Council archive · source document
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
<..f)Cardno
Design Events
1. 100 Year ARI Local 7. 1 Year ARI Local 13. 10 Year ARI Regional 18. 100 Year ARI Climate
2. 50 Year ARI Local 8. 100 Year ARI Storm Surge 14. 5 Year ARI Regional Change
3. 20 Year ARI Local 9. 100 Year ARI Storm Surge 15. 2 Year ARI Regional
4. 10 Year ARI Local 10. 100 Year ARI Regional 16. PMF
5. 5 Year ARI Local 11. 50 Year ARI Regional 17. 100 Year ARI Climate
6. 2 Year ARI Local 12. 20 Year ARI Regional Change
Table G 2 Developed Case Peak Flows
Developed Case Peak Flows (m3/s)
Design Event
Comparison 17
Location 8 and
Point 1 2 3 4 5 6 7 10 11 12 13 14 15 16 and
9
18
upstream of 19.1 9.5 5.2 11.3 7.3 5.8 3.6 89.7 28.6
Q1 23.2 16.3 12.4 2.9 23.2 13.3 9.2
Lot 11
Q2 Lot 11 23.1 18.8 15.4 11.1 8.0 4.0 2.3 24.0 15.1 12.6 10.3 8.1 6.4 3.4 81.6 30.5
downstream
Q3 24.8 20.3 16.4 12.2 9.0 4.9 2.7 27.3 18.9 15.9 12.8 9.9 7.6 4.1 97.4 38.1
Lot11
Q4
upstream of 15.7 12.2 9.7 6.9 5.8 4.1 2.9 15.8 6.7 5.9 5.1 4.2 3.7 2.5 67.0 20.0
easement
downstream of
Q5 13.7 10.5 8.4 6.6 5.3 4.0 2.9 13.9 7.2 6.2 5.4 4.2 3.5 2.5 55.7 18.3
easement
Q6 Precinct L 49.4 41.1 36.0 28.3 22.7 13.7 8.9 49.5 27.2 23.1 19.3 15.5 12.4 8.0 207.9 60.1
upstream of
LEB3 us LEB Crossing 63.7 52.8 45.9 35.6 28.1 17.4 10.6 63.9 35.9 30.3 25.2 20.1 16.2 10.1 281.1 78.3
3
upstream of
AspPI us 56.0 48.6 42.7 32.8 25.1 15.6 9.1 56.1 33.9 28.2 23.2 18.2 14.3 8.2 187.4 62.3
Aspera PI
downstream of
AspPlds 52.6 45.6 40.2 32.7 24.6 13.1 7.0 52.7 33.8 28.6 23.3 18.2 14.3 8.2 179.3 59.4
Aspera PI
upstream of
LEB2 us LEB Crossing 64.6 54.3 48.1 38.2 30.5 18.8 12.0 64.6 34.8 29.7 24.9 20.1 16.4 10.6 238.1 77.0
2
LEB -
adjacent
LEB2 ds 67.2 54.6 48.0 38.1 30.6 19.4 12.7 67.4 36.1 31.0 26.2 21.4 17.8 12.1 320.8 87.6
to flooded lots
EC1 Eenie Ck 42.9 35.3 30.8 25.2 20.6 13.1 8.4 43.0 22.7 19.4 16.5 13.4 11.0 7.2 169.0 52.3
Northbrook Corporation Pty Ltd 16 October 2012
O:15101.19.03IwpIR1v1 Flood StudylApp G. Peak Flows.docx Page 3
[OCR of page images]
cJ> Cardno
Design Events
1. 100 Year ARI Local 7. 1 Year ARI Local 13. 10 Year ARI Regional 18. 100 Year ARI Climate
2. 50 Year ARI Local 8. 100 Year ARI Storm Surge 14. 5 Year ARI Regional Change
3. 20 Year ARI Local 9. 100 Year ARI Storm Surge 15. 2 Year ARI Regional
4. 10 Year ARI Local 10. 100 Year ARI Regional 16. PMF
5. 5 Year ARI Local 11. 50 Year ARI Regional 17. 100 Year ARI Climate
6. 2 Year ARI Local 12. 20 Year ARI Regional Change
TableG 2 Developed Case Peak Flows
Developed Case Peak Flows (m/s)
Design Event
Comparison | | ocati 8 and 17
Point Ocation 1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 | and
18
re rn af 23.2 | 191 | 163 | 124] 95 | 52 | 29 | 232] 133 |] 113 |] 92 | 73 | 58 | 36 | 89.7 | 286
Q2 Lot 14 231 | 188 |] 154 | 11.1 | 80 | 40 | 23 | 240 | 151 | 126] 103 | 81 | 64 | 3.4 | 81.6 | 30.5
Q3 rownstream 24.8 | 203 | 164 | 122 | 90 | 49 | 27 | 273 | 189 | 159 | 128] 99 | 76 | 414 | 974 | 3814
upstream of
a4 easement 15.7 | 122 | 97 | 69 | 58 | 41 29 | 158] 67 | 59 | 51 | 42 | 3.7 | 25 | 67.0 | 20.0
Q5 downstream of | 437 | 195 | 34 | 66 | 53 | 40 | 29 | 139] 72 | 62 | 54 | 42 | 35 | 25 | 55.7 | 183
easement
a6 Precinct L 49.4 | 41.1 | 36.0 | 28.3 | 227 | 13.7 | 89 | 49.5 | 27.2 | 231 | 193 | 155 | 124 | 8.0 | 207.9 | 60.1
upstream of
LEB3 us LEB Crossing | 63.7 | 52.8 | 45.9 | 356 | 281 | 17.4 | 106 | 63.9 | 35.9 | 30.3 | 25.2 | 20.1 | 16.2 | 10.1 | 281.1] 78.3
3
AspPI us oar 56.0 | 48.6 | 42.7 | 328 | 251 | 156 | 91 | 561 | 33.9 | 282 | 232 | 182 | 143 | 82 | 1874] 623
AspPI ds femen El of) 526 | 456 | 40.2 | 327 | 246 | 13.1 | 7.0 | 527 | 338 | 286 | 233 | 182 | 143] 82 | 179.3] 59.4
upstream of
LEB2 us LEB Crossing | 64.6 | 54.3 | 48.1 | 38.2 | 30.5 | 188 | 12.0 | 646 | 348 | 29.7 | 24.9 | 20.1 | 164 | 10.6 | 238.1 | 77.0
2
LEB - adjacent
LEB2 ds toflooded lots | 07-2 | 546 | 48.0 | 38.1 | 306 | 19.4 | 12.7 | 67.4 | 364 | 31.0 | 26.2 | 214 | 17.8 | 12.1 | 3208 | 87.6
EC1 Eenie Ck 42.9 | 35.3 | 308 | 252 | 206 | 131 | 84 | 43.0 | 227 | 194 | 165 | 134 | 11.0 | 7.2 | 169.0] 523
Northbrook Corporation Pty Ltd 16 October 2012
0.15101-19-03\wpIR1V1 Flood Study\App G - Peak Flows.docx Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.