Approved Decision Notice & Approved Plan by the Noosa Iconic Panel
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnOPW 10/2192 RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is 2 years starting the day that this development approval takes effect. (Refer to Section 341 "When approval lapses if development not started" of the Sustainable Planning Act 2009.) This development approval is subject to compliance with the following assessment manager conditions: 1 Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table and as amended by annotations marked in red and these conditions. 2 The proposed roof area and associated supports are to be finished with muted colours that blend with the surrounding natural landscape. 3 The deck area shall be an open structure at all times, and shall not be made enclosed with doors, windows, shutters, awnings or the like. 4 No signage shall be located on the new roof or associated supports. 5 All structures associated with the use must be constructed wholly within the approved Resource Entitlement/Lease Area. 6 Structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall or rock wall. 7 The decking must be constructed in a manner to render the underside area vermin proof. 8 Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. 9 Wastewater and sullage must only be disposed of at approved pumpout facilities. 10 The mooring facility must not be utilised for live-aboard purposes. 11 Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA) 1994 and the Environmental Protection (Water) Policy 1997. 12 The approval or conditions do not constitute a ruling on structural safety and the applicant must make their own arrangements to ensure adequacy of design and work. Also any approval granted does not warrant that such plans and specifications have been checked in detail, nor does it absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or statutory regulations in the execution and/or performance of said works. The Council and the Noosa Iconic Panel does not accept any responsibility for the accuracy of such plans and specifications as approved. 13 No construction work is to be undertaken until separate approval is granted by the Environmental Protection Agency (Coastal Management Branch) and any requirements of the Department of Transport and Main Roads and Department of Primary Industries have been met. Noosa Iconic Panel Page 2 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.