Council archive · source document
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Noosa on Weyba
Flood Study
~,.,CardnO.
9 CONCLUSION
The proposed development of Noosa on Weyba has been shown through TUFLOW modelling to:
. have no adverse impacts on flood levels and flows for surrounding properties for local and regional
flood events;
. reduce the 100 year ARI event the peak flood level around Lake Entrance Boulevard due to flow
attenuation being proposed within the site;
. provide 100 year ARI trafficability for all proposed and upgraded roads;
. provide PMF evacuation routes for all areas of the site; and
. improve flood access for neighbouring properties.
The flood levels used to set the development levels for the site do include the potential impact of climate
change.
The proposed filling within the site will reduce available flood storage, although compared to the available
storage in Lake Weyba and the surrounding floodplain, the reduction is minimal. Flood modelling has shown
that the impact of the reduced flood storage is contained within the site.
Dense revegetation of the western drainage channel is considered to be achievable with acceptable flood
impacts for the site and surrounding properties should this be desirable.
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.