SUPERSEDED - Compiled Reference Document - RAL25 0011 (As Published)
LINDSAY CONSULTING PTY LTD
STRUCTURAL AND CIVIL ENGINEERS
ACN 079 744 808 ABN 61 478 386 385 GST REGISTERED
AS TRUSTEE FOR THE LINDSAY FAMILY TRUST
Issue Desired Outcomes
Litter, Hydrocarbons and 1. Remove gross pollutants and litter.
other contaminants 2. Avoid the release of oil or visible sheen to released waters.
3. Dispose of waste containing contaminants at authorised facilities.
Waterway Stability and 1. Where measures are required to meet post-construction waterway stability
flood flow management objectives, these are either installed prior to land disturbance and are
integrated with erosion and sediment controls, or equivalent alternative
measures are implemented during construction.
2. Earthworks and the implementation of erosion and sediment controls are
undertaken in ways which ensure flooding characteristics (including
stormwater quantity characteristics) external to the development site are not
worsened during construction for all events up to and including the 1 in 100 year
ARI (1% AEP).
Table 3 – SPP Appendix 2: Part 2 Construction Phase – Stormwater Management Design Objectives
for Temporary Drainage Works
Temporary Drainage Works Anticipated Operation Design Life and Minimum
Design Storm Event
<12 Months 12-24 Months >24 Months
Drainage Structure 1 in 2 year 1 in 5 year 1 in 10 year
ARI/39% AEP ARI/18% AEP ARI/10% AEP
Where located immediately up-slope of an 1 in 10 year ARI/10% AEP
occupied property that would be adversely
affected by the failure or overtopping of the
structure
Culvert Crossing 1 in 1 year ARI/63% AEP
Off. 2C/82 Parker St, Maroochydore 4558
OFFICE: (07) 54 792 118 MOBILE: 0412 313 645 FAX: (07) 54 510 118
E-MAIL: [email protected] 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.