2016-12-06 Planning & Environment Committee Agenda

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             6 DECEMBER 2016




                                 Figure 6 – Aerial Photograph
3.   STATUTORY PROCESS
The proposed change to the development approval requested by the applicant is determined to
constitute a permissible change in accordance with S367 of the Sustainable Planning Act 2009
on the grounds that:
    The change would not result in a substantially different development as the use remains
      the same as that approved. The changes reduce the overall number of units on the site and
      slightly increase gross floor area from 17,571 m2 to 18,610m2, though it is noted that the
      original approval was approved with a floor area of 21,950m2.
    The changes do not trigger a new referral to the State Assessment and Referral Agency.
   The original development application was impact assessable and did not attract any public
     submissions. The changes do not introduce significant new aspects (such as increases in
     height or scale, changes in development footprint or different uses) likely to cause persons
     to make submissions on reasonable grounds; and
   The changes do not involve prohibited development.
The application was referred to the Department of Infrastructure, Local Government & Planning
to seek its views in relation to the State concurrence agency requirements applying to the
existing approval. The Department responded on 8 September 2016 advising it has no objection
to the changes.
The previous change application was referred to Unitywater because the approval included water
and sewer conditions. Unitywater advised on 20 January 2016 it had no objection to the
proposed changes and that the existing water and sewer conditions could be maintained.

                                                                                  Page 47 of 83
Log in to download the original file

2016-12-06 Planning & Environment Committee Agenda(PDF, 10MB).pdf · 10.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.