2016-12-06 Planning & Environment Committee Agenda
The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 DECEMBER 2016
Plan No. Rev. Plan/Document Name Date
7038-DA015 02 Resort Facilities Floor Plan 22/07/16
7038-DA019 03 Building A Elevations 22/07/16
7038-DA020 03 Building D Elevations 22/07/16
7038-DA021 03 Building D Elevations 22/07/16
7038-DA022 03 Building R Elevations 22/07/16
7038-DA023 03 Building S Elevations 22/07/16
4.2. Consequential Amendments to Conditions
Given the changes to the development plans, a number of further conditions of the approval
require amendment, as detailed below.
Condition 1 – Approved Plans
1. Prior to the issue of an operational works approval for the development, fully detailed
architectural proposal plans must be submitted for Council approval. Detailed plans must
provide the following details as a minimum:
1.1. Full architectural building elevations;
1.2. Detailed roof plans and ground level contours demonstrating compliance with the
development’s 8m/12m building height limits above natural and finished ground
levels;
1.3. Landscaping areas demonstrating compliance with Condition 5 herein;
1.4. The location of proposed stormwater management/treatment devices;
1.5. Consistency with all management plans for the development;
1.6. Building colour schemes demonstrating compliance with Condition 8 herein; &
1.7 Vehicle manoeuvring areas and temporary turning provisions.
Applicant’s Request
The applicant requests that condition 1 be amended to allow for full building elevations, including
detailed roof plans and ground level contours to be provided prior to civil operational works. The
applicant advises that the client is seeking to obtain upfront operational works approvals for
vegetation clearing and bulk earthworks prior to finalising detailed architectural drawings and
ground level contours.
Assessment
The original condition was imposed as the proposal plans submitted were indicative only and
further information was required to address building height, architectural elements and building
profiles, location of stormwater devices and the like. Approval of fully detailed plans was required
prior to proceeding with an operational works application.
Additional selected elevations have been provided, however fully detailed plans for the
development are still required.
The applicant now intends to stage the development and it is considered reasonable that fully
detailed plans be provided for approval for each of the relevant stages of development to ensure
that building construction can commence shortly after operational works are approved.
Page 50 of 83
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.