Skip to the record
The gold standard in government transparency.

Council archive · source document

Part 8 of 37 Appendix 6 - Flood Study MCU12/0208

of 115

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (93.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                                                                                                                                <..f)Cardno
                                                                                               Difference in Peak Water Level (Developed       -
                                                                                                                                                   Existing) (m)
                                                                                                                      Design Event
 Comparison                                                                                                                                                                                          17
                         Location                                                                                     8 and
 Point                                                  1          2        3        4        5        6        7               10       11           12      13       14       15       16         and
                                                                                                                        9
                                                                                                                                                                                                     18

                         upstream of
 LEB1 us                 LEB Crossing              -0.002        -0.003   -0.005   -0.004   -0.002   -0.001   0.001   -0.003   -0.006   -0.005      -0.003   -0.002   -0.002   0.000   0.006       -0.002
                         1 (Eenie Ck)
                         LEB Crossing
 LEB1                                              -0.002        -0.003   -0.006    n/a      n/a      n/a      n/a    -0.002    n/a      n/a          n/a     n/a      n/a      n/a    0.007       -0.002
                         1

 EC1                     Eenie Ck                  -0.006        -0.008   -0.009   -0.008   -0.005   -0.001   0.001   -0.006   -0.006   -0.005      -0.004   -0.002   -0.002   0.001   0.007       -0.003

 EC2                     Eenie Ck                  -0.006        -0.007   -0.010   -0.009   -0.004   0.002    0.010   -0.006   -0.006   -0.005      -0.004   -0.001   0.001    0.002   0.008       -0.003

 EC3                     Eenie Ck                  -0.005        -0.006   -0.007   -0.004   -0.001   0.005    0.003   -0.005   -0.005   -0.004      -0.003   0.000    0.002    0.002   0.007       -0.002

 EC4                     Eenie Ck                  -0.005        -0.006   -0.006   -0.003   -0.001   0.004    0.004   -0.004   -0.003   -0.003      -0.003   0.000    0.002    0.002   0.001       -0.002

 EC5                     Eenie Ck                  -0.009        -0.009   -0.009   -0.003   -0.001   0.002    0.002   0.000    0.000    0.000        0.000   0.000    0.000    0.000   -0.001      -0.001


Shaded areas are located within the site




Northbrook Corporation Pty Ltd                                                                                                                                                   16 October 2012
O:15101.19.03IwpIR1v1 Flood StudylApp F.Peak Flood Levels.docx                                                                                                                           Page 9


[OCR of page images]
cJ> Cardno

 

 

Difference in Peak Water Level (Developed — Existing) (m)

 

Design Event

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

om Location 1 2 3 4 5 6 7 Sand 10 4 12 13 14 | 15 16 and
18
upstream of
LEB1 us LEB Crossing | -0.002 | -0.003 | -0.005 | -0.004 | -0.002 | -0.001 | 0.001 | -0.003 | -0.006 | -0.005 | -0.003 | -0.002 | -0.002 | 0.000 | 0.006 | -0.002
1 (Eenie Ck)
LEB1 Gre Cressind_ | 0.002 | -0.003 |-0.008} wa | ma | ma | ma |-0.002| wa | ma | ma | ova | wa | ma | 0.007 | -0.002
ECt Eenie Ck -0.006 | -0.008 | -0.009 | -0.008 | -0.005 | -0.001 | 0.001 | -0.006 | -0.006 | -0.005 | -0.004 | -0.002 | -0.002 | 0.001 | 0.007 | -0.003
EC2 Eenie Ck -0.006 | -0.007 | -0.010 | -0.009 | -0.004 | 0.002 | 0.010 | -0.006 | -0.006 | -0.005 | -0.004 | -0.001 | 0.001 | 0.002 | 0.008 | -0.003
EC3 Eenie Ck -0.005 | -0.006 | -0.007 | -0.004 | -0.001 | 0.005 | 0.003 | -0.005 | -0.005 | -0.004 | -0.003 | 0.000 | 0.002 | 0.002 | 0.007 | -0.002
EC4 Eenie Ck -0.005 | -0.006 | -0.006 | -0.003 | -0.001 | 0.004 | 0.004 | -0.004 | -0.003 | -0.003 | -0.003 | 0.000 | 0.002 | 0.002 | 0.001 | -0.002
ECS Eenie Ck -0.009 | -0.009 | -0.009 | -0.003 | -0.001 | 0.002 | 0.002 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | -0.001 | -0.001

 

Shaded areas are located within the site

 

Northbrook Corporation Pty Ltd

0:15101-19-O03\wp\R1v1 Flood Study\App F - Peak Flood Levels.docx

16 October 2012

Page 9

 

Used in these records

About this file

File size
93.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 8 of 37 Appendix 6 - Flood Study MCU12_0208.pdf · 93.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.