Council archive · source document
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208
Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
<..f)Cardno
Design Events
1. 100 Year ARI Local 7. 1 Year ARI Local 13. 10 Year ARI Regional 18. 100 Year ARI Climate
2. 50 Year ARI Local 8. 100 Year ARI Storm Surge 14. 5 Year ARI Regional Change
3. 20 Year ARI Local 9. 100 Year ARI Storm Surge 15. 2 Year ARI Regional
4. 10 Year ARI Local 10. 100 Year ARI Regional 16. PMF
5. 5 Year ARI Local 11. 50 Year ARI Regional 17. 100 Year ARI Climate
6. 2 Year ARI Local 12. 20 Year ARI Regional Change
Table F 3 Difference in Peak Water Levels
Difference in Peak Water Level (Developed _
Existing) (m)
Design Event
Comparison 17
Location 8 and
Point 1 2 3 4 5 6 7 10 11 12 13 14 15 16 and
9
18
TidsRd Tidswell Road 0.203 0.238 0.222 0.293 0.319 n/a n/a 0.203 0.278 n/a n/a n/a n/a n/a -0.002 0.186
downstream of
ds_TidsRd 0.000 0.000 0.001 0.002 0.002 0.001 0.001 0.001 0.001 0.001 0.001 0.000 0.000 0.000 -0.007 0.001
Tidswell Road
HO 0.000 0.000 0.000 0.001 0.001 0.001 0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.033 0.000
H1 -0.001 0.001 0.000 0.000 0.000 0.000 0.000 -0.001 0.000 0.000 0.000 0.000 0.000 0.000 0.353 0.011
H2
upstream of -0.001 0.000 0.000 0.000 0.001 0.001 0.002 0.004 0.001 0.000 0.000 0.000 0.000 0.000 0.408 0.066
Lot 11
H3 Lot 11 south 0.107 0.071 0.048 0.007 -0.024 -0.029 -0.024 0.123 0.058 0.062 0.050 0.032 0.017 -0.009 0.415 0.075
H4 Lot 11 centre 0.106 0.075 0.043 0.002 -0.030 -0.072 -0.086 0.113 0.050 0.054 0.043 0.024 0.004 -0.038 0.411 0.069
Southern
NBK01 road Keyser Ck n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0.402 n/a
_
crossing
H5 Lot 11 north 0.051 0.037 0.014 -0.012 -0.036 -0.069 -0.078 0.061 0.028 0.032 0.026 0.014 -0.001 -0.033 0.372 0.037
Northern
NBK02_road Keyser Ck n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0.361 n/a
crossing
H6 Keyser Ck -0.015 -0.017 -0.022 -0.028 -0.036 -0.047 -0.050 -0.002 0.000 0.000 -0.002 -0.004 -0.007 -0.015 -0.011 -0.001
H7 Keyser Ck -0.016 -0.018 -0.022 -0.028 -0.038 -0.061 -0.083 -0.002 0.000 0.000 -0.002 -0.004 -0.006 -0.006 -0.008 -0.001
upstream of
H8 new road _
0.390 0.357 0.316 0.273 0.235 0.156 0.084 0.390 0.193 0.160 0.128 0.090 0.068 0.029 0.605 0.430
Nature Refuge
Northbrook Corporation Pty Ltd 16 October 2012
O:15101.19.03IwpIR1v1 Flood StudylApp F.Peak Flood Levels.docx Page 7
[OCR of page images]
cJ> Cardno
Design Events
1. 100 Year ARI Local 7. 1 Year ARI Local 13. 10 Year ARI Regional 18. 100 Year ARI Climate
2. 50 Year ARI Local 8. 100 Year ARI Storm Surge 14. 5 Year ARI Regional Change
3. 20 Year ARI Local 9. 100 Year ARI Storm Surge 15. 2 Year ARI Regional
4. 10 Year ARI Local 10. 100 Year ARI Regional 16. PMF
5. 5 Year ARI Local 11. 50 Year ARI Regional 17. 100 Year ARI Climate
6. 2 Year ARI Local 12. 20 Year ARI Regional Change
Table F3 Difference in Peak Water Levels
Difference in Peak Water Level (Developed — Existing) (m)
Design Event
Comparison | | ocati 8 and 17
Point ocation 1 2 3 4 5 6 7 3 10 14 12 13 14 15 16 and
18
TidsRd Tidswell Road 0.203 | 0.238 | 0.222 | 0.293 | 0.319 n/a n/a 0.203 | 0.278 n/a n/a na n/a n/a -0.002 | 0.186
ds_TidsRa | Gownstream of | 9 gg9 | 9.000 | 0.001 | 0.002 | 0.002 | 0.001 | 0.001 | 0.001 | 0.001 | 0.001 | 0.001 | 0.000 | 0.000 | 0.000 | -0.007 | 0.001
Tidswell Road
HO 0.000 | 0.000 | 0.000 | 0.001 | 0.001 | 0.001 | 0.001 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.033 | 0.000
H1 -0.001 | 0.001 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | -0.001 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.353 | 0.011
H2 em of | -0.001 | 0.000 | 0.000 | 0.000 | 0.001 | 0.001 | 0.002 | 0.004 | 0.001 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.408 | 0.066
H3 Lot 11 south 0.107 | 0.071 | 0.048 | 0.007 | -0.024 | -0.029 | -0.024 | 0.123 | 0.058 | 0.062 | 0.050 | 0.032 | 0.017 | -0.009 | 0.415 | 0.075
H4 Lot 11 centre 0.106 | 0.075 | 0.043 | 0.002 | -0.030 | -0.072 | -0.086 | 0.113 | 0.050 | 0.054 | 0.043 | 0.024 | 0.004 | -0.038 | 0.411 | 0.069
Southern
NBKO1_road | Keyser Ck n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0.402 n/a
crossing
H5 Lot 11 north 0.051 | 0.037 | 0.014 | -0.012 | -0.036 | -0.069 | -0.078 | 0.061 | 0.028 | 0.032 | 0.026 | 0.014 | -0.001 | -0.033 | 0.372 | 0.037
Northern
NBKO2_road | Keyser Ck n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 0.361 n/a
crossing
H6 Keyser Ck -0.015 | -0.017 | -0.022 | -0.028 | -0.036 | -0.047 | -0.050 | -0.002 | 0.000 | 0.000 | -0.002 | -0.004 | -0.007 | -0.015 | -0.011 | -0.001
H7 Keyser Ck -0.016 | -0.018 | -0.022 | -0.028 | -0.038 | -0.061 | -0.083 | -0.002 | 0.000 | 0.000 | -0.002 | -0.004 | -0.006 | -0.006 | -0.008 | -0.001
upstream of
H8 new road — 0.390 | 0.357 | 0.316 | 0.273 | 0.235 | 0.156 | 0.084 | 0.390 | 0.193 | 0.160 | 0.128 | 0.090 | 0.068 | 0.029 | 0.605 | 0.430
Nature Refuge
Northbrook Corporation Pty Ltd
0:15101-19-O03\wp\R1v1 Flood Study\App F - Peak Flood Levels.docx
16 October 2012
Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 8 of 37 Appendix 6 - Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 93.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.