~,.,CardnO.
For the developed case, for catchments E3, F7 and F8, off-line detention basins will be utilised to reduce
peak flows back to the existing case levels. Therefore for these sub-catchments the existing case inflows
were used in the TUFLOW modelling. The size of the detention basins required will be determined during
detailed design. The proposed culvert crossings will provide "on-line" detention of peak flows for other sub-
catchments. For the catchments draining directly towards Lake Weyba, detention basins are not proposed.
Sio-retention basins and swales will provide attenuation of minor flows. It should be noted that the minor
flow attenuation provided by the proposed rainwater tanks and bio-retention basins has not been included in
the analysis. Appropriate erosion and scour protection will be required on all outlets.
4.3 PMF Inflows
The WSNM model was used to calculate the Probable Maximum Flood (PMF)flows utilising the Generalised
Short Duration Method (GSDM)as the catchment area is less than 1000 km2. A moisture adjustment factor
(MAF)of 0.85 was adopted and the catchment was assumed to be 100 percent rough. The resultant rainfall
depths for the PMP event are shown in Table 4-7.
Table 4-7 PMF Rainfall
l!l!ooat.!m(mnD) 60 90 120 180 270 360
~i11:mI!nmil(ljjmj) 350 448 517 626 747 832
The peak flows from the sub-catchments typically resulted from the 90 minute event and so this was used in
the analysis. It should be noted that in the downstream section of the model, the regional Noosa River PMF
levels event will dominate. The current PMF level in Lake Weyba is 4.23 mAHD.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.