Council archive · source document
Part 1 of 2 - Application Details - IDAS Form 1 - Part 1 of 2 - Application Details - IDAS Form 1 - 9 The Peninsula, Noosaville · OPW10/2072
O00 3. Confirm the following mandatory supporting information accompanies this application ae Confirmation of lodgement Method of lodgement All applications for operational works site plans drawn to scale which show the following: © the location and site area of the land to which the application relates (relevant land) the north point the boundaries of the relevant land * the allotment layout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, building envelopes and existing or proposed open space (note: numbering is required for all lots) © ‘any existing or proposed easements on the relevant land and their function © any access [imitation strips | * ail existing and proposed roads and access points on-the relevant land X|confirmed |over the counter a statement about how the proposed development addresses the local government's planning schemes and any other planning documents televant to the application [J confimed Applications for operational works involving earthworks (fitting and excavating) drawings showing: ¢ existing and proposed contours *° areas to be cut and filled * the location and level of any permanent survey marks or reference stations used as datum for the works ¢ the location of any proposed retaining walls on the relevant fand and their height © the defined flood level (if applicable) © the defined fill level (if applicable) [] confirmed Applications for operational works invoiving roadworks drawings showing: 6 existing and proposed contours the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points . * information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) ® kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parallel to centreline) edge of pavement where kerb is not constructed position and extent of channelisation location and details of all traffic signs, guideposts, guardrail and other street furniture Pavement markings including details on raised pavement markers catchpit, manhole and pipeline locations drainage details (if applicable) cross road drainage culverts (if applicable) concrete footpaths and cycle paths location and details for access points, ramps and invert crossings changes in surfacing materiat [_] confirmed Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 1 of 2 - Application Details - IDAS Form 1 - Part 1 of 2 - Application Details - IDAS Form 1 - 9 The Peninsula, NoosavilleRelated documentApplication case desk ↗
About this file
- File size
- 595 KB (small file)
- File type
No other editions are linked here.