Skip to the record
Accept no substitutions.

Council archive · source document

Part 8 of 37 Appendix 6 - Flood Study MCU12/0208

of 115

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                                                                               <..f)Cardno
Design Events
      1.    100 Year ARI Local                                      7.   1 Year ARI Local                           13. 10 Year ARI Regional                    18. 100 Year ARI Climate
      2.    50 Year ARI Local                                       8.   100 Year ARI Storm Surge                   14. 5 Year ARI Regional                            Change
      3.    20 Year ARI Local                                       9.   100 Year ARI Storm Surge                   15. 2 Year ARI Regional
      4.    10 Year ARI Local                                       10. 100 Year ARI Regional                       16. PMF
      5.    5 Year ARI Local                                        11. 50 Year ARI Regional                        17. 100 Year ARI Climate
      6.    2 Year ARI Local                                        12. 20 Year ARI Regional                           Change



              Table G 3              Difference in Peak Flows

                                                                                                Difference in Peak Flow (Developed    -
                                                                                                                                          Existing) (m3/s)
                                                                                                                    Design Event
 Comparison                                                                                                                                                                                17
                         Location                                                                                   8 and
 Point                                                 1      2            3      4         5         6      7                 10      11        12      13     14        15      16      and
                                                                                                                       9
                                                                                                                                                                                           18

                         upstream of                -0.07                                           0.02             -0.07                                     -0.01     0.02    -8.31   -0.27
 Q1                                                         -0.03        -0.09   0.03    0.03               0.00              -0.03   0.04     -0.02    0.04
                         Lot 11
                                                                                                                                                                                   -




 Q2                      Lot 11                     -2.71   -2.39        -2.47   -2.45   -2.23      -1.53   -0.86    -1.80    0.07    -0.06    -0.25   -0.22   -0.20     -0.48           -1.00
                                                                                                                                                                                 15.59
                         downstream                                                                                                                                                -




 Q3                                                 -3.93   -3.38        -3.76   -3.03   -2.64      -1.76   -1.10    -1.43    -0.04   -0.09    -0.20   -0.36   -0.48     -0.60           -1.82
                         Lot11                                                                                                                                                   15.94

                         upstream of                -1.41   -2.41        -3.39   -3.53   -2.51      -0.85   -0.06    -1.41    -1.38   -1.05    -0.77   -0.55   -0.22     -0.05   4.66    -0.51
 Q4
                         easement
                         downstream of
 Q5                                                 -1.37   -2.56        -3.31   -3.31   -3.00      -0.91   0.05     -1.29    -0.85   -0.57    -0.26   -0.32   -0.16     -0.15   6.24    -0.19
                         easement

 Q6                      Precinct L                  0.03   0.01         0.02    0.02    0.01       0.00    0.00     0.02     0.01    0.01      0.01    0.01   0.00      0.01    0.52    0.01

                         upstream of
 LEB3 us                 LEB Crossing                0.04   0.04         0.02    -0.24   0.02       0.01    0.01     0.03     0.02    0.03      0.01    0.01   -0.17     0.00    0.84    0.03
                         3
                         upstream of
 AspPI us                                            0.03   0.05         0.03    0.35    0.00       -0.01   0.01     0.03     0.02    0.02      0.01    0.00   -0.01     0.00    0.59    0.03
                         Aspera PI
                         downstream of
 AspPI ds                                            0.04   0.02         0.02    0.02    0.01       -0.02   0.01     0.04     0.69    0.01      0.01    0.00   0.01      0.02    0.43    0.01
                         Aspera PI
                         upstream of
 LEB2 us                 LEB Crossing                0.03   0.02         0.02    0.01    0.01       0.01    0.00     0.03     0.02    0.01      0.01    0.02   0.01      0.00    0.66    0.03
                         2
                         LEB    -

                                    adjacent
 LEB2 ds                                             0.04   0.05         0.10    0.07    0.00       0.01    0.01     0.01     0.02    0.00      0.04    0.01   0.01      0.00    0.40    -0.07
                         to flooded lots




Northbrook Corporation Pty Ltd                                                                                                                                                   16 October 2012
O:15101.19.03IwpIR1v1 Flood StudylApp G. Peak Flows.docx                                                                                                                                 Page 5


[OCR of page images]
cJ> Cardno

 

Design Events

1. 100 Year ARI Local 7. 1 Year ARI Local 13. 10 Year ARI Regional 18. 100 Year ARI Climate
2. 50 Year ARI Local 8. 100 Year ARI Storm Surge 14. 5 Year ARI Regional Change

3. 20 Year ARI Local 9. 100 Year ARI Storm Surge 15. 2 Year ARI Regional

4. 10 Year ARI Local 10. 100 Year ARI Regional 16. PMF

5. 5 Year ARI Local 11. 50 Year ARI Regional 17. 100 Year ARI Climate

6. 2 Year ARI Local 12. 20 Year ARI Regional Change

Table G3 __ Difference in Peak Flows

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Difference in Peak Flow (Developed — Existing) (m*/s)
Design Event
Comparison | | ocati 8 and 17
Point Ocation 1 2 3 4 5 6 7 9 10 11 12 13 14 15 16 and
18
at rn at -0.07 | -0.03 | -0.09 | 0.03 | 0.03 | 0.02 | 0.00 | -0.07 | -0.03 | 0.04 | -0.02 | 0.04 | -0.01 | 0.02 | -8.31 | -0.27
Q2 Lot 11 -2.71 | -2.39 | -2.47 | -2.45 | -2.23 | -1.53 | -0.86 | -1.80 | 0.07 | -0.06 | -0.25 | -0.22 | -0.20 | -0.48 | ,.54 | -1.00
Q3 rownstream -3.93 | -3.38 | -3.76 | -3.03 | -2.64 | -1.76 | -1.10 | -1.43 | -0.04 | -0.09 | -0.20 | -0.36 | -0.48 | -0.60 | ,. 9, | -1.82
upstream of
a4 saat -1.41 | -2.41 | -3.39 | -3.53 | -2.51 | -0.85 | -0.06 | -1.41 | -1.38 | -1.05 | -0.77 | -0.55 | -0.22 | -0.05 | 4.66 | -0.51
Q5 downstream of | 4 37 | 256 | -3.31 | -3.31 | -3.00 | -0.91 | 0.05 | -1.29 | -0.85 | -0.57 | -0.26 | -0.32 | -0.16 | -0.15 | 6.24 | -0.19
easement
Q6 Precinct L 0.03 | 0.01 | 0.02 | 0.02 | 0.01 | 0.00 | 0.00 | 0.02 | 0.01 | 0.01 | 0.01 | 0.01 | 0.00 | 0.01 | 052 | 0.01
upstream of
LEB3 us LEB Crossing | 0.04 | 0.04 | 0.02 | -0.24 | 0.02 | 0.01 | 0.01 | 0.03 | 0.02 | 0.03 | 0.01 | 0.01 | -0.17 | 0.00 | 0.84 | 0.03
3
AspPI us pope PI 0.03 | 0.05 | 0.03 | 0.35 | 0.00 | -0.01 | 0.01 | 0.03 | 0.02 | 0.02 | 0.01 | 0.00 | -0.01 | 0.00 | 0.59 | 0.03
AspPI ds eee f |) 9.04 | 0.02 | 0.02 | 0.02 | 0.01 | -0.02 | 0.01 | 0.04 | 0.69 | 0.01 | 0.01 | 0.00 | 0.01 | 0.02 | 0.43 | 0.01
upstream of
LEB2 us LEB Crossing | 0.03 | 0.02 | 0.02 | 0.01 | 0.01 | 0.01 | 0.00 | 0.03 | 0.02 | 0.01 | 0.01 | 0.02 | 0.01 | 0.00 | 0.66 | 0.03
2
LEB - adjacent
LEB2 ds toflooded lots | 0-04 | 0-05 | 0.10 | 0.07 | 0.00 | 0.01 | 0.01 | 0.01 | 0.02 | 0.00 | 0.04 | 0.01 | 0.01 | 0.00 | 0.40 | -0.07
Northbrook Corporation Pty Ltd 16 October 2012

0.15101-19-03\wpIR1V1 Flood Study\App G - Peak Flows.docx Page 5

Used in these records

About this file

File size
93.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 8 of 37 Appendix 6 - Flood Study MCU12_0208.pdf · 93.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.