas of increase of approximately 6mm downstream of the
easement, near the confluence with Eenie Creek. These increases are contained within the waterway area.
It should be noted that additional attenuation provided by the proposed rainwater tanks and bio-retention
basins is likely to reduce this impact.
The filling of the three lots within Precinct I has not had a noticeable impact on peak flood levels in this area.
Northbrook Site
The 100 year ARI peak flood level (with climate change) around Precinct F and G are approximately 2.86
mAHD. Therefore the minimum floor levels in this area are 3.36 mAHD.
The 100 year ARI peak flood level (with climate change) within Lake Weyba is 2.72 mAHD. Therefore the
minimum floor level for lots adjacent to the lake (Precinct B) is 3.22 mAHD. The other precincts in this area
are well above the flood levels.
The Hollett Road East tributary crossing has a variable flood level upstream. The maximum depth of
flooding in the 100 year ARI event is approximately 80mm across the road. In the PMF event the maximum
flood depth is approximately 270mm, and the dV product across the road is 0.30m2/s. The peak flood levels
upstream of this crossing are increased, however this area is a designated nature refuge, and the increases
do not extend a significant distance.
The Hollett Road East crossing of Keyser Creek has 100 year ARI flood immunity. The PMF flood level is
controlled by the regional PMF event, and so the peak depth of flooding is approximately 230mm in this
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 22
Page 29
Noosa on Weyba
Flood Study
~,.,CardnO.
event. Therefore if necessary, this road level could be lowered to approximately 3.83 mAHD, and it would
still be trafficable in a PMF event.
The southern crossing of Keyser Creek has 100 year ARI flood immunity (with climate change). It is not
trafficable during a PMF event.
The Tidswell Road upgrade has 5 year ARI flood immunity, and it is trafficable in a 100 year ARI event (not
including climate change). During a PMF event, it has a depth of flow of approximately 730mm across it,
and is therefore not trafficable.
From the developed case results, it is clear that the impact of filling required for lots and road crossings is
that peak water levels are increased within the site for major flood events and immediately upstream of
upgraded road crossings. Due to the steep rise in surface levels upstream of Lot 11, the increase in peak
water levels within Lot 11 does not impact on upstream properties. In minor events, there are some
decreases in peak flood levels within the site and downstream. This is mainly due to the invert levels of the
proposed culverts being lower than the existing tracks, which improves flow conveyance during minor
events, and allows local peaks to exit the site before the peak flow from the remainder of the upstream
catchment arrives.
The developed case peak water levels within the 1 D section of the model, i.e. Lake Weyba and Weyba
Creek, are not different from the existing case levels.
8.2 Peak Flows
The developed case peak flows are shown in Appendix G.
J&K Hofmann Site
The easement crossing effectively reduces the peak flows being discharged into Eenie Creek for all ARI
events except for the 1 year ARI event, where there is a slight increase of 0.05 m3/s, which is equivalent to
approximately 2 percent. It should be noted that minor flow attenuation provided by the proposed rainwater
tanks and bio-retention basins is expected to further reduce this peak flow in minor events. The peak flows
directly upstream of the easement are less than the existing case due to the blockage of flows provided by
the crossing.
There are some points within Eenie Creek, upstream of where the site would discharge, where the flows
have been shown to be increased by approximately 0.5 percent. This is not considered to be a result of the
development, but rather a small model instability.
It should be noted that detention basins will be required for Precinct L and the northern part of Precinct I.
Northbrook Site
Downstream of Lot 11 the peak flows are less than the existing case for all ARI events. This is due to the
attenuation provided by the culvert crossings of Keyser Creek and its tributary.
At the confluence of Eenie and Keyser Creek, the peak flows are less than the existing case for all ARI
events.
8.3 Peak Velocities
The developed case peak velocities are shown in Appendix H.
J&K Hofmann Site
The peak velocities within the tributary have been reduced by approximately 0.1 m/s due to the blockage of
flow provided by the easement crossing.
Northbrook Site
The comparison points are located near the culvert inlets, which show localised increases in peak velocities
of approximately 0.5 m/s. Scour protection will be provided in these areas. In general, due to the restriction
of the flood area, the peak velocities are increased by approximately 0.1 m/s. The peak velocities in the
western drainage channel are still quite low, at approximately 0.3 m/s.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 23
Page 30
Noosa on Weyba
Flood Study
~,.,CardnO.
8.4 Flood Storage
The flood storage within Lot 11 on RP893393 for the existing and developed cases is shown below in Table
8-1. Due to filling required for lots and road crossings, the amount of storage on site has been reduced. At
2.25 mAHD, which is approximately the existing case 100 year ARI peak water level, the flood storage on
site has been reduced by around 25,600m3.
Local and regional flood modelling has shown that in major events under developed conditions, the peak
water level within the site is increased, but the impact on neighbouring areas is negligible. This is because
at the southern boundary of the site there is a sharp increase in surface levels, and so increases in flood
levels within the site do not extend upstream. The waterway corridor width at the southern boundary of the
site has also been widened to 190 metres, which is equal to the existing 100 year ARI flood width at this
point, so that local overland flow paths are not impeded.
Downstream of the site, the loss of flood storage within the site does not impact on flood levels for
neighbouring areas. Lake Weyba covers an area of 997 hectares. The volume of flood storage available
between 2.09 mAHD (which is the current 100 year ARI regional flood level in Lake Weyba) and 0.36 mAHD
(which is the MHWS level at Munna Point) is approximately 17,250,000m3. There is also significant
additional flood storage in the surrounding flood-plain areas. Therefore the loss of flood storage within the
site is minor when compared to the surrounding flood-plain and Lake Weyba.
Ta ble 81 - FI00d 5torage WI"thOIn L0t 11
11m
~twl[lri I
~ ~
(
ffil) ~ ~
ri1m:lmm I
3.00 175,024 106,454 -68,571
2.75 138,102 86,054 -52,048
2.50 105,537 67,913 -37,624
2.25 77,041 51,425 -25,616
2.00 52,515 36,422 -16,093
1.75 31,558 22,985 -8,573
1.50 14,689 11,563 -3,127
1.25 4,406 3,695 -711
1.00 422 342 -80
0.75 4 1 -3
0.50 0 0 0
Compensatory excavation within the site has not been proposed due to the potential environmental impacts.
It was considered beneficial to preserve the existing waterway and vegetation through Lot 11 in its current
state. Flood modelling has shown that compensatory excavation is not required for flood alleviation
purposes.
It is noted that the Noosa Council Strategic Plan (1995)states that: "filling of areas other than the designated
Urban Area is not acceptable. Therefore, rural township development and rural residential development
which occurs beyond the Urban Area should not involve filling of the floodplain". The filling proposed within
Lot 11 is located within the previous Maroochy Shire Council and therefore is not covered by the Noosa
Council Strategic Plan. In addition, the Noosa River flood modelling that was conducted in Mike 11, which
was used to inform the Strategic Plan, did not include Keyser Creek as flood storage as the model sections
did not extend across Lot 11.
The Sunshine Coast Regional Council Growth Management Position Paper (SCRC 2008) states that "new
urban development is avoided in flood prone areas and floodplains unless there is compelling justification
that demonstrates overriding community benefits and that any negative impacts resulting from development
can be appropriately and sustainably managed." The question of whether this proposed development can
constitute an overriding community benefit is beyond the scope of this report. This report will determine
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 24
Page 31
Noosa on Weyba
Flood Study
~,.,CardnO.
whether there are any negative impacts in relation to local and regional flooding as a result of this
development.
8.5 Sensitivity Analysis
8.5.1 Waterway Corridor Revegetation
A scenario was run proposed waterway corridor was densely revegetated, with a typical
where the
Manning’s n roughness of 0.15, to determine the potential impact on the 100 year ARI peak water levels.
This will determine whether revegetation would be feasible in this area.
Figure 36 shows the impact of revegetating the western drainage channel. The results are shown for the
100 year ARI events (local and regional) compared to the developed case without revegetation. The results
show an increase in water level of up to 100mm at the southern boundary of the site. The lot levels have
been set 500mm above the 100 year ARI peak flood level with climate change. Therefore there is
considered to be more than sufficient freeboard to account for this impact of revegetation.
Upstream of the Lot 11, there is a small area of increase in peak water level extending for a distance of
approximately 20 metres further upstream. The increase is approximately 10mm. However as this area is a
densely vegetated drainage channel, and no existing properties are impacted, this localised increase is
considered to be acceptable. Dense revegetation of the western drainage channel is therefore considered to
be achievable with acceptable flood impacts for the site and surrounding properties.
8.5.2 Culvert Blockage
A scenario was also run with 20 percent blockage of the proposed culverts. This will determine whether
additional freeboard would be required.
The results are shown for the 100 year ARI events (local and regional) compared to the developed case
without blockage. The base case assumed no blockage as the culvert crossings are also being utilised for
attenuation of peak flows, and reducing the flow capacity would have reduced peak flows downstream.
The average impact of 20 percent culvert blockage was:
. Hollett Road West: 25mm increase in upstream peak water level;
. Easement crossing: 30mm increase in upstream peak water level;
. Hollett Road East tributary crossing: 60mm increase in upstream peak water level;
. Hollett Road East: 20mm increase in upstream peak water level;
. Southern Keyser Creek crossing: 30mm increase in upstream peak water level; and
. Tidswell Road: 20mm increase in upstream peak water level.
The freeboard provided is considered to be sufficient to account for these increases. The peak depths over
the road will be slightly increased, however it is considered that this will not impact on the level of trafficability
as current peak depths in the PMF and 100 year ARI events are less than the limiting values.
8.6 Proposed Emergency Evacuation Routes
Figures 38 and 39 show the PMF peak flood levels and depths. There are high points within each section of
the development where people could safely congregate in a PMF event. In particular Precincts E and L,
which are proposed retirement villages and aged care facilities are well above the PMF flood level.
Access for emergency vehicles may be required in a PMF event. The emergency evacuation routes are
shown in Figure 14. All areas of the site can be accessed during a PMF event. For Precinct F, they would
need to utilise the formalised fire track along the southern boundary of the site and then exit the site via the
Hollett Road East crossing of Keyser Creek.
Flood access for neighbouring areas will also be improved, as described below.
. The existing property to the south of Lot 11 is inaccessible during a 5 year ARI event. This lot would
have access during a PMF event.
. The existing properties located around Precinct L would also have access along Hollett Road West
improved from 10 year ARI trafficability to PMF trafficability.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 25
Page 32
Noosa on Weyba
Flood Study
~,.,CardnO.
. The Lake Entrance Boulevard area is inaccessible during a 2 year ARI event. The proposed
easement is trafficable during a 100 year ARI event (with climate change).
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 26
Page 33
Noosa on Weyba
Flood Study
~,.,CardnO.
9 CONCLUSION
The proposed development of Noosa on Weyba has been shown through TUFLOW modelling to:
. have no adverse impacts on flood levels and flows for surrounding properties for local and regional
flood events;
. reduce the 100 year ARI event the peak flood level around Lake Entrance Boulevard due to flow
attenuation being proposed within the site;
. provide 100 year ARI trafficability for all proposed and upgraded roads;
. provide PMF evacuation routes for all areas of the site; and
. improve flood access for neighbouring properties.
The flood levels used to set the development levels for the site do include the potential impact of climate
change.
The proposed filling within the site will reduce available flood storage, although compared to the available
storage in Lake Weyba and the surrounding floodplain, the reduction is minimal. Flood modelling has shown
that the impact of the reduced flood storage is contained within the site.
Dense revegetation of the western drainage channel is considered to be achievable with acceptable flood
impacts for the site and surrounding properties should this be desirable.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 27
Page 34
Noosa on Weyba
Figure 1 Site Location
Figure 2 WBNM Sub-catchments
Figure 3 TUFLOW Model Setup
Figure 4 TUFLOW Comparison Points
Figure 5 Existing Case OEM
Figure 6 100 Year ARI Existing Case Peak (Local and Regional)
Figure 7 100 Year ARI Existing Case Pe Depth ( I and Regional)
Figure 8 100 Year ARI Existing Case Pe ocal and Regional)
Figure 9 10 Year ARI Existing Case Pea (Local and Regional)
Figure 10 2 Year ARI Existing Case I (Local and Regional)
Figure 11 February 2012 Flood Event I
Figure 12 100 Year ARI Existing with Climate Change
Figure 13 Proposed Development P n
Figure 14 Evacuation Routes
Figure 15 Developed Case OEM
<.l’’’) Cardnoo>
Shaping the Future
Page 35
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright
OCDB;
Northb ok acordnewilh
0 or
d o c u m
not in e n t Cardno AIrialmge
or
on be
any
In
FLO D NO SA
reliance u s e d ,
I
the
Drawn: third asume produced mediasol,d, whole(Old) .orfromad
O:\51~-903FiguresRVl Corpatin reponsiblty
site Is
by
any kl
and Ply STUDY ON
J.M.I party lhaterms transfed, Cardno person partevery
on
by
any Ltd
All
Go gB
Earth
WEYBA
tna
or of other copied of Rights
Flo d
Pty Checkd: retain.
content liablity the (Old)Ply than this
of
r e p
by
o d u
or
c e drawing Res rved
Study\Figre Ltd this
N.G.I document.
Ltd
whal80evr Cardno agremnt belongs
solely
lor
In
20t
2.
the wilh whole to
1- to
any (Old)
Site
Date: third PlyL1d ben flt Cardno part CWdno
or
In
[()<1tion,dwg party does and (Old) (Old)
of
In
18/0921 aris ng not use PtyUd. any l1D
out
01
by
or
Ply
man er and
. 250
.
.
0
250
500
750
1000
I
1250m
125,0
h
SITE
Stradboke c: : J LEG ND
<.r)Cadn
NP
PRINT
Project Scale Site ~
t
L510/93 OCATIN FIGURE :25,0
DA
TE:
1
18
NP
October.
2012
No.:
Island boundary
-
2: 3pm 1 (A3)
Page 36
o
~
Figure 2 o
~
,
~
WBNM Sub-catchments to
6
~
"Tl
<is.
e
(i
(/)
Noosa on Weyba ;0
~
Flood Study ~
"Tl
6"
o
Q.
UJ
LEGEND N Q.
’<
W+E
S
D WSNM Catchment
Waterway
Cocos
Lake Weyba
LW_64
997.2ha
350 o 350 700 1050
Metres
Scale: 1 :35,000
eJ.., Cardno Shaping the Future
Cardno (QLD)Pty Ltd I ABN 57 051 074992
Level 11 North Tower, 515 St Pauls Terrace
,
Locked Bag 4006, Fortitude Valley QLD 4006
Tel: 0733699822 Fax: 07 3369 9722
"@2009 Cardno (Old)Ply Ltd All Rights Reserved. Copyright in the W10Ie and e\ery part of this document
belongs to Cardno (00)Ply Lid and may nol be used, sold, transferred, copied or reproduced in YAloIe or
part in any manner or form or in or on any media to any person v.ithoullhe prior writlel1 consent of
Cardno (00)Ply LId."
This document is produced by Cardno (00)Ply Lid solely for the benefit of and use by the cfieot in
accordance.,..;th the terms of the retainer. Cardno (Old)Ply LId does not and shall not assume any
responsibility or ~ability v.tlatsoe’ to any third party arising out of any use or reliance by any third party
the content of this document.
SHEET A3
Project No: 5101-19-03
Date: 15 October 2012
Revision Number:
Designed by:
Client Name: Northbrook Corporation Pty Ltd
Page 37
o
~
Figure 3 o
~
,
~
TUFLOW Model Setup to
6
~
’Tl
<is’
e
(i
(/)
Noosa on Weyba ;0
~
~
Flood Study ’Tl
6’
o
Q.
UJ
LEGEND N Q.
’<
W+E .~
Roughness Values
Remaining areas dense vegetation
IJ waterway
g urban area
~ grass, few trees
I!!il roadway
Culvert
20/10 Connection or 20 inflow
c::::= 20 Inflow
c=J OCOB
L!:::fJ 20 Model Extent
Site
"
0-
\
:..
Image sourced from Nearmap, 2012
125 o 125 250 375
Metres
Scale: 1 :12,500
eJ.., Cardno Shaping the Future
Cardno (QLD)Pty Ltd I ABN 57 051 074992
Level 11 North Tower, 515 St Pauls Terrace
,
Locked Bag 4006, Fortitude Valley QLD 4006
Tel: 0733699822 Fax: 07 3369 9722
"@2009 Cardno (Old)Ply Ltd All Rights Reserved. Copyright in the W10Ie and e\ery part of this document
belongs to Cardno (00)Ply Ltd and may not be used, sold, transferred, copied Of reproduced in YAloIe or
part in any manner or form or in Of on any media to any person v.ithout the prior writlel1 consent of
Cardno (00)Ply LId."
This document is produced by Cardno (00)Ply Lid solely for the benefit of and use by the cfieot in
accordance.,..;th the terms of the retainer. Cardno (Old)Ply LId does not and shall not assume any
responsibility or ~ability v.tlatsoe’ to any third party arising out of any use or reliance by any third party
the content of this document.
SHEET A3
Project No: 5101-19-3
Date: 18 October 2012
Revision Number:
Designed by:
Client Name: Northbrook Corporation Ply LId
Page 38
o
~
Figure 4 o
~
,
~
Comparison Points to
6
~
"Tl
<is.
e
(i
(/)
Noosa on Weyba ;0
~
~
Flood Study "Tl
o
o
0.
UJ
e-
LEGEND N o.
’<
W+E
S
Water Level/Velocity
o
Comparison Point
Flow Comparison Line
c=J OCOB
’1::t::fl 20 Model Extent
Site
;....
\
Image sourced from Nearmap, 2012
125 o 125 250 375
Metres
Scale: 1 :12,500
eJ.., Cardno Shaping the Future
Cardno (QLD)Pty Ltd I ABN 57 051 074992
Level 11 North Tower, 515 St Pauls Terrace
,
Locked Bag 4006, Fortitude Valley QLD 4006
Tel: 0733699822 Fax: 07 3369 9722
"@2009 Cardno (Old)Ply Ltd All Rights Reserved. Copyright in the W10Ie and e\ery part of this document
belongs to Cardno (00)Ply Ltd and may not be used, sold, transferred, copied Of reproduced in YAloIe or
part in any manner or form or in Of on any media to any person v.ithout the prior writlel1 consent of
Cardno (00)Ply LId."
This document is produced by Cardno (00)Ply Lid solely for the benefit of and use by the cfieot in
accordance.,..;th the terms of the retainer. Cardno (Old)Ply LId does not and shall not assume any
responsibility or ~ability v.tlatsoe’ to any third party arising out of any use or reliance by any third party
the content of this document.
SHEET A3
Project No: 5101-19-3
Date: 18 October 2012
Revision Number:
Designed by:
Client Name: Northbrook Corporation Ply LId
Page 39
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright
Ndev_plan; orthb ok
OCDB:
0 or
document Cardno
not in
or
on be
any
In
FLO D NO SA
reliance as ume media, used, (Old)
I
the
Drawn: third acordnewith produced sold, whole
O:\51~-903FiguresRVl Corpatin reponsiblty
Is
by
any jQ
and Ply STUDY ON
site;
J,M party lhat 1ransIed, Cardno person fJVery
by
any LId
All WEYBA
Top_ED6 Flo d I on
tne
or of
nns
other copied
part
of Rights
Ply Checkd: retain.
content liablity the (Old)Ply than this
of
r e p
by
o d u
or
c e drawing Res rved
Study\Figre Ltd this
N.G.I document
Ltd
whal80evr Cardno agremnt belongs
solely
lor
In
20t
2.
the with whole to
5
to
any (Qld)
-
Existng Date: third PlyL1d ben fit Cardno part CWdno
or
In
party d09 and (Old) (Old)
of
case In
DEM,dwg 18/0921 aris ng not use PtyUd. any ltd
out
01
by
Ply
man er and
or
125
.
.
.
0
125
EXISTNG 250
CCCCCC_ _ _ _ _ _ _ _ _ _ _ _ _ _ Level c: : J LEG ND
<.r)Cadn
0 33
-0
200 250 00 50 400 450 500 550 600 650 700 750 800 (mAHO)
PRINT
DA
TE:
18
Project
CASE FIGURE Scale
1
:
375
500
Below 50
to
00
to
-0.50 000 050 05to10 10to.50 150to2.0 to to to to to to to to to to to to to
Above
2.50 300 3.50 4.00 4.50 5.00 550 6.00 650 7.00 7.50 8.00 850 850
Site
boundary
~
t
No.:
October,
12,50 625m I
2012
-
11:20
m
510/93 OEM (A3) 12,50 5
Page 40
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright
Ndev_plan; orthb ok
OCDB:
0 or
document Cardno
not in
or
on be
any
In
FLO D NO SA
reliance as ume media, used, (Old)
I
the
Drawn: third acordnewith produced sold, whole
O:\51~-903FiguresRVl Corpatin reponsiblty
Is
by
any jQ
and Ply STUDY ON
site;
J.M.I party lha1ransIed,t Cardno person fJpartVery
on
nns
by
any LId
All WEYBA
other copied Rights
Max_E0S6t1uQdyy\LFoicgRergeh Checkd: repoduce
tne of
or of
Flo d content liablity the (Old)Ply than this or
Ply of
this
retain. drawing Res rved
Ltd by
N.G.I document whal80evr Cardno agremnt belongs 20t
Ltd solely In
lor 2.
(Qld) the with whole
6
- to to
yr
100
Date: tanyhird Ply ben fit Cardno CWdno
L1d of
or
In
ARI part(Old)
party d09 and (Old) In
Existng
case
peak
18/0921 aris ng not use PtyUd. any ltd
out
01
by
or
Ply
man er and
WL
(Lo(al
and
Re:gional),dw
_/ J
100
YEAR
ARI
EXISTNG
CASE
PEAK
WATER
LEVEL .
.
125
(LOCAL
.
I)
125
_ _ _ _ _ C _ _ _ C C C C _ _ _ _ _ _ _ _ _ _ Peak
AND 250 c: : J LEG ND
<.r)Cadn
2 3333 4 5 67
Below 050 100 150 200 250 275 425 450 475 00 550 600 50 00 750 Above Water
PRINT
Project Scale 500
375 25 00 25 50 75 00
to to to to to to to to to to to to to to to to to to to to to
050 100 150 2.00 2.25 2.50 275 300 3.25 3.50 3.75 400 4.50 4.75 500 50 600 6.50 7.00 7.50 800 8.00 Level
Site
boundary
~
t
REGIONAL) FIGURE
4 5
DA
TE:
18
1
:
25
No.:
October,
12,50 625m I
(mAHO)
2012
-
B:56am 510/93 6 (A3) 1 2,50
Page 41
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright
Ndev_plan; orlhb ok
OCDB:
0 or
document Cardno
not in
or
on be
any
In
FLO D NO SA
reliance as ume media, used, (Old)
I
the
Drawn: third acordnewith produced sold, whole
O:\51~-903FiguresRVl Corpatin reponsiblty
Is
by
any jQ
and Ply STUDY ON
site;
J.M.I party lha1ransIed,t Cardno person fJpartVery
on
nns
by
any LId
All WEYBA
other copied Rights
Max_E0S6t1uQdyy\LFoicgRerged Checkd: repoduce
tne of
or of
Flo d content liablity the (Old)Ply than this or
Ply of
this
retain. drawing Res rved
Ltd by
N.G.I document whal80evr Cardno agremnt belongs 201.
Ltd solely In
lor
(Qld) the with whole
7
- to to
yr
100
Date: tanyhird Ply ben fit Cardno CWdno
L1d of
or
In
ARI part
party d09 and (Old) (Old) In
Existng
case
peak
18/0921 aris ng not use PtyUd. any ltd
out
01
by
or
Ply
man er and
depth
(Lo(al
and
Regional,dw
"-._
,
./ :" : ,
"
I
~
,p [.,lq:
.H~ _~
. " ’V
.-rI ’~or- J’,/t>l".’13," , ~
I
~
_:
~, "’."
)
1~"’’’,:!!, ~.
100
.
~’
.
,
.:
:..
,.’
YEAR
.
1(\0
ARI
,-.) ,I’
,’J. ’.
~
\ \’" ~1’{" .
_
,
"/~ "’:.-
,_
EXISTNG
’
1,1
.
0"
./ I.r" \’~. "’
CASE
PEAK
DEPTH 125
.
.
.
(LOCAL
0
125
250 _ _ _ _ C _ _ C C _ _ _ _ _ _ _ Peak c: : J LEG ND
AND
Above Depth
<.r)Cadn
1 1
0 0 00 0 2
100 25 50 175 200 225 50 300 400
PRINT
Project Scale
375 Below 01 15 30 50 75
to to to to to to to to to to to to to to (m)
Site
boundary
~
t
REGIONAL) 001 0.15 OJO 0.50 100 125 150 175 200 225 2.50 100 4.00 500 5.00
DA 0
500
F I G U R E
TE:
18
1
: 75
No.:
October,
12,50 I
625m
2012
-
B:57am 510/93 1 2,50 7 (A3)
Page 42
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright
Nde:v_plan; orthb ok
OCDB:
0 or
document Cardno
not in
or
on be
any
In
FLO D NO SA
reliance as ume media, used, (Old)
I
the
Drawn: third acordnewith produced sold, whole
O:\51~-903FiguresRVl Corpatin reponsiblty
Is
by
any jQ
and Ply STUDY ON
site:;
J.M.I party lha1ransIed,t Cardno person fJpartVery
on
nns
by
any LId
All WEYBA
other copied Rights
Max_E06StluQdyyL\oFciRge:greV Checkd:
tne of
or of
Flo d content liablity the (Old)Ply than this or
Ply
retain. drawing Res rved
Ltd
of
this
Ltd
r e p
by
o
whal80evr Cardno agremnt belongs
solely d u c e
N.G.I document lor
In
20t
2.
the with whole to
8
to
any (Qld)
-
yr
100
Date: third PlyL1d ben fit Cardno part CWdno
or
In
ARI
party d09 and (Old) (Old)
of
In
Existng
case
peak
18/0921 aris ng not use PtyUd. any ltd
out
01
by
or
Ply
man er and
velocity
(Local
and
Regional,dw
100
YEAR
ARI
EXISTNG
CASE
PEAK
VELOCITY 125
.
.
(LOCAL
.
0
125
_ _ _ _ c... _ _ C C C _ _ _ _ _ _ Peak c: : J LEG ND
AND 250
<.r)Cadn
1 1 1
00 0
375 Below 01 15 030 50 075 100 25 50 75 200 225 250 300 400 Above Velocity Site
~
t
PRINT
Project Scale to to to to to to to to to to to to to to
boundary
REGIONAL) FIGURE 0.01 0.15 30 050 0.75 100 1.25 150 175 2.00 2.25 2.50 300 400 5.00 5.00
0
DA
TE:
18
1
:
500 (m/sl
No.:
October,
12,50 625m I
2012
1 :21am
-
510/93 8 (A3) 1 2,50
Page 43
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright
Ndev_plan; orthb ok
OCDB:
0 or
document Cardno
not in
or
on be
any
In
FLO D NO SA
reliance as ume media, used, (Old)
I
the
Drawn: third acordnewith produced sold, whole
O:\51~-903FiguresRVl Corpatin reponsiblty
Is
by
any jQ
and Ply STUDY ON
site;
J.M.I party lha1ransIed,t Cardno person fJpartVery
on
nns
by
any LId
All WEYBA
other copied Rights
Max_ES06tu1dyy\LFoicgRer9eh Checkd: repoduce
tne of
or of
Flo d content liablity the (Old)Ply than this or
Ply of
this
retain. drawing Res rved
Ltd by
N.G.I document whal80evr Cardno agremnt belongs 20t
Ltd solely In
lor 2.
(Qld) the with whole
9
- to to
yr
10
ARI
Date: tanyhird Ply ben fit Cardno CWdno
L1d of
or
In
part(Old)
party d09 and (Old)
Existng In
case
peak
18/0921 aris ng not use PtyUd. any ltd
out
01
by
or
Ply
man er and
WL
(LocaL
and
Regional),dw
10
YEAR
ARI
EXISTNG
CASE
PEAK
WATER
LEVEL .
.
125
(LOCAL
.
I)
125
_ _ _ _ _ C _ _ _ C C C C _ _ _ _ _ _ _ _ _ _ Peak
AND 250 c: : J LEG ND
<.r)Cadn
2 3333 4 5 67
Below 050 100 150 200 250 275 425 450 475 00 550 600 50 00 750 Above Water
PRINT
Project Scale 500
375 25 00 25 50 75 00
to to to to to to to to to to to to to to to to to to to to to
050 100 150 2.00 2.25 2.50 275 300 3.25 3.50 3.75 400 4.50 4.75 500 50 600 6.50 7.00 7.50 800 8.00 Level
Site
boundary
~
t
REGIONAL) FIGURE
4 5
DA
TE:
18
1
:
25
No.:
October,
12,50 625m I
(mAHO)
2012
-
B:56am 510/93 9 (A3) 1 2,50
Page 44
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright
Ndev_plan; orthb ok
OCDB:
0 or
document Cardno
not in
or
on be
any
In
FLO D NO SA
reliance as ume media, used, (Old)
I
the
Drawn: third acordnewith produced sold, whole
O:\51~-903FiguresRVl Corpatin reponsiblty
Is
by
any jQ
and Ply STUDY ON
site;
J.M.I party lha1ransIed,t Cardno person fJpartVery
on
nns
by
any LId
All WEYBA
Rights
Max_ES0t6udLyy\FoicgRergeh Checkd: repoduce other copied
tne of
or of
Flo d content liablity the (Old)Ply than this or
Ply of
this
retain. drawing Res rved
Ltd by
N.G.I document whal80evr Cardno agremnt belongs 20t
Ltd solely In
lor 2.
(Qld) the with whole
10
to to
-
yr
2
ARI
Date: tanyhird Ply ben fit Cardno CWdno
L1d of
or
In
part(Old)
party d09 and (Old)
Existng In
case
peak
18/0921 aris ng not use PtyUd. any ltd
out
01
by
or
Ply
man er and
WL
(LocaL
and
Regional),dw
,. _~
2
YEAR
ARI
EXISTNG ."\
..
...
CASE
PEAK
WATER
LEVEL .
.
125
(LOCAL
.
I)
125
_ _ _ _ _ C _ _ _ C C C C _ _ _ _ _ _ _ _ _ _ Peak
AND 250 c: : J LEG ND
<.r)Cadn
2 3333 4 5 67
Below 050 100 150 200 250 275 425 450 475 00 550 600 50 00 750 Above Water
PRINT
Project Scale 500
375 25 00 25 50 75 00
to to to to to to to to to to to to to to to to to to to to to
050 100 150 2.00 2.25 2.50 275 300 3.25 3.50 3.75 400 4.50 4.75 500 50 600 6.50 7.00 7.50 800 8.00 Level
Site
boundary
~ t
REGIONAL) FIGURE 12,50
4 5
DA
TE:
18
1
:
25
No.:
October, I
625m (mAHO)
2012
-
B:53am 510/93 10 (A3) 1 2,50
Page 45
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright
Ndev_plan; orthb ok
OCDB:
0 or
document Cardno
not in
or
on be
any
In
FLO D NO SA
reliance as ume media, used, (Old)
I
the
Drawn: third acordnewith produced sold, whole
O:\51~-903FiguresRVl Corpatin reponsiblty
Is
by
any jQ
and Ply STUDY ON
site;
J.M.I party lha1ransIed,t Cardno person fJpartVery
on
by
any LId
All WEYBA
Max_E06Feb12h Checkd:
nns
tne
or of other copied of Rights
Flo d content liablity the (Old)Ply than this or
Ply
retain. drawing Res rved
Study\Figre Ltd
of
this
Ltd
r e p
by
o
whal80evr Cardno agremnt belongs
solely d u c e
N.G.I document lor
In
20t
2.
the with whole to
11
to
any (Qld)
-
Februay Date: third PlyL1d ben fit Cardno part CWdno
or
In
party d09 and (Old) (Old)
of
2012 In
Flo d
event
18/0921 aris ng not use PtyUd. any ltd
out
01
by
or
Ply
man er and
Peak
WL.d .g
~/ ~
FEBRUAY
2012
FLO D
EV NT -
125
.
.
.
0
125
PEAK 250 _ _ _ _ _ C _ _ _ c: : - r=... C C _ _ _ _ _ _ _ _ _ _ Peak c: : J LEG ND
<.r)Cadn
22 3334 5 7
Below 050 100 150 200 300 25 50 75 00 425 450 475 00 550 600 650 00 750 Above Water
PRINT
Project WATER Scale 375
to to to to
25to.0
50 75
to to to to to to to to to to to to to to to to
0.50 100 150 2.00 225 2.75 3.00 325 50 3.75 4.00 4.25 450 75 500 5.50 6.00 650 700 7.50 8.00 8.00 Level
Site
boundary
~
t
FIGURE 12,50
DA 3 4
TE:
1
500
18 :
No.:
October, (mAHO)
510/93 LEVEL (A3) 12,50
2012
625m
I
-
B:54am 11
Page 46
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright
Ndev_plan; orthb ok
OCDB:
0 or
document Cardno
not in
or
on be
any
In
FLO D NO SA
reliance as ume media, used, (Old)
I
the
Drawn: third acordnewith produced sold, whole
O:\51~-903FiguresRVl Corpatin reponsiblty
Is
by
any jQ
and Ply STUDY ON
site;
J,M.I party lha1ransIed,t Cardno person fJpartVery
on
by
any LId
All WEYBA
M~)(S_tEu0d6y\1FQigyreh Checkd:
nns
tne
or of other copied of Rights
Flo d content liablity the (Old)Ply than this or
Ply
retain. drawing Res rved
Ltd
of
this
Ltd
r e p
by
o
whal80evr Cardno agremnt belongs
solely d u c e
N,G,I document lor
In
20t
2.
the with whole to
12
to
any (Qld)
-
yr
100
Date: third PlyL1d ben fit Cardno part CWdno
or
In
ARt
party d09 and (Old) (Old)
of
In
Existng
case
Peak
18/0921 aris ng not use PtyUd. any ltd
out
01
by
or
Ply
man er and
WL
with
(Cdwg
/
~/
100
YEAR
ARI
EXISTNG
CASE
PEAK
WATER
LEVEL 125
.
.
WITH .
0
125
CLIMATE 250 _ _ _ _ C _ _ _ C C c:- c: :. . C _ _ _ _ _ _ _ _ _ Peak c: : J LEG ND
Water
<.r)Cadn
1
2 2 33 3 3 4 4 6
n,{\ 00 150 200 25 250 75 00 25 50 75 00 4.25 450 75 500 550 600 50 700 750
PRINT
Project Scale
375
L_ to to to to to to to to to to to to to to to to to to to to
Above
Level
Site
boundary
~
t
FCHANGE IGURE 12,50 ’1/ (\ 1.50 2.00 2.25 250 275 100 125 150 75 400 4.25 4.50 4.75 500 550 6.00 6.50 lOO 750 800 8.00
DA 3
TE:
1
500
18 :
No.:
October, I
625m (mAHO)
2012
-
B:54am 510/93 12 (A3) 1 2,50
Page 47
NOOSA ON WEYBA
FLOOD STUDY
<.J’:)Cardn
----~
rEJ
LEGEND
c=J Site boundary
_ Culverts
1m Contours
~
Tidswell Road
225 300 375m
3/15~~ _ _ _ 17500
Cardno (Old)Pty LId All Rights Reserved 2012
Scale 1 :7,500 (A3)
Copyright in the whole and every part olthis drawing tlelongslo Cardno (Old)Ply LId and
may not be used, sold, transferred, copied or reproduced in whole orin partin any manneror
/
3/1500.6
form or on any media, to any person olher than by agreemenlwilh Cardno (Old)Ply Ltd. FIGURE 13
This document is produced by Cardno (Old) Ply LId solelyforthebenefitofand useby
the client in accordance wilh the terms olllle relainer.Cardno (Qld)Pty LId doesnol
and shall not assume any responSibility orliabilily whalsaeverloany thrd party arising auto! PROPOSED DEVELOPM ENT PLAN
any use orreliance by Il’Iird party on Iheconlenloflhisdocument.
Rev: 0 I Drawn: J.M.I Checked: N.G.I Date: 18/10/2012 Project No.: 5101/19/3
PRINT DATE: 1800ober. 2012 3:15pm
Northbrook Corporation Pty Ltd -
CAD FILE: O:\5101-19-03\Figures.\R1V1 Flood Study \Figure 13 -
Propo’ied Development Plan.dwg
XREF.’i: DCDB; dev_plan; sile; ld_ll\<lk_culverls_D08
Page 48
NOOSA ON WEYBA
FLOOD STUDY
<.J’:)Cardn
"’~
~
Site boundary
_ Culverts
1m Contours
PMF Trafficable Route
100 Year ARI Trafficable Route
50 Year ARI Trafficable Route
75 75 150 225 300 375m
_ _ _ 17500
I:! Scale 1:7,500 (A3)
Copyright in the wind e ry part olthis drawing tlelongslo Cardno (Old)Ply LId and
may not be use, so ,Ira sferred, copied or reproduced in whole orin partin any manneror
form or on any me 13, to any person olher than by agreemenlwilh Cardno (Old)Ply Ltd. FIGURE 14
This document is produced by Cardno (Old) Ply LId solelyforthebenefitofand useby
the client in accordance wilh the terms olllle relainer.Cardno (Qld)Pty LId doesnol
and shall not assume any responSibility orliabilily whalsaeverloany thrd party arising auto! FLOOD EVACUATION ROUTES
any use orreliance by Il’Iird party on Iheconlenloflhisdocument.
Rev: 0 I Drawn: J.M.I Checked: N.G.I Date: 18/10/2012 Project No.: 5101/19/3
PRINT DATE: 18 October, 2012 3:30pm
Northbrook Corporation Pty Ltd -
CAD FILE: O:\5101-19-03\Figures\R1Vl Flood Study \Figure 14 - Flood Evacuation Routes.dwg
XREF’s: DCDB; dev_plan; site; ld_ll\<lk_culverts_D08; ld_nwk_culverts_D!l7
Page 49
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright ~
Ndev_plan; orthb ok Drawn: acordne document Cardno FLO D NO SA
;I
or
0 or on be
OCDB: not in
any
In
reliance as ume used, the
I
O:\51~-903FiguresRVl Corpatin reponsiblty
Is
by
third any produced
mediasol,d, whole(Old)
jQ
and Ply STUDY ON
site;
J.M.I party lhat by
with
1ransIed, Cardno person fJVery
any LId
All WEYBA
Top_D08 Flo d on
tne
or of
nns
other copied
part
of Rights
Ply Checkd: retain.
content liablity the (Old)Ply than this
of
r e p
by
o d u
or
c e drawing Res rved
Study\Figre Ltd this
N.G.I document
Ltd
whal80evr Cardno agremnt belongs
solely
lor
In
20t
2.
the with whole to
15
to
any (Qld)
-
Devloped Date: third PlyL1d ben fit Cardno part CWdno
or
In
party d09 and (Old) (Old)
of
In
DEM,dwg 18/09 2 1
(a~e Ply
aris ng not use PtyUd. any ltd
out
01
by
man er and
or
100
.
.
.
0
DEVLOPD 100
200
CCCCCC_ _ _ _ _ _ _ _ _ _ _ _ _ _ Level c: : J LEG ND
<.r)Cadn
0 33
-0
200 250 00 50 400 450 500 550 600 650 700 750 800 (mAHO)
PRINT
DA
TE:
18
Project
CASE FIGURE Scale
1
:
300
400
Below 50
to
00
to
-0.50 000 050 05to10 10to.50 150to2.0 to to to to to to to to to to to to to
Above
2.50 300 3.50 4.00 4.50 5.00 550 6.00 650 7.00 7.50 8.00 850 850
Site
boundary
~
t
No.:
October,
12,50 SO m I
2012
-
9:14am 510/93 DEM 15 (A3) 10.0
Page 50
Noosa on Weyba
Figure 16 100 Year ARI Developed Case Water Level (Local and
Regional)
Figure 17 100 Year ARI Developed Case Pe (Local and Regional)
Figure 18 100 Year ARI Developed Case (Local and Regional)
Figure 19 10 Year ARI Developed Peak Water Level (Local and
Regional)
Figure 20 2 Year ARI Developed Case I (Local and Regional)
Figure 21 100 Year ARI Developed Climate
Change
Figure 22 Flood Level Impact -
Design vent 1 (10 Year ARI Local)
Figure 23 Flood Level Impact -
Desig Event 2 (50 ear ARI Local)
Figure 24 Flood Level Impact -
Desi Event 3 (20 ear ARI Local)
Figure 25 Flood Level Impact -
Desi n Event 4 (10 ear ARI Local)
Figure 26 Flood Level Impact -
n Event 5 (5Y ar ARI Local)
Figure 27 Flood Level Impact -
ign Event 6 (2Y ,ar ARI Local)
Figure 28 Flood Level Impact -
ign Event 7 (1 Y ar ARI Local)
<..D Carclnoo>
Shaping the Future
Page 51
@
XREF’s: FICADLE: Rev: anyU6e sandhal cthelient This form notmay Copyright
Ndev_plan; orthb ok
OCDB:
0 or
document Cardno
not in
or
on be
any
In
FLO D NO SA
reliance as ume media, used, (Old)
I
the
Drawn: third acordnewith produced sold, whole
O:\51~-903FiguresRVl Corpatin reponsiblty
Is
by
any jQ
and Ply STUDY ON
site;
J.M.I party lha1ransIed,t Cardno person fJpartVery
on
nns
by
any LId
All WEYBA
other copied Rights
Max_0S8tuHdOyy\LFoicgRergeh Checkd:
tne of
or of
Flo d content liablity the (Old)Ply than this or
Ply
retain. drawing Res rved
Ltd
of
this
Ltd
r e p
by
o
whal80evr Cardno agremnt belongs
solely d u c e
N.G.I document lor
In
20t
2.
the with whole to
16
to
any (Qld)
-
yr
100
Date: third PlyL1d ben fit Cardno part CWdno
or
In
ARI
party d09 and (Old) (aid)
of
In
Dev
case
Peak
WL
18/0921 aris ng not use PtyUd. any ltd
out
01
by
or
Ply
man er and
(Lo(al
and
Regional),dw
_/ J
100
YEAR
ARI
DEVLOPD
CASE
PEAK
WATER
LEVEL .
.
125
.
(LOCAL
0
125
250 _ _ _ _ _ C _ _ _ _ C C C _ _ _ _ _ _ _ _ _ _ Peak c: : J LEG ND
AND
<.r)Cadn
2 2 333 3 4
Below 050 100 150 200 250 425 450 475 500 550 600 650 700 750 Above Water
PRINT
Project Scale
375 25 75 00 25 50 75 00
to to to to to to to to to to to to to to to to to to to to to
050 100 1.50 2.00 2.25 250 275 3.00 3.25 3.50 375 400 4.25 4.50 4.75 500 550 6.00 6.50 7.00 750 800 8.00 Level
Site
boundary
~
t
REGIONAL) FIGURE 12,50
DA
TE:
1
500
18 :
No.:
October, I
625m (mAHO)
2012
-
1:59pm 510/93 16 (A3) 1 2,50
The text continues on page 52.
Used in these records
About this file