Council archive · source document
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
<..f)Cardno
Design Events
1. 100 Year ARI Local 6. 2 Year ARI Local 11. 50 Year ARI Regional 16. PMF
2. 50 Year ARI Local 7. 1 Year ARI Local 12. 20 Year ARI Regional 17. 100 Year ARI Climate
3. 20 Year ARI Local 8. 100 Year ARI Storm Surge 13. 10 Year ARI Regional Change
4. 10 Year ARI Local 9. 100 Year ARI Storm Surge 14. 5 Year ARI Regional 18. 100 Year ARI Climate
5. 5 Year ARI Local 10. 100 Year ARI Regional 15. 2 Year ARI Regional Change
Table H 1 Existing Case Peak Velocities
Existing Case Peak Velocities (m/s)
Design Event
Comparison 8 17
Location
Point 1 2 3 4 5 6 7 and 10 11 12 13 14 15 16 and
9 18
TidsRd Tidswell Road 0.64 0.63 0.59 0.63 0.67 0.70 0.68 0.64 0.67 0.69 0.63 0.65 0.68 0.70 0.84 0.74
downstream of
ds_TidsRd 0.27 0.60 0.23 0.20 0.18 0.35 0.25 0.27 0.15 0.14 0.13 0.12 0.11 0.09 0.46 0.24
Tidswell Road
HO 0.33 0.30 0.28 0.24 0.21 0.15 0.10 0.33 0.24 0.22 0.19 0.17 0.14 0.11 0.65 0.37
H1 0.37 0.35 0.32 0.28 0.22 0.12 0.02 0.37 0.28 0.25 0.21 0.17 0.13 0.04 0.40 0.40
H2
upstream of 0.71 0.73 0.73 0.75 0.71 0.75 0.74 0.73 0.55 0.73 0.71 0.75 0.71 0.71 0.53 0.54
Lot 11
H3 Lot 11 south 0.22 0.21 0.19 0.20 0.35 0.38 0.26 0.22 0.12 0.12 0.12 0.10 0.09 0.08 0.21 0.13
H4 Lot 11 centre 0.18 0.17 0.15 0.14 0.12 0.09 0.06 0.18 0.10 0.12 0.12 0.11 0.10 0.07 0.16 0.10
Southern
NBK01 _
road Keyser Ck 0.29 0.28 0.26 0.25 0.23 0.20 0.33 0.29 0.12 0.16 0.19 0.29 0.17 0.15 0.14 0.10
crossing
H5 Lot 11 north 0.29 0.18 0.21 0.26 0.21 0.20 0.13 0.29 0.09 0.11 0.12 0.11 0.10 0.08 0.18 0.10
Northern
NBK02_road Keyser Ck 0.56 0.42 0.59 0.45 0.56 0.48 0.48 0.56 0.13 0.17 0.20 0.27 0.42 0.44 0.18 0.12
crossing
H6 Keyser Ck 0.33 0.31 0.37 0.29 0.29 0.28 0.31 0.33 0.10 0.12 0.14 0.16 0.15 0.14 0.23 0.13
H7 Keyser Ck 0.16 0.14 0.13 0.11 0.09 0.06 0.04 0.16 0.07 0.07 0.07 0.06 0.06 0.04 0.24 0.10
upstream of
H8 new road- 0.47 0.44 0.41 0.37 0.35 0.29 0.25 0.47 0.31 0.29 0.27 0.25 0.24 0.22 0.78 0.48
Nature Refuge
tributary 0.60 0.58 0.55 0.53 0.52 0.49 0.42 0.60 0.47 0.45 0.43 0.42 0.39 0.31 0.84 0.60
NBK03_road
crossing
Northbrook Corporation Pty Ltd 16 October 2012
O:15101.19.03IwpIR1v1 Flood StudylApp H.Peak Velocities.docx Page 1
[OCR of page images]
cJ> Cardno
Design Events
1. 100 Year ARI Local 6. 2 Year ARI Local 11. 50 Year ARI Regional 16. PMF
2. 50 Year ARI Local 7. 1 Year ARI Local 12. 20 Year ARI Regional 17. 100 Year ARI Climate
3. 20 Year ARI Local 8. 100 Year ARI Storm Surge 13. 10 Year ARI Regional Change
4. 10 Year ARI Local 9. 100 Year ARI Storm Surge 14. 5 Year ARI Regional 18. 100 Year ARI Climate
5. 5 Year ARI Local 10. 100 Year ARI Regional 15. 2 Year ARI Regional Change
TableH1 Existing Case Peak Velocities
Existing Case Peak Velocities (m/s)
Design Event
Comparison . 8 17
Point Location 1 2 3 4 5 6 7 | and | 10 | 11 12 | 13 | 14 | 15 | 16 | and
9 18
TidsRd Tidswell Road 0.64 | 0.63 | 0.59 | 0.63 | 0.67 | 0.70 | 0.68 | 0.64 | 0.67 | 0.69 | 0.63 | 0.65 | 0.68 | 0.70 | 0.84 | 0.74
. downstream of
ds_TidsRd Tidswell Road 0.27 | 0.60 | 0.23 | 0.20 | 0.18 | 0.35 | 0.25 | 0.27 | 0.15 | 0.14 | 0.13 | 0.12 | 0.11 | 0.09 | 0.46 | 0.24
HO 0.33 | 0.30 | 0.28 | 0.24 | 0.21 | 0.15 | 0.10 | 0.33 | 0.24 | 0.22 | 0.19 | 0.17 | 0.14 | 0.11 | 0.65 | 0.37
H1 0.37 | 0.35 | 0.32 | 0.28 | 0.22 | 0.12 | 0.02 | 0.37 | 0.28 | 0.25 | 0.21 | 0.17 | 0.13 | 0.04 | 0.40 | 0.40
H2 eae af 0.71 | 0.73 | 0.73 | 0.75 | 0.71 | 0.75 | 0.74 | 0.73 | 0.55 | 0.73 | 0.71 | 075] 071 | 071 | 053 | 0.54
H3 Lot 11 south 0.22 | 0.21 | 0.19 | 0.20 | 0.35 | 0.38 | 0.26 | 0.22 | 0.12 | 0.12 | 0.12 | 0.10 | 0.09 | 0.08 | 0.21 | 0.13
H4 Lot 11 centre 0.18 | 0.17 | 0.15 | 0.14 | 0.12 | 0.09 | 0.06 | 0.18 | 0.10 | 0.12 | 0.12 | 0.11 | 0.10 | 0.07 | 0.16 | 0.10
Southern
NBKO1_road | Keyser Ck 0.29 | 0.28 | 0.26 | 0.25 | 0.23 | 0.20 | 0.33 | 0.29 | 0.12 | 0.16 | 0.19 | 0.29 | 0.17 | 0.15 | 0.14 | 0.10
crossing
H5 Lot 11 north 0.29 | 0.18 | 0.21 | 0.26 | 0.21 | 0.20 | 0.13 | 0.29 | 0.09 | 0.11 | 0.12 | 0.11 | 0.10 | 0.08 | 0.18 | 0.10
Northern
NBKO2_road | Keyser Ck 0.56 | 0.42 | 0.59 | 0.45 | 0.56 | 0.48 | 0.48 | 0.56 | 0.13 | 0.17 | 0.20 | 0.27 | 0.42 | 0.44 | 0.18 | 0.12
crossing
H6 Keyser Ck 0.33 | 0.31 | 0.37 | 0.29 | 0.29 | 0.28 | 0.31 | 0.33 | 0.10 | 0.12 | 0.14 | 0.16 | 0.15 | 0.14 | 0.23 | 0.13
H7 Keyser Ck 0.16 | 0.14 | 0.13 | 0.11 | 0.09 | 0.06 | 0.04 | 0.16 | 0.07 | 0.07 | 0.07 | 0.06 | 0.06 | 0.04 | 0.24 | 0.10
upstream of
H8 new road — 0.47 | 0.44 | 0.41 | 0.37 | 0.35 | 0.29 | 0.25 | 0.47 | 0.31 | 0.29 | 0.27 | 0.25 | 0.24 | 0.22 | 0.78 | 0.48
Nature Refuge
NBKO3_road amnesia 0.60 | 0.58 | 0.55 | 0.53 | 0.52 | 0.49 | 0.42 | 0.60 | 0.47 | 0.45 | 0.43 | 0.42 | 0.39 | 0.31 | 0.84 | 0.60
Northbrook Corporation Pty Ltd 16 October 2012
0.15101-19-03\wpIR1V1 Flood Study\App H - Peak Velocities. docx Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.