Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

MCU14/0077 - Approved Plans

of 11

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

RECOMMENDATIONS FOR ESTABLISHMENT & OPERATION:

PHASE OF ESTABLISHMENT:

‘The tat 2 Years after construction aro crucial forthe performance ofthe VBFS.

 

OPERATIONAL PHASE:

‘+ Perform routina inspections of tha ralngardan (VBFS) to identity any areas of obvieus increased sediment depesion, scouring fem
‘storm flows, ri erosion of the baters from lateral Inflows and elogaing

‘= Perform rouline inspocttons of the Inflow systoms in particular the grated draia and doan the gratod drain regular kon dobils and iter

Perform routine Inspections of the surface ofthe ralngarden and elean from iter and grozs polutants

Remove sediment bull ups in the alngarden

Repair any damage from vehicle trafic

Provide regular lrigation/wataring during extended dry periods

Romove any Invasive woods at any me

‘Romove plants that have died and replace them

+ Perform regular pruning as to Landscape Architects schodule to encourage growth and healthy estabtchmont of plants

‘+ Perform vegetation pest minotoring and control as to Landscape Architects schedule

RECOMMENDATION:

‘THE RAINGARDEN IS PROPOSED TO BE A STORMWATER TREATMENT DEVICE AS OPPOSED TO ANORMAL GARDEN
BED. WE RECOMMEND TO SET UP A SIGN EXPLAINING THE PURPOSE OF THE RAINGARDEN.

 

 

 

 

 

MAINTENANCE PLAN

WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FOR SOUTH EAST
‘QUEENSLAND (Chaplar 5, tom 5.6).

‘Tho maintenance of the biocotention basin clements involv:

‘+ Routine inspection ofthe bioretention basin protte to Kdontly any areas of obvious Increased sediment
\depostion, scouring from storm flows, il erosion ofthe batters from lateral Ifows, damago tothe profle
{rom vehicles and clogging ofthe blorotention basin (evident of "boggy" Miter modia surface).

‘= Routine inspection of inflows systems, overiaw pits and under-drains to Ktenify and claan any areas of
‘scour, iter bulld up and blockages,

‘+ Romoval of sodimont where itis smothering the bioretortion basin vegotation.

‘= Where a socimont forabay is adaptad, removal of accumulated sodimont.

‘Repairing any damage tothe profe rosuting from scour il erosions or vehicle damage by replacement of

‘appropriate Mt (to match onsite sols) and ravegotating.

“Titing ofthe bioretenion basin surfaco, or removal of the surface layer, if there is evidence of cogging.

FRogular wateringfirigation of vegetation unt plants are ostabished and actively growing.

Removal and management of invasive woods (norbickias should not be used).

‘Romoval of plants that have died and replacemonl with plants of equblantsizo and species as dotalied in

the plant schedule.

Pruning to remove dead or dicoasod vegetation material and o stimulate growth,

‘© Vegotation pest mentoring and control.

Roler "Water by dasign® by HEALTHY WATERWAYS,

 

647m? SITS

ROOF

806m? SS

DRIVEWAY

 

 

 

 

 

 

 

 

 

BIO RETENTION SYSTEM
TREATMENT TRAIN

 

 

 

 

 

RETENTION TANK

800

 

 

 

from carpark
to raingard
9g S iy

 

500

 

Approved Plans
MCU14/0077 &
OPW14/0324

Noosa Council
15 January 2015

 

50}

 

  

 

 

EDUCATIONAL SIGNAGE LAYOUT

 

 

‘SORCTUNTION ALTER E RONGANDET MAITOANCE OHERIST

 

 

 

fowe:

 

 

 

Eercere
77" = E

 

 

 

 

 

 

 

 

 

 

 

 

 

 

fe
ower aauue iF arrowitoe
me Hoe
|
tia
aa =
EEE
===

 

 

 

 

=, eure onwut a oruvens rs uscD

 

Ferme eecumaton of pipe eutts?

fee fe WOE fv CONTROSTOH.
ere 7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a
heat
eter we
[a oe rr 7 [ao RTE URDU REPRE TO A
Seren? Weng TT am ste
Far Beep Aeeoall
=e rr Tender |
a SERET
ati

 

 

 

 

aw ot archore iapected (t/hendwot/erle/eret)?

 

 

fiwon

 

 

‘commer Rolnhold Koonning wert kP¢0 vs 7023
eso
Sots Orech, 01D, 552 HSC

 

feat «one

 

RECEIVING WATERWAYS

 

Be (oN sen55_0e (on san es

 

WILSON CLARK CONSTRUCTIONS
RTT

COOL ARCHITECTURE
py onaan CODE ARGINTECIURE
‘eoxes 107100 RENE STREET

HOOSAVILLE

 

 

 

 

 

Bias TE
STORMWATER
‘quaury
MAINTENENCE
eee a | Ta
macsivs__eununn| +et¢ | 2864-OP4|A

 

 

 

 

 

RPD:— LOT 10 SP 230643,

 

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_0077 - Approved Plans.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.