Council archive · source document
RFI - Attachment 1 - Amended Architectural Plan · MCU22/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (11.7 MB): may take a few minutes to open.
Original PDF page 1, section 1. The text section number identifies this passage in the reader.
Noosa Early Learning Centre
DRAWING LIST - DA
Drawing No. Sheet Name Revision
00.01 Context & Locality Plans 09
01.01 Site Context 12
01.02 Site Plan - Open Space 13
01.03 SIte Plan - 3D 09
03.01 Floor Plan - Ground 13
04.01 Roof 09
09.01 Elevations 11
09.02 Elevations - Fencing 08
10.01 Sections 10
Revision Project Architect Stage Project No.
Context & Locality Plans
05 Updated Drawings 21/03/2023 Noosa Early Learning Centre SC Development Approval 1187-03 Revision
06 Updated Drawings 24/03/2023 Lot 4 Noosa
07
08
09
Updated Drawings
Updated Drawings
Updated Drawings
27/03/2023
28/03/2023
4/04/2023
Client
Stockwell Development Group Pty Ltd
Drawn
AM
Status
Not For Construction (#Notes)
Scale
at A3
A-DA-00.01 09
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. \\EA-FS19\ServerFolders\Public\Data 1\1187-05 Sanctuary Noosa Childcare Centre\5.2 Development Application\5.2.1 ArchiCAD\1187-05 Master DA 24.pln
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of sections 2 to 7 (of 15)
Section 2
SP322201
Emt AL
45"
16'
697299°
36
Em
tC
B
SITE INFORMATION
22
01 Local Authority: Noosa
32
SP RL5.5 RL4.900
Outdoor Play Realigned Site Area: 2597m2
FNC-1 Age: 0-24 mnths
Boundary TANK Area: 87.40 Site Cover: 723.1m2
RL5.0 27.84%
AC AC Tank Occupancy: 12
RL4.95 RL5.5
45"
16'
068299°
43
Bikes x6 Dry GFA: 621.3m2
RL4.5 End of trip Store 23.92%
Ldy/cleaner
+4.398 B
facilities
MSB Bin
Lockers
Kitchen
1
VISITOR/TURNING Carparking Provided: 31
500 500
Bottle - 8 Staff
4,090
SERVICE BAY B
Prep Amenities
3,815
- 23 Visitor, Including 1 PWD + turning bay
1
4.4
5,400 6,200 6,500 - 1 SRV
0
4.1 Lockers
Activity Room 1 Bike Parking Provided: 10
25
2
Age: 0-24 mnths
2,400
VISITOR STAFF Staff Room
STAFF
Area: 41.60 End of Trip Facilities:
Occupancy: 12 - PWD bathroom with shower
24
Carpark 1,577 190
Shade Trees
26
- Shower, toilet, handbasin and 15 lockers
3
Garden Path and Pedestrian Pathway
RL4.25
2,600
VISITOR VISITOR STAFF for staff end of trip facilities.
Sleep Room
Store &
5,400 5,400 Comms Bed Age: 0-12 mnths Ext Store
23
Seat
Area: 18.30
27
4
2,600
VISITOR
VISITOR STAFF
1
4.0
22
Activity Room 2 RL5.25
9
28
Age: 2-3 yrs
4.4
5
5
4.3
Area: 67.20
2,600
Vegetated VISITOR
Covenant VISITOR STAFF Occupancy: 20
RL4.95
21
767 500 GFA
500 3,000 500
29
621.3 m2
6
2,600
VISITOR
+4.224
VISITOR STAFF
5,400 5,400
Bound
20
Boundary
Pram Bed Prep Store Amenities
30
7
ary
VISITOR Store
2,600
VISITOR STAFF
20"
42'
58836°
35
Line of Easement
19
31
FHR +
8
Activity Room 3
VISITOR EDB +
2,600
NBN Age: 2-3 yrs
8
VISITOR
3.8
STAFF Services Area: 67.20
18
Occupancy: 20
9
VISITOR
2,600
3
4.3
SP322201
VISITOR
Emt AO
Office RL5
17
42"
21'
75827°
61
10
VISITOR Bed
2,600
Activity Room 4
VISITOR Meeting
1
+4.175 Age: 3-5 yrs
3.9
16
Area: 72.30
4.00
Occupancy: 22
11
VISITOR
2,600
VISITOR Reception
15
1
4,100
4.2
12
VISITOR RLBikes
4.950 x4 RL 4.965 RL 5
2,600
VISITOR USAB
FNC
Prep Store Amenities
-1
14
RL 4.650 RL 4.805 RL 4.940
RL 4.300
SW Connection to Bio
Existing Boundary
2,400
RL 4.320
4.180
Garden Path and Pedestrian Pathway
B 1:405,400
Max
1:40= 135mm
ARBOUR Timber Bridge
RL 4.290
4.00 Activity Room 5
1:20 max to
LANDSCAPED DRIVEWAY Accessible Age: 3-5 yrs 2,100 Proposed Boundary Realignment
2,400
connect to
C
footpath tC
Em 220
32
1
BIO-RETENTION 1:40 Max Area: 72.20
SP
2 Occupancy: 22
13
4.12
RL 4.190 16.8 m 4.25 RL4.8
ARBOUR
4
Seat Bio Basin
4.1
2
MAIN
4
4.2
4.3
PEDESTRIAN
47"
53'
588154°
9
4.1.23
ENTRY
0
E Bed
4
4.25
3
4.1
4.34
20
LP
3 4.
4.1 26
le
47"
53'
146154°
4
Po
4.
ht
4
4.3
Lig
6
ack
4.1
46"
35'
950154°
2
Setb
ding 9
Buil 10,53
25"
1'
512153°
2
RL 4.44
Outdoor Play
Age: 3-5 yrs
5"
37'
980150°
4
Area: 596.70
FNC
-2 Occupancy: 84
RL 4.4
Bou
nda
12"
25'
980147°
4
ry
0
4,00
23"
48'
465145°
9
1"
16'
047139°
18
RL4.52
34"
56'
936130°
4
23"
22'
936127°
4
Section 3
Revision Project Architect Stage Project No.
Site Context
08 Updated Drawings 21/03/2023 Noosa Early Learning Centre SC Development Approval 1187-03 Revision
09 Updated Drawings 24/03/2023 Lot 4 Noosa
10
11
12
Updated Drawings
Updated Drawings
Updated Drawings
27/03/2023
28/03/2023
4/04/2023
Client
Stockwell Development Group Pty Ltd
Drawn
AM
Status
Not For Construction (#Notes)
Scale
1:250 at A3
A-DA-01.01 12
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. \\EA-FS19\ServerFolders\Public\Data 1\1187-05 Sanctuary Noosa Childcare Centre\5.2 Development Application\5.2.1 ArchiCAD\1187-05 Master DA 24.pln
Section 4
Open Space Summary
Site Area Realigned = 2,597m2
Boundary
Tank Open Space, including:
45"
16'
068299°
43
19.1 m2 Bikes x6 Landscaping = 284.2m2
+4.398 B =10.94%
1
VISITOR/TURNING
Garden Path + Pedestrian Pathway = 134.1m2
4,090
SERVICE BAY B
3,815
5,400 6,200 6,500 Subtotal = 418.3m2
3 m2 = 16.1%
25
2
2,400
VISITOR
122.7 m2 24.8 m2 STAFF STAFF
Outdoor Play = 684.17m2
24
Carpark 1,577 190
Shade Trees
26
3
Garden Path and Pedestrian Pathway
2,600
VISITOR VISITOR STAFF
Landscaped Bio-Retention = 16.8m2
5,400 5,400
23
Total Open Space = 1119.27m2
27
4
= 43.09%
2,600
VISITOR
VISITOR STAFF
7 m2
22
28
5
2,600
Vegetated VISITOR
Covenant VISITOR STAFF
21
767 500
500 3,000 500
29
6
2,600
VISITOR
+4.224
VISITOR STAFF
Bound
20
Boundary
30
7
ary
VISITOR
2,600
VISITOR STAFF
20"
42'
58836°
35
Line of Easement
17.9 m2 19
31
8
VISITOR
2,600
VISITOR
STAFF
18
9
14.5 m2 VISITOR
2,600
VISITOR
17
25.3 m2
42"
21'
75827°
61
10
VISITOR
2,600
+4.175
VISITOR
16
11
VISITOR
2,600
VISITOR
15
2
8m
12
VISITOR Outdoor Play
Bikes x4
2,600
684.17m2
VISITOR
14
Existing Boundary
2,400
B
Garden Path and Pedestrian Pathway
11.4 m2
LANDSCAPED DRIVEWAY Accessible 2,100 Proposed Boundary Realignment
2,400
BIO-RETENTION
16.8 m2
13
47"
53'
588154°
9
6 m2
47"
53'
146154°
4
ack
46"
35'
950154°
2
Setb
ding 9
Buil 10,53
25"
1'
512153°
2
5"
37'
980150°
4
Bou
nda
12"
25'
980147°
4
ry
0
4,00
23"
48'
465145°
9
158.6 m2
1"
16'
047139°
18
34"
56'
936130°
4
23"
22'
936127°
4
Revision Project Architect Stage Project No.
Site Plan - Open Space
09 Updated Drawings 21/03/2023 Noosa Early Learning Centre SC Development Approval 1187-03 Revision
10 Updated Drawings 24/03/2023 Lot 4 Noosa
11
12
13
Updated Drawings
Updated Drawings
Updated Drawings
27/03/2023
28/03/2023
4/04/2023
Client
Stockwell Development Group Pty Ltd
Drawn
AM
Status
Not For Construction (#Notes)
Scale
1:250 at A3
A-DA-01.02 13
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. \\EA-FS19\ServerFolders\Public\Data 1\1187-05 Sanctuary Noosa Childcare Centre\5.2 Development Application\5.2.1 ArchiCAD\1187-05 Master DA 24.pln
Section 5
Landscaped Playscape
FNC-1
sd
Landscaping Bike
sd
SERVICE
sd
sd
VISITOR/ TURNING
STAFF STAFF
sd
VISITOR
sd VISITOR STAFF
sd
Garden Path and Pedestrian Pathway
VISITOR
VISITOR STAFF
sd
VISITOR
VISITOR STAFF
Landscaping
sd
VISITOR
sd
sd
VISITOR STAFF
Vegetated Covenant
VISITOR
sd
VISITOR
STAFF
sd
VISITOR
VISITOR
STAFF
sd
DRIVEWAY
VISITOR
sd
VISITOR
sd
VISITOR
sd
VISITOR
sd
VISITOR
VISITOR
sd
sd
sd
VISITOR
VISITOR Bike
VISITOR
sd
Arbour Arbour
Accessible
sd
sd
Bio-Retention
Seat
sd
sd
FNC-2
sd
sd
Landscaped Playscape
sd
sd
sd
sd
FNC-2
sd
Landscaping
sd
sd
sd
sd
sd
sd
sd
sd
Revision Project Architect Stage Project No.
SIte Plan - 3D
05 Updated Drawings 21/03/2023 Noosa Early Learning Centre SC Development Approval 1187-03 Revision
06 Updated Drawings 24/03/2023 Lot 4 Noosa
07
08
09
Updated Drawings
Updated Drawings
Updated Drawings
27/03/2023
28/03/2023
4/04/2023
Client
Stockwell Development Group Pty Ltd
Drawn
AM
Status
Not For Construction (#Notes)
Scale
1:250 at A3
A-DA-01.03 09
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. \\EA-FS19\ServerFolders\Public\Data 1\1187-05 Sanctuary Noosa Childcare Centre\5.2 Development Application\5.2.1 ArchiCAD\1187-05 Master DA 24.pln
Section 6
Activity Room Calculations
Outdoor Play
FNC-1 Age: 0-24 mnths Room Name Age Group Area Required Area Provided Staff Ratio Staff Required Occupancy
TANK Area: 87.40
AC Occupancy: 12
AC Activity Room 1 0-24 mnths 39 41.62 1:4 3 12
45"
16'
068299°
43
Bikes x6 Dry
B
Ldy/cleaner
End of trip Store Activity Room 2 2-3 yrs 65 67.20 1:5 4 20
MSB facilities
Bin
Lockers
Kitchen
1
VISITOR/TURNING
500 500
Bottle Activity Room 3 2-3 yrs 65 67.20 1:5 4 20
SERVICE BAY B
Prep Amenities
Activity Room 4 3-5 yrs 72 72.32 1:11 2 22
6,500
Lockers
Activity Room 1 Activity Room 5 3-5 yrs 72 72.23 1:11 2 22
25
2
Staff Room Age: 0-24 mnths
VISITOR STAFF STAFF
Area: 41.60
Occupancy: 12
313 320.57 m² 15 96
24
26
3
Garden Path and Pedestrian Pathway
VISITOR VISITOR STAFF
Sleep Room
Store &
Comms Bed Age: 0-12 mnths Ext Store
23
Seat
Area: 18.30
27
4
VISITOR
VISITOR STAFF Outdoor Play Calculations
22
Activity Room 2
28
Age: 2-3 yrs
Area Name Age Group Area Required Area Provided Occupancy
5
VISITOR Area: 67.20
VISITOR STAFF Occupancy: 20
Outdoor Play 0-3 yrs 84 87.43 12
21
GFA
29
621.3 m2
6
VISITOR Outdoor Play 2+ yrs 588 596.74 84
VISITOR STAFF
5,400 5,400
20
Pram Bed Prep Store Amenities 672 684.17 m² 96
30
7
VISITOR Store
VISITOR STAFF
20"
42'
58836°
35
19
31
FHR +
8
Activity Room 3
VISITOR EDB +
NBN Age: 2-3 yrs
VISITOR
STAFF Services Area: 67.20
18
Occupancy: 20
9
VISITOR S-14
10.01
VISITOR
Office East
17
West 09.01
09.01
42"
21'
75827°
61
10
VISITOR Bed
Activity Room 4
VISITOR Meeting Age: 3-5 yrs
16
Area: 72.30
Occupancy: 22
11
VISITOR
VISITOR Reception
15
4,100
12
VISITOR Bikes x4
VISITOR USAB
FNC
Prep Store Amenities
-1
14
SW Connection to Bio
Garden Path and Pedestrian Pathway
B 1:405,400
Max
1:40= 135mm
ARBOUR Timber Bridge
Activity Room 5
1:20 max to
connect to
footpath
LANDSCAPED DRIVEWAY Accessible Age: 3-5 yrs
BIO-RETENTION 1:40 Max Area: 72.20
Occupancy: 22
13
Bio Basin ARBOUR
Seat
MAIN
PEDESTRIAN
47"
53'
588154°
9
ENTRY
Bed
47"
53'
146154°
4
46"
35'
950154°
2
25"
1'
512153°
2
Outdoor Play
Age: 3-5 yrs
5"
37'
980150°
4
Area: 596.70
FNC
-2 Occupancy: 84
12"
25'
980147°
4
S-11
09.02
23"
48'
465145°
9
1"
16'
047139°
18
34"
56'
936130°
4
North
09.01
S-10
Revision Project Architect Stage Project No.
Floor Plan - Ground
09 Updated Drawings 21/03/2023 Noosa Early Learning Centre SC Development Approval 1187-03 Revision
10 Updated Drawings 24/03/2023 Lot 4 Noosa
11
12
13
Updated Drawings
Updated Drawings
Updated Drawings
27/03/2023
28/03/2023
4/04/2023
Client
Stockwell Development Group Pty Ltd
Drawn
AM
Status
Not For Construction (#Notes)
Scale
1:250 at A3
A-DA-03.01 13
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. \\EA-FS19\ServerFolders\Public\Data 1\1187-05 Sanctuary Noosa Childcare Centre\5.2 Development Application\5.2.1 ArchiCAD\1187-05 Master DA 24.pln
Section 7
ROOF LEGEND
CB-C1 Colorbond Custom Orb Surfmist
DP Downpipe
EG Eaves Gutter
LBB Line of Building Below
WB Whirly Bird
LBB
45"
16'
068299°
43
LBB
LBB
16.0° Pitch 16.0° Pitch
CB-C1
WB
16.0° Pitch
CB-C1
CB-C1
CB-C1 LBB
16.0° Pitch
LBB
LBB
16.0° Pitch
CB-C1
16.0° Pitch
CB-C1
LBB
WB WB
LBB
INDICATIVE SOLAR INDICATIVE SOLAR
PANEL LOCATION PANEL LOCATION
20"
42'
58836°
35
WB WB
CB-C1 CB-C1
16.0° Pitch 16.0° Pitch
LBB
S-14 S-14
10.01 10.01
LBB
42"
21'
75827°
61
16.0° Pitch
CB-C1 WB WB
16.0° Pitch
CB-C1
LBB
LBB
BRIDGE ARBOUR
LBB WB WB
ARBOUR CB-C1
16.0° Pitch
LBB
47"
53'
588154°
9
LBB
47"
53'
146154°
4
46"
35'
950154°
2
25"
1'
512153°
2
5"
37'
980150°
4
12"
25'
980147°
4
23"
48'
465145°
9
1"
16'
047139°
18
Revision Project Architect Stage Project No.
Roof
05 Updated Drawings 21/03/2023 Noosa Early Learning Centre SC Development Approval 1187-03 Revision
06 Updated Drawings 24/03/2023 Lot 4 Noosa
07
08
09
Updated Drawings
Updated Drawings
Updated Drawings
27/03/2023
28/03/2023
4/04/2023
Client
Stockwell Development Group Pty Ltd
Drawn
AM
Status
Not For Construction (#Notes)
Scale
1:250 at A3
A-DA-04.01 09
(07) 3251 6900 [email protected] Elevation Architecture Pty Ltd ACN 606 170 807 © Copyright reserved this document is and shall remain the property of Elevation Architecture. Unauthorised use of this document in any form whatsoever is prohibited. All information to be printed in colour. Figured dimensions take precedence over scale dimensions. Contractors must verify all dimensions on site before commencing any work or making shop drawings. \\EA-FS19\ServerFolders\Public\Data 1\1187-05 Sanctuary Noosa Childcare Centre\5.2 Development Application\5.2.1 ArchiCAD\1187-05 Master DA 24.pln
The text continues on section 8.
Used in these records
RFI - Attachment 1 - Amended Architectural Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.