MCU14/0077 - Approved Plans

of 11

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Legend

Proposed Landscaping
‘as shown on DD101

Proposed Concrete Hardstand
Type 1+ to owners spacification

Proposed Bio-retenton Basin
10 engineers design and detail

 

Proposed Traes

Proposed Shrub

Bige

Fonce Type 1 - bisck pve chairs fence with 3 stands
ol barbed wire above at 2.6 high

Gato Type 1 - siting gate on wheels to match biack pve chalewire
> tence with 3 strands of barded wire above at 24 nigh

Security Lighting -a min. of 4 excedor secur igi to be instated

Im aceardance wit OCA anit AS,

 

Minimum Density Required:

Large Trees 8 motro contros
Small Trees metre centres
Shrubs 1.5 metre contres
Groundeovars 05-1 metre centres
Minimum Sizing Required:

Stroot and feature troos 45it

Other trees 300mm

Large shrubs 200mm
Groundcovers, 450mm

Proparation of garden beds for planting:
CCuttivate oxisting soll in natural ground to a
minimum depth of 150mm. import clean topsoil
(sandy loam) to a minimum depth of 300mm,
abova original ground level. Organic matter, or
gypsum etc, may also be added as necessary
to improve the soil for the best

Tost the soll using a ‘Soll Test Kit to ensure itis
healthy and amend as necessary,

 

Bloretention Basins Construction - during
construction and establishment of tho
bioratention devices, the supervising RPEQ
must ensure that the device was constructed in

Systoms and Wetainds (Wator by Design, 2009)
and that the forms contained in section 3.15
including the associated supporting information
and data are comploted. These forms and
certification from the RPEQ that the devices has
been constructed in accordance with the above
mentioned guide, ail conditions of approval, and
the approved engineering drawings must be
‘submitted to council prior to commencement of
uso.

Bioretention Basins Construction - A
construction hold point with a council delegate
shall be established once the bioretention
devise underdrainage pipe work is installed. At

complies with the specification contained in the
Jatest versiion of the “Guidelines for Soil Filter
‘Modia in Biorotention Systoms* and that tho

drainage layer meet the bridging criteria (stated
in the decision notice).

Landscaping - Landscape works must be
, Constructed and certified by

qualified persons (please refer to Decision

Noticos for cofinitions).

 

Use only sun ‘hardened" plants . Ensure
healthy root system to all plants to be used.
Under no circumstances are root bound plants
to be used.

Trees:

All 4SL trees and large shrubs will need to be
staked securely using 1800mm stakes x 2 or 3
‘as necessary and tied to stakes usind hesian

Mulch:
All gardens are to be mulched with Tee Tree?
mulch to a minimum dopth of 100mm , to be
kept 50mm from stems of plants to avoid coolar
rot

Drainage:
Please ensure adequate drainage is installed
below gardens and paved and concreted areas.

Location of Services and Levels:
Please refer to Hydraulics Plan for full
information on services type and location and
finished levels.

General Notes:
Concrete rollback kerb for carpark edges and
garden boundaries as necessary, to Engineer's.
detail

The Noosa Plan - Soe Tablo 14-56 or 14-57 for
minimum Landscaping areas and dimensions.
Landscaping is designed, and to be planted and
maintained in accordance with PSP3 Landscaping

Plants and Guideline.

 

 

 

 

  

 

 

 

 

 

 

 

Ir
[
Plant Schedule
Botantical Name Common Name —|Holght) Spread | Pot
ind Large Shrubs
Cupaniopsis anacardioides | Tuckerco 6m | 6m | 4st
Acmena smithii Dwar Lilly Pilly 25m | 2m = | 300mm
Linospadix monostachya | Walking Stick Palm | 2.5m | 1.5m 300mm
‘Small Shrubs and Ground Covers:
| 71] = Cg |Carpobrotus glaucescons | Pigtaco 0.4m | 1.5m | 150mm
56 | Er 9B |Enostemon spp Qid Wax Flower | 0.8m | 0.8m | 150mm
i
Bio-retontion Basin - 6 plants min, requred per m2
40) Ca | Carex appressa Sedge Tutting | 140mm
40} Cf | Carex fascicutaris Sedge Tufting | 440mm
40] Fn |Ficinia nodosa Knobby Glub Rus | Bim* | Tutting |140mm
40 Ju |Juncus usitatis Upright Sedge fm? | Tutting |140mm
| 40 LU |Lomandra longifolia Mat Rush Bim? | Tufting [140mm

 

 

 

 

 

 

Approved Plans
MCU14/0077 &
OPW14/0324

Noosa Council
15 January 2015

 

Maintenance:

Itis the responsibilty of the omer to iia
the property to a satisfactory standard

Counci's approval.

A maintenance regime must be programmed to
maintain muich, water, fertilizer, pruning and the
care and/or replacment of any damaged or
diseased plant.

Short Term:

Long Term:

Fortiize ail plants each spring and when
required during tho yoar, Ensure use of native
“(eiendty fertilizer. Trees and shrubs to be
prunod after flowering to maintain healthy
growth and shape. Prune at the node for all
natives, Never ‘hard prune’ a plant unless on
reliable authority. Duo to breaking down,
organic mulch needs to be ‘tapped up" every
few years to maintain a thick cover. Stakes and

‘webbing, (to prevent plant damage until
All gardan beds to be mounded 300mm min ae “" For the first four wooks all plants must be wobbing which support troes may be removed
at centre of bed, above finished pavement r watered for a minimum of 20mins per day attor trees are suitably establishod.
levels, to provent any ponding around plants. Landsca ping reducing tot Omins pr day for following 5
Feelin using ask rloasa fortis in or months, (aways water in relation to rainfall)
‘granulo’ form, at time of planting, ensure t!
fezerdoos not drecly cniod os. Notes & Schedules
COOL ARCHITECTURE Project | Issue-Date-Initial-Revision Tithe: | Drawing a:
( Elaroo Pty Ltd | A- 95. 0514-LR- Concept Design Landscaping Notes & DD702
. B-14.0514-LR-Design Development
Phone: 07 5448 8850 Proposed Industrial Dev | G-4910514-CR-Deart DAS? Schedules
[email protected] Lot 10/100 Rene Street | ede: 2014-LR Internal Btanging A3 Scale: Dos: LRIGM Project #: | Issue:
2A / 35 Seaside Bivd Marcoola Q 4564 Noosaville Q | J<fATOAA-LR-|atormation Request 1:200 chk: GM 14.019 | J

   

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_0077 - Approved Plans.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.