Council archive · source document
10/0574 - MCU [As Published] · 132010.574
ooo 18: 18 owner's.consent required for this application? (refer.to notes at the end of this forn for more information) . = | (J No &] Yes - complete either table D, table E or table F as applicable Table D (note: do not complete this table if lodging the application on-line using Smart eDA) Name of owner/s of the land _—|See attached letter UWe, the above-mentioned owner/s of the land, consent to the making of this application. Signature of owner/s of the land Date Table E @ Name of owner/s of the land [J The owner's written consent is attached or will be provided separately to the assessment manager Table F Name of owner/s of the land oO By making this application, |, the applicant, declare that the owner has given written consent to the making of the application. 9: Does the application involve a state resource? (e-g. the application involves state‘land, or taking materials. Refer to the riotés. at'thé end of this form for more information) - (Yes - complete table G of the following apply to:the premises (tick applicable boxes): (1 | adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H [] _ onstrategic port land under the Transport infrastructure Act 1994 - complete table | CJ _ ina tidal water area - complete table J are any existing easements on the premises [XINo [1] Yes - ensure the type, location and dimension of each easement is included in the plans submitted Application Details - IDAS form 1 Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0574 - MCU [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.