20327 - N41-T38-s285 Concurrence agency response With conditions · OPW15/0061
Attached to the e-mail SUPERSEDED OPW15/0061 Referral Agency Response.
SDA-0415-020327
No. Conditions Condition timing
Regional Harbour Master (Brisbane)
Maritime Operations Base
MacArthur Avenue East
Pinkenba QLD 4008
8. "As Constructed" drawings must be provided to: Within two weeks of
the completion of the
Regional Harbour Master (Brisbane) works
Maritime Operations Base
MacArthur Avenue East
Pinkenba QLD 4008
9. The construction, operation or maintenance of the structure, and At all times
any ship moored at this structure, must not impede the safe
navigation of other ships or restrict safe access to or from
neighbouring structures.
10. Any navigational aid that is damaged due to the construction, At all times
operation or maintenance of the approved development must be
promptly repaired or replaced at the applicant’s cost. In the event
that any damage is caused to any aid to navigation, the Harbour
Master must be immediately contacted on 07 3305 1700.
11. All structures, associated with the development must be lit/marked At all times
in accordance with the following specifications, such that they are
clearly visible to approaching ships and do not cause a risk to the
safe navigation of other ships:
Underwater obstruction signs adjacent to the area for visibility
by mariners.
Any anchors deployed to be marked with yellow buoys and
fitted with FL yellow lights to ensure safe navigation of other
ships.
All lighting must be provided in accordance with section 3 of
AS 4282-1997 'Control of the obtrusive effects of outdoor
lighting'
All floating plant and equipment shall be appropriately lit
and/or marked. Floating plant and equipment is to be lit in
accordance with the International Regulations for the
Prevention of Collision at Sea.
12. Any debris or similar obstruction encountered whilst undertaking Prior to the
the work must be suitably disposed of at the applicant's cost. completion of works
Department of State Development, Infrastructure and Planning Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20327 - N41-T38-s285 Concurrence agency response With conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 914 KB (small file)
- File type
No other editions are linked here.