Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Noosa on Weyba
Flood Study
~,.,CardnO.
Table of Contents
1 Introduction 1
2 Site Description 2
3 Hydraulic Modelling 3
3.1 Available Flood Modelling 3
3.2 TUFLOW Model 3
3.2.1 Summary 3
3.2.2 Topography and Grid Size 3
3.2.3 Roughness Values 4
3.2.4 Model Inflows 4
3.2.5 Boundary Conditions 5
3.2.6 Model Runs 5
3.2.7 Time Step 7
3.2.8 Existing Structures 7
3.3 Model Calibration 9
4 Hydrologic Model 11
4.1 Rational Method 11
4.1.1 Sub-catchments 11
4.1.2 Times of Concentration 11
4.1.3 Rainfall Intensity 11
4.1.4 Fraction Impervious 11
4.1.5 Runoff Coefficient 11
4.1.6 Resultant Peak Flows 12
4.2 WBNM Model 12
4.2.1 Summary 12
4.2.2 Developed Case 13
4.3 PMF Inflows 15
5 TUFLOW Calibration 16
5.1 February 2012 Event 16
6 Existing Case Results 18
6.1 Peak Water Levels 18
6.2 Peak Flows 18
6.3 Peak Velocities 18
7 Proposed Development 19
7.1 Proposed Development 19
7.2 Proposed Structures 19
7.3 Proposed Stormwater Treatment 21
8 Developed Case Results 22
8.1 Peak Water Levels 22
8.2 Peak Flows 23
8.3 Peak Velocities 23
8.4 Flood Storage 24
8.5 Sensitivity Analysis 25
Northbrook Corporation Pty Ltd Version 1 23 October 2012
Flood Study v1.doc Commercial in Confidence Page iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.