Council archive · source document
Part 1 of 2 - Application Details - IDAS Form 1 - Part 1 of 2 - Application Details - IDAS Form 1 - 9 The Peninsula, Noosaville · OPW10/2072
UGA A Write code here zCO Y & o/ & THIS IS THE NEXT PART OF A MULTIPLE PART RECORD / Part ord (7 Le. RAM BCS EARL INFORMA HON MANAGEMENT RECORDS MA NAGEMENT:Conroi of Records EDRMS.Mulli Part Record Cover Sheet NEXT PART Is
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 14 pages
Page 2
Sa
Tee aia: <senGeem (oviia We 4
Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without ail
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
e complete this form (Application details - IDAS form 1)
° complete any other forms relevant to your application
“« provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
Ptease note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Names (individual or company name in full) |PILE-IT PTY LTD T/A NOOSA JETTY BUILDERS
For companies, contact name > IDANNY REED
Postal address PO BOX 299 NOOSAVILLE QLD 4566
nn
a a
Contact phone number 0408 137 526 Keg ~
St
Mobile number (non-mandatory) [ey RECEN..\
: Ft te
Fax number (non-mandatory) 07 5474 3480 SI =2 SEp 200 fe
e-mail address (non-mandatory) , [email protected] FX Ben .
rei”
1. What is the nature of development proposed? (tick all applicable boxes)
(2 material change of use of premises
(1 building work
operational work
C1 reconfiguring a lot Development Counter
VEAL of Infrastructure and Planning
Page 3
~~ ee 2. What type of approval is being sought? development permit (1) preliminary approval [] both - provide details below 3. Is the application for a mobile and temporary environmentally relevant activity (ERA)? No LJ Yes - complete table A and then go to question 5 4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row) Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the premises Street Address Lot on plan description Local government area Unit | Street Street name and official Post Lot No Plan type (e.g. Logan,Cairns) No. | No. suburb/locatity name code ‘| and plan no. 1 9 |The Peninsula, Noosaville [4568 |262 |RPBSE190 | Sunshine coast regional (Street address / lot on plan x Street address / lot on plan for the tand adjoining or adjacent to the premises (appropriate for development in water e.g. jetty, pontoon) . Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel dredging in Moreton Bay) Coordinates (note: place each set of coordinates in a separate row) Zone Datum Local government > - - reference area (If applicable) Easting Northing | Latitude | Longitude LJ GDA94 1 CJ wess4 . J other 5. Total area of the premises on which the development is proposed (indicate hectares or m?) 630m2 6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.) 1 |house 7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.) timber jetty and pneumatic boat storage device Application Details - IDAS form 4 Version 1.0 18 December 2009
Page 4
re 8. ls owner's consent required for this application? (refer to notes at the end of this form for more information) ~~ 7 [J No Yes - complete either table D, table E or table F as applicable Table D (note: do not complete this table if lodging the application on-line using Smart eDA) Name of owner/s of the land [Rick & Debbie Gloster . BS enrokt ~ Kad ate. ® fe t I/We, the above-mentioned owner/s of the fand, consent to the making of this application. Signature of owner/s of the land dV Onset Date ce o ¢\ No += Table E Name of owner/s of the land (J The owner's written consent is attached or will be provided separately to the assessment manager Table F Name of owner/s of the land o By making this application, |, the applicant, declare that the owner has given written consent to the making of the application. 9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry materials. Refer to the notes at the end of this form for more information) No (Yes - complete table G 10. Identify if any of the following apply to the premises (tick applicable box/es) adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H (1__ onstrategic port land under the Transport Infrastructure Act 1994 - complete table | CJ _ ina tidal water area - complete table J Table H Name of water body, watercourse or aquifer 1 |Noosa Waters Canal 11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water, etc.) No [_] Yes - ensure the type, location and dimension of each easement is included in the plans submitted Application Details - IDAS form 1 Version 1.0 18 December 2009
Page 5
a ~~ OAR > 42. Does the proposal include new building work or operational work on the premises? (including any ~~ ~~~ services) LINo Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted 13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the end of this form for more information) No - Go to question 15 CJ Yes 15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of the Sustainable Planning Act 20097 No LC Yes - provide details below 16. List below all of the forms and supporting information that accompany this application (inctude all IDAS forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question does not apply for applications made online using Smart eDA) Method of lodgement to Description of attachment or title of attachment assessment manager 1 |Form6é over the counter 2 |Checklist over the counter 3 | John Norden Plans over the counter 17. Applicant's declaration By making this application, | declare that all information in this application is true and correct (note: it is unlawful to provide false or misleading information). Application Details - IDAS form 1 Version 1.0 18 December 2009
Page 6
Notes for completing this form
Question 8:
e Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
« Owner's consent is not required for a mobile and temporary ERA.
Question 9:
« Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
e The Building and Construction industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable. *
e The portable long service ieave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction industry (Portable Long Service Leave) Regulation 2002.
Question 14:
* The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
. permit is issued.
e Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.qleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qid.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received { [ eh(2C10 Reference numbers OPu La/Qo7 7
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To: / Council. | have been engaged as the private certifier for the
. building work referred to in this application.
Date of Name BSA Certification Building
engagement license number classification/s
Application Details - IDAS form 7
Version 1.0 18 December 2009
Page 7
ape QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) Date receipted form sighted by |Name of officer who assessment _ [sighted the form manager QLeave Project |Amount Number paid (g) [Date paid Description of the work The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Application Details - IDAS form 1 Version 1.0 18 December 2009
Page 8
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 10 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
. complete Applicant details - IDAS form 1
. complete any other forms relevant to your application
° provide any mandatory supporting information identified on the forms as being required to accompany your
application.
‘All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport infrastructure Act 1994.
14. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
(building work - complete table A {XJ operational work - complete table B
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
(J road works (J stormwater [x] water infrastructure
(F drainage Works 0 earthworks CO sewerage infrastructure
(7) landscaping D3 signage CD clearing vegetation under the planning scheme -
[] other - please specify below
What type of approval is being sought? (if you have indicated multiple works in the above question, please
use an attachment to this form to detail each approval request)
development permit (preliminary approval (1 both - specify below
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
KX] No (1 Yes - specify the number of lots being created
.
. t a .
| we,
Are there any current approvals associated with this hag 2 i nge fuse)|
Developmerrtane ge)
[XJ No [] Yes - provide details below oa
7 1 SE> 2919
|
|
|
Tewantin
Page 9
eof a 2. What is the:dollar value of the proposed building work? (ine GST, materials and laboun) $ 25,000 Building and operational work assessable against a planning scheme -IDAS form 6 Version 7.0 18 December 2009
Page 10
O00 3. Confirm the following mandatory supporting information accompanies this application ae Confirmation of lodgement Method of lodgement All applications for operational works site plans drawn to scale which show the following: © the location and site area of the land to which the application relates (relevant land) the north point the boundaries of the relevant land * the allotment layout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, building envelopes and existing or proposed open space (note: numbering is required for all lots) © ‘any existing or proposed easements on the relevant land and their function © any access [imitation strips | * ail existing and proposed roads and access points on-the relevant land X|confirmed |over the counter a statement about how the proposed development addresses the local government's planning schemes and any other planning documents televant to the application [J confimed Applications for operational works involving earthworks (fitting and excavating) drawings showing: ¢ existing and proposed contours *° areas to be cut and filled * the location and level of any permanent survey marks or reference stations used as datum for the works ¢ the location of any proposed retaining walls on the relevant fand and their height © the defined flood level (if applicable) © the defined fill level (if applicable) [] confirmed Applications for operational works invoiving roadworks drawings showing: 6 existing and proposed contours the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points . * information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) ® kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parallel to centreline) edge of pavement where kerb is not constructed position and extent of channelisation location and details of all traffic signs, guideposts, guardrail and other street furniture Pavement markings including details on raised pavement markers catchpit, manhole and pipeline locations drainage details (if applicable) cross road drainage culverts (if applicable) concrete footpaths and cycle paths location and details for access points, ramps and invert crossings changes in surfacing materiat [_] confirmed Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 11
Cr Confirmation of lodgement Method of lodgement Applications for operational works involving stormwater drainage drawings showing: ¢ existing and proposed contours * drainage locations, diameters and class of pipe, open drains and easements oO confirmed ¢ manhole location, chainage and offset or co-ordinates and inlet and n outlet invert levels ¢ inlet pit locations, chainage and offset or co-ordinates and invert and kerb levels Applications for operational works involving water reticulation drawings showing: © kerb lines or edge of pavement where kerb is not constructed @ location and levels of other utility services where affected by water reticulation works pipe diameter, type of pipe and pipe alignment water main alignments water supply pump station details (if applicable) minor reservoir details (if applicable) conduits location of valves and fire hydrants focation of house connections (if applicable) location of bench marks and reference pegs (J confirmed eos eet 8 € Applications for operational works involving sewerage reticulation drawings showing: * location of all existing and proposed services « location of ail existing and proposed sewer lines and manhole locations ¢ location of all house connection branches . * kerb lines or edge of pavement where kerb is not constructed * chainages- Clconfirmed ¢ design sewer invert levels * design top of manhole tevels ¢ type of manhole and manhole cover * pipe diameter, type of pipe and pipe alignment ¢ location of house connections (if applicable) * sewer pump station details (if applicable) Applications for operational works involving street lighting drawings showing: @ location of all light poles and service conduits e location of all other cross road conduits © type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment details of lighting levels L_] confirmed Building and operational work assessable against a Planning scheme - DAS form 6 Version 1.0 18 December 2009
Page 12
vat Confirmation of lodgement Method of lodgement Applications for operational works involving public utility services drawings showing: * any existing light poles and power poles : any existing underground services (confirmed e details of proposed services * altemation to existing services Applications for operational works involving landscaping works drawings showing: ¢ the location of proposed plant species * a plant schedule indicating common and botanical names, pot sizes and numbers of plants , ® planting bed preparation details including topsoil depth, subgrade Preparation, mulch type and depth, type of turf, pebble, paving and []confirmed garden edge the location and type of any existing trees to be retained construction details of planter boxes, retaining walls and fences the proposed maintenance period irrigation system details oe e @ Notes for completing this form: . * This form can also be used for development applications for building works or operational works assessable . against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to mean the land use plan for the airport land. Privacy -please refer to your assessment manager for further details on the use of information recorded in this form. OFFICE USE ONLY Date Received Reference Numbers’ The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Buiiding and operational work assessab‘e against a planning scheme - D&S form 6 Version 1.0 18 December 2009
Page 13
Development assessment checklist - iDAS
checklist 1 -
(Sustainable Planning Act 2009, version 1.0 18 December 2008)
Develonm
RMent C » hey ys
This checklist applies to the carrying out of development generally. p tt WOurte)
You are not required to complete this checklist as part of your d evdloptient applicatiog, er you may submit the
| stan ee to ead SER A
checklist with your application if you wish. The purpose of the heekli is to assist yOO in ifying:”
* whether you.need to make a development application for the proposed oer SAAS :
* ifa development application is required, the relevant IDA: T-yer-ased to copie as part of your application
+ whether you need to give a copy of your application to any referral agencies.
If your development involves a material change of use, reconfiguring a lot or operational works, itis recommended
that you complete Material change of use -1DAS checklist 2, Reconfiguring a lot - IDAS checklist 3 or Operational
works -IDAS checklist 4, as applicable.
If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.aid.gov.au.
Ajl terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Part 1 - General questions
4.1Have you received a referral agency response in relation to this proposed-development prior to making
an application? . .
KINo
ces |" To assist you in preparing your application, completing Referral agency responses - IDAS checklist
; 6 is recommended
1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?
Ki No
. You must complete Request fo apply a superseded planning scheme - Sustainable Planning Act
ClYes form 2 and give this notice to the relevant local goverment. ifthe local government agrees to
your request, details must be provided in Application details - IDAS form 1
4.3 Does the proposal invoive removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 2000? ~
IXINo
OlYes |- It is recommended that you complete part 2 of this checklist
1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensland Heritage Act 1992? .- , .
No
Yes }- It is recommended that you complete part 3 of this checklist
. Bega eis Ci infrastructure € r
ree
Berube
Page 14
CET
14.5 Does the proposal involve development on a local heritage place?
IX] No
{Yes } It is recommended that you complete part 4 of this checklist
1.6 Does the proposat! involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?
No
OlyYes }- It is recommended that you complete part 5 of this checklist
4:7 Is any part of the development on strategic port land or airport tand (other than development fora ~
material change of use that is inconsistent with the land use plan for the strategic port land or airport fand)
XINo
OYes |}- [t is recommended that you complete part 6 of this checktist
1.8 Is any part of the development on fand below a high water mark within-the limits of a port under the
Transport Infrastructure Act 1994?
IXJNo
OlyYes |- It is recommended that you complete part 7 of this checklist
1.9 Is any part of the premises designated for community infrastructure?
XI No
LyYes '}- itis recommended that you complete part 8 of this checklist
4.40 Does the proposal involve the establishment or expansion of a waste water disposal system?
IXINo
OlYes |. . It is recommended that you complete part 9 of this checklist
1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?
{No
0 Yes |- It is recommended that you compfete part 10 of this checklist
Privacy - please refer to your assessment manager for further details on the use of information recorded in
this checklist.
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
-not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.
Development application assessment checkiist - IDAS checklist 1
Version 1.0 18 December 2009
Page 15
tai ' ee | OFFICE USE ONLY } Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. Development application assessment checklist -1DAS checklist 7 Version 1.0 48 December 2009
Used in these records
Part 1 of 2 - Application Details - IDAS Form 1 - Part 1 of 2 - Application Details - IDAS Form 1 - 9 The Peninsula, NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 595 KB (small file)
- File type
No other editions are linked here.