Original source · versioned page text
WD-P2 architecturals for tender
Attached to the e-mail Civil Design, Architectuals, Geotech Report FW_ Lot 89 #51 Seaview Terrace_ Sunshine Beach.msg.
A B C D E F
6,350 2,310 4,250 7,000 4,780
01 02 03 04
3.4 3.4
3.3 3.3
manual cassette block-out blind manual blockout blind manual blockout blind
22
23
26
25
27
in window reveal (total block-out) in window reveal in window reveal
1
shadowline shadowline
exhaust in Bath
1,500
2400 h bulkhead exhaust
24
in PR2 cabinetry to ceiling
2150 cabinetry head
2590 h ceiling
22
250mm linear grille ht. 2
2340 cabinetry head
1,000
250mm linear grille ht.
●
●
2400 bulkhead
-4
6
0
6
-5
●
ac 3
L'DRY
920
6
2200 bk
PR.2
-5
●
2510 bk
2400
2,050
●
PB-01 PB-01
24
ENS 3 LIFT
1,910
MEDIA
2340 bk
2590 2590 C-01
95
A PB-01 PB-01
h
2510 bk
3.1
ac 2590 2590 h h 250 2710 h
BED 3 BATH BED 2
ac RL ...
PB-01 PB-01 PB-01 4
Raking 2590 h 2590 h
PB-01 manual sheer curtain
2,035
motorised block out blind
00
250
120
PB-01 PB-01
28
2590 HALL_UG HALL_UGF 2590 h
● ●
2710 5
U/s slab 2340 bk ac
28
27
40
motorised sheer curtain
DECK 3 PLANTER
B
3.2 PB-01 Void motorised block out blind manual sheer curtain
cabinetry to ceiling
Raking motorised block out blind
LIVING 2 DECK
50
PB-01 C-01
30
0
● 0
-1
-2
0
2590 h U/s slab
●
●
●
5,665
2710 from ground FFL
manual sheer curtain 2960 h from Deck FFL
motorised block out blind motorised sheer curtain track
motorised block out blind legend
34.17 m2
C-## concrete type ##
blind pelmet
TL-## timber board lining type ##
240
refer to 06 PB-## plasterboard type ## 6
Stair2 Detail #LayID
ROOF GARDEN
1,200
2560 H - Clear distance from finished
floor level to ceiling.
7
motorised sheer blind motorised sheer curtain track
- Raking ceiling point.
●
motorised block out blind motorised block out blind Clear distance from finished
30
00
floor level to ceiling at ceiling/
26 wall junction
blind recessess
- 120h x 120w min. clear for single
blind or curtain.
- 120h x 240w min.clear for two
02 04
3.3 3.4 curtains or blind and a curtain.
- check clearances with blind / curtain
03
manufacturer before recess or pelmet
3.4 construction.
- powered blind / curtain requirements
to be confirmed by manufacturer.
refer to materials and finishes schedules and
onwards for further detail/specs
25
NOTE: all structural elements; including all slabs,
columns, beams, footings and framing to be in
accordance with structural engineer's design and
detail.
po box 603 noosa heads qld 4567 project issue issue issue drawing name project number
ph 07 5455 4808
email [email protected] new house P2 28/03/2025 For Tender working drawings 2308
abn 85 114 469 395 51 Seaview Tce, Sunshine Beach upper ground floor ceiling
reg no 002195
This drawing is subject to copyright and cannot client plan drawing no.
be reproduced in any medium without the
written permission of Tim Ditchfield Architects
Susan & Mark de Medici Scale 1:100 @A3 WD 2.6 P2
GSPublisherVersion 1893.2.14.16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.