Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
<..f)Cardno
Design Events
1. 100 Year ARI Local 6. 2 Year ARI Local 11. 50 Year ARI Regional 16. PMF
2. 50 Year ARI Local 7. 1 Year ARI Local 12. 20 Year ARI Regional 17. 100 Year ARI Climate
3. 20 Year ARI Local 8. 100 Year ARI Storm Surge 13. 10 Year ARI Regional Change
4. 10 Year ARI Local 9. 100 Year ARI Storm Surge 14. 5 Year ARI Regional 18. 100 Year ARI Climate
5. 5 Year ARI Local 10. 100 Year ARI Regional 15. 2 Year ARI Regional Change
Table G 1 Existing Case Peak Flows
Existing Case Peak Flows (m3/s)
Design Event
Comparison 17
Location 8 and
Point 1 2 3 4 5 6 7 10 11 12 13 14 15 16 and
9
18
upstream of
01 23.3 19.1 16.4 12.4 9.4 5.2 2.9 23.3 13.4 11.2 9.3 7.3 5.8 3.5 98.0 28.9
Lot 11
02 Lot 11 25.8 21.2 17.9 13.6 10.2 5.6 3.1 25.8 15.0 12.6 10.5 8.3 6.6 3.9 97.2 31.5
downstream
03 28.7 23.6 20.1 15.2 11.6 6.6 3.8 28.7 18.9 16.0 13.0 10.2 8.1 4.7 113.4 39.9
Lot11
upstream of
04 17.2 14.6 13.1 10.4 8.3 4.9 2.9 17.2 8.1 6.9 5.9 4.8 3.9 2.5 62.4 20.5
easement
downstream of
05 15.1 13.1 11.7 9.9 8.3 4.9 2.8 15.2 8.1 6.8 5.7 4.5 3.7 2.6 49.4 18.5
easement
06 Precinct L 49.4 41.1 36.0 28.3 22.7 13.7 8.9 49.5 27.2 23.1 19.3 15.4 12.4 8.0 207.4 60.1
upstream of
LEB3 us LEB Crossing 63.6 52.8 45.9 35.9 28.0 17.4 10.6 63.9 35.9 30.2 25.2 20.1 16.4 10.1 280.3 78.3
3
upstream of 56.0 48.5 42.7 32.5 25.1 15.6 9.1 56.1 33.8 28.2 23.2 18.2 14.3 8.2 186.8 62.3
AspPI us
Aspera PI
downstream of
AspPI ds 52.5 45.5 40.2 32.7 24.6 13.1 7.0 52.6 33.1 28.6 23.3 18.2 14.3 8.2 178.9 59.3
Aspera PI
upstream of
LEB2 us LEB Crossing 64.6 54.3 48.1 38.2 30.5 18.7 12.0 64.6 34.8 29.7 24.9 20.1 16.3 10.6 237.4 77.0
2
LEB -
adjacent
LEB2 ds 67.2 54.6 47.9 38.1 30.6 19.4 12.7 67.4 36.1 31.0 26.2 21.3 17.8 12.1 320.4 87.7
to flooded lots
EC1 Eenie Ck 42.9 35.2 30.7 25.2 20.5 13.1 8.5 43.0 22.6 19.4 16.5 13.4 11.0 7.2 168.6 52.3
EC2 Eenie Ck 106.2 86.6 75.3 59.2 47.4 30.9 20.0 106.9 59.8 50.9 42.6 34.5 28.2 19.1 479.8 137.4
Northbrook Corporation Pty Ltd 16 October 2012
O:15101.19.03IwpIR1v1 Flood StudylApp G. Peak Flows.docx Page 1
[OCR of page images]
cJ> Cardno
Design Events
1. 100 Year ARI Local 6. 2 Year ARI Local 11. 50 Year ARI Regional 16. PMF
2. 50 Year ARI Local 7. 1 Year ARI Local 12. 20 Year ARI Regional 17. 100 Year ARI Climate
3. 20 Year ARI Local 8. 100 Year ARI Storm Surge 13. 10 Year ARI Regional Change
4. 10 Year ARI Local 9. 100 Year ARI Storm Surge 14. 5 Year ARI Regional 18. 100 Year ARI Climate
5. 5 Year ARI Local 10. 100 Year ARI Regional 15. 2 Year ARI Regional Change
TableG1 Existing Case Peak Flows
Existing Case Peak Flows (m*/s)
Design Event
Comparison | | ocati 8 and 17
Point ocation 1 2 3 4 5 6 7 % 10 11 12 13 14 15 16 | and
18
al peream of 23.3 | 191 | 164 | 124] 94 | 52 | 29 | 233 | 134] 11.2] 93 | 73 | 58 | 35 | 98.0 | 289
Q2 Lot 11 25.8 | 21.2 | 179 | 136 | 102 | 56 | 31 | 258 | 150 | 126 | 105] 83 | 66 | 39 | 972 | 315
Q3 rownstream 28.7 | 236 | 201 | 152 | 116 | 66 | 38 | 287 | 189 | 16.0 | 130] 102 | 81 | 4.7 | 113.4] 39.9
upstream of
Q4 peomert 172 | 146 | 131 | 104] 83 | 49 | 29 | 172] 81 | 69 | 59 | 48 | 39 | 25 | 624 | 205
downstream of
Q5 easement 151 | 131 | 11.7] 99 | 83 | 49 | 28 | 152] 81 | 68 | 57 | 45 | 3.7 | 26 | 49.4 | 185
Q6 Precinct L 49.4 | 414.1 | 36.0 | 28.3 | 22.7 | 13.7 | 89 | 495 | 27.2 | 231 | 193 | 154 | 124 | 8.0 | 207.4 | 60.1
upstream of
LEB3 us LEB Crossing | 63.6 | 52.8 | 45.9 | 35.9 | 28.0 | 17.4 | 106 | 63.9 | 35.9 | 30.2 | 25.2 | 20.1 | 16.4 | 10.1 | 280.3] 78.3
3
AspPI us iowa 56.0 | 48.5 | 42.7 | 32.5 | 251 | 156 | 94 | 561 | 33.8 | 28.2 | 23.2 | 182 | 143 | 82 | 1868] 62.3
AspPI ds caer of | 525 | 455 | 402 | 327 | 246 | 131 | 7.0 | 526 | 33.1 | 286 | 233 | 182 | 143 | 82 | 1789] 593
upstream of
LEB2 us LEB Crossing | 64.6 | 54.3 | 48.1 | 38.2 | 30.5 | 18.7 | 12.0 | 64.6 | 34.8 | 29.7 | 249 | 20.1 | 163 | 106 | 237.4 | 77.0
2
LEB2 ds LEB - adjacent | 675 | 546 | 47.9 | 381 | 306 | 19.4 | 127 | 67.4 | 364 | 31.0 | 262 | 213 | 178 | 121 | 3204 | 87.7
to flooded lots
EC1 Eenie Ck 42.9 | 35.2 | 30.7 | 252 | 205 | 131 | 85 | 430 | 226 | 194 | 165 | 134 | 11.0 | 72 | 1686| 523
EC2 Eenie Ck 106.2 | 866 | 753 | 59.2 | 47.4 | 30.9 | 20.0 | 1069| 59.8 | 50.9 | 426 | 345 | 28.2 | 19.1 | 479.8 | 137.4
Northbrook Corporation Pty Ltd 16 October 2012
0.15101-19-03\wpIR1V1 Flood Study\App G - Peak Flows.docx Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.