Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Part 8 of 37 Appendix 6 - Flood Study MCU12/0208

of 115

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Noosa on Weyba
Flood Study
                                                                                  ~,.,CardnO.

It should be noted that the water surface profile required to match the Council debris levels with the JFP
debris levels would have been unrealistic. It was therefore considered that a calibration to the higher debris
levels was the most reasonable approach.

The resultant flood levels for the February 2012 event are shown in Figure 10. For the upstream areas of
Eenie Creek, the resultant modelled water levels were between the 50 and 100 year ARI levels.          Within

Keyser Creek the resultant water levels were roughly equivalent to the 20 year ARI event.




Northbrook Corporation Pty Ltd                     Version 1                                    23 October 2012
Flood Study v1.doc                          Commercial in Confidence                                   Page 17

Used in these records

About this file

File size
93.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 8 of 37 Appendix 6 - Flood Study MCU12_0208.pdf · 93.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.