Original source · versioned page text
SUPERSEDED - Compiled Reference Document - RAL25 0011 (As Published)
Email: [email protected] www.eaglesurveys.net ‘This plan Is prepared for Simon Harmond from field survey and existing records for the purpose of new constructions and subdivisions and should not be used for any other purpose. The tile boundaries show hereon were not marked at the time of survey and have been determined by plan dimension only. Services shown hereon have been located by field survey where possible. If not able to be so located, services have been plotted from the relevant authorities where available and have been noted accordingly on this plan. Where Single St ‘such records elther do not exist or are considered inadequate, a notation has been made Ingle, Storey, hhereon. Prior to any demolition, excavation or construction on the site, the relevant authority Brick, Dwelling ‘should be contacted for possible location of further underground services and location of 1 ll services. This note is an integral part of this plan. 805° Subdivision Proposal Plan Lot 3 on RP149081 #33 Crank Steet Tewantin Level Datum: PSM105341 RL8.712m AHD Contour Interval: 0.2m Client: Simon Harmond Surveyed By: FS Drawn By: CGB Date: 11-4-2025 LEGEND wl Water Meter || Electicty Box stormwater M/H @Fire Hydrant %* Light Pole Roofwater Pit @Scour Valve © Power Pole [lll Gully Pit @ Tap Electricity Pit Dd Gas Valve _|@ Sewer M/H_ aTelstra Pit © Tree os pspaction © Sign 4 Bench Mark Water Retic an_on— Edge of Bitumen Sewer Line ——-— Fence Stormwater Line - —--Top of Bank — Telstra Cable me Concrete ,— Elictrical Cable 0/H \\\ Building ~ Elictrical Cable U/G Kerb 1 SP241376 , Our Ref: 4236 ROL-A Scale 1:250 Original Size: A3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.