Original source · versioned page text
Landscape Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn seed landscape design
t 07 3217 6491 m04 1616 9858
po box 527 paddington qld 4064
www.seedlandscapes.com.au
abn 85 468 007 510
GENERAL EXCAVATION AND CULTIVATION & FILL & TOPSOIL EROSION AND PLANT SUPPLY EXISTING TREES
EARTHWORKS SUBSURFACE SEDIMENT CONTROL
All works to be performed by a Convey soils, earth, sand, loose debris Unless otherwise specified, reinstate DRAINAGE Fill and subsoil material used to
make up levels shall be re-used from
The Landscape Contractor shall
supply plants as specified in the
Protect all existing vegetation unless
otherwise specified. All vegetation
licensed Contractor familiar with and the like to or from the site in a all existing surfaces, items, structures Inspect the site and ascertain the The Landscape Contractor shall
landscape construction of this nature. manner that will prevent dropping of and anything disturbed or damaged by previous earthworks operations on ensure measures to minimise planting schedule. Plants shall be and weed removal is to be carried
nature of excavation required and
The Contractor shall verify the location materials on streets, public and the performance of the works, to its The Landscape Subcontractor is to site where possible which is delivered on site true to pot size, out using industry standard accepted
the working conditions that will be erosion and situation.
of utilities on site prior to the private areas. Ensure that the wheels, condition at the commencement of provide for sufficient surface and composed of natural site subsoils species and type, and free of weeds, safety procedures and equipment to
encountered prior to the Take all precautions necessary to
commencement of construction, and tracks and body surfaces of all vehicles the Contract, other than that forming sub-surface drainage to garden and but free from stones, sticks, roots, prevent erosion, contamination and disease and fungal infection. ensure personal and environmental
commencement of work. The
ensure that they will not have an and plant leaving the site are free of part of or directly modified by the new grass areas to ensure adequately rubbish and material toxic to plant Substitutes will not be made without protection. Avoid damage to nearby
location of topsoil stockpiles, sedimentation of the site,
effect on the works. The Landscape mud and that mud is not carried onto work. drained soft landscaped areas free growth. prior consent of the Landscape trees and surroundings.
roadway and cut embankment surrounding areas, water and
Contractor is advised to visit the site adjacent paved streets or other areas. Remove and cart away debris, spoil from surface ponding water and drainage systems, in accordance Architect.
profiles and water connection points
to satisfy themselves as to local Restrict dust caused by the Works to a and surplus building materials from heavy/ waterlogged soils. Surface Supply and install imported topsoil Grub out stumps and roots over
must be taken into account. with the Environmental Protection
conditions, accessibility, storage minimum. Take all practicable steps the site and buildings, with the and sub-surface drainage is to aid in where necessary that complies with Ensure that trunks and branches 75mm diameter to a minimum depth
(Water) Policy 1997. are free of dieback, cavities,
space, the full extent and character of to minimise noise resulting from the exception of those works associated Surface drainage shall be diverted the healthy growth and continued Australian Standards to all turf of 500mm below sub-grade. Stumps
the works and the site, the nature of Works. with others prior to practical thriving of all plant stock and grass (100mm) and garden (300mm) areas sunburn and secretions. Trunk and less than 75mm diameter shall be
clear of excavations and covers shall Methods of protection shall include
the ground, the supply of materials completion. areas. as shown on drawings unless branches are to be evenly tapered cut off at ground level and treated to
be provided where necessary for but not be limited to the following:
and water and the execution of the Check all delivery tickets, labels, otherwise specified. Ensure modified and textured typical of the specie. prevent regrowth.
safety. Ensure that run-off is not Comply with the relevant Australian
contract generally. No claim will be identification marks and, the goods Fire Ant Control site soil is free from stones, sticks, · Construction of temporary surface Plant material is to be matured
concentrated onto adjoining Standards to the extent that they are
allowed for any alleged inadequacy of themselves to ensure that all The Landscape Subcontractor is to roots, rubbish and material toxic to swales; enough to support themselves Completely remove woody weeds
properties and does not cause a relevant and not over-ridden by the
the description herein. Should there products comply with the project allow to carry out all necessary plant growth. Modified topsoil shall · Diversion and dispersal of without staking. within the extent of works.
nuisance thereto. Finished surfaces specification.
be any conflict, the Contractor shall documents. Where different types of measures, inspections and safeguards have a friable structure with good concentrated flows to point where
shall be graded in accordance with
notify the Landscape Architect any product are specified, check to to ensure Fire Ants do not enter the drainage and high organic content. the water can pass through the
Construction Plans. Cultivate sub-grade to a minimum
immediately. ensure that the correct type is being site via equipment, machinery, site without damage;
Erect barriers as required to depth of 150mm prior to placing
used in each location. In particular, materials and plant stock. · Construction and maintenance of
prevent excavated material and topsoil to all planting and turf areas
Establish exact locations of services, check that:- silt traps (eg hay bales) to prevent
rocks from intruding onto adjoining on ground.
drains, sewers and water supply lines All stock has been adequately the discharge of scoured materials
and points prior to commencing works protected for loading and in transit. properties. to downstream areas;
Minimum cross falls of 1:50 on
and ensure their protection during the The sources, types, qualities, finishes · Progressive restoration of
planting and pathways to drainage
works. and colours are correct, and match disturbed areas;
collection points and overflow
any approved samples. · Construction of temporary siltation
points. Planting areas should not
Figured dimensions shall take The correct species, cultivars, pot fencing.
exceed 1:3.
precedence over scale measurements sizes, plant height, girth or spread Any erosion damage reinstatement
and large scale drawings over small have been supplied for each or cleanup as a result of the
scale. Unless otherwise specified the consignment from the supplier. contractor not adequately protecting
dcb developments
Drawings and Specification shall All materials should be clean, the site, materials or the works shall
include everything reasonable for the undamaged and otherwise in good be the responsibility of the
proper and entire completion of the condition. landscape contractor.
work.
Verify discrepancies between Ensure adequate provision is made for Remove temporary erosion control
Specification and Drawings with the the protection and storage of measures when they are no longer
Landscape Architect before deliveries. In particular ensure that:- required.
proceeding with the particular work. Materials which may deteriorate with
Failure to do so will not be taken as a storage must not be stockpiled on site.
reason to claim for extra work. Adequate and appropriate provision is
made for storage prior to deliveries
CLIENT
arriving on site. ALL materials in
storage are to be suitably protected
from physical damage and extremes
of weather. Keep storage areas neat
and tidy.
issue
a
ENVIRONMENTAL TURFING MULCH FERTILISER MAINTENANCE/ESTABLISHMENT
PROTECTION Supply and install organic mulch to a Provide proprietary fertilisers,
PERIOD
Supply and install A-grade turf
oct 2021
minimum of 100mm and gravel delivered to the site in sealed bags
The Landscape Contractor should (variety specified on drawings) to
mulch to a minimum of 50mm. marked to show manufacturer or Maintenance of all landscape works
date
consider in every instance whether areas shown on drawings. Finishing
Ensure mulch meets Australian vendor, weight, fertiliser type, N:P:K is to be carried out by the Contractor
the use of chemicals is strictly levels should be flush with adjacent
Standards and is free from ratio, recommended uses and until completion of the landscape
necessary before application, and surfaces unless otherwise detailed.
deleterious matter, fungi and application rates. Store in a dry works.
assess the product, site conditions Spread topsoil and grade surface to
disease. Mulch shall finish 25mm secure environment. Apply Maintenance includes replacement
and species to ensure minimum risk ensure a level finished surface,
below adjacent surfaces. according to manufacturer's of dead and/or diseased plant stock,
to his employees, other users of the which drains to nominated field
recommendations removal of weeds and rubbish, weed
gullies.
scale
site and the environment, and take (rate/reapplication/watering). spraying and mowing.
na
appropriate safety precautions in Turf to be free from nutgrass or
accordance with all current statutory other noxious weeds or any other
regulations. material deleterious to plant growth.
specifications
drawn
Deliver the turf within 24 hours of
ps
cutting, and lay it within 36 hours
of cutting. Prevent it from drying
out between cutting and laying.
drawing no
210920 02
DRAWING
183 weyba road
noosa qld 4566
210920
PROJECT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.