NEOLOKW:We Checklist - Applications Involving Land
ie Development & Land Use Sections
IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

41. . APPLICATION FORMS
1.4 Form 1 Part A

1.1.1 Ensure that the form is fully completed. S|

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.

 

 

 

 

1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 _ If the owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form1 Part B-O Supporting Information
4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [Y]

 

1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed. [Y
2. REFERRALINFORMATION oo 2 _, ye , Te le
2.1 Ensure that items 1-23 have been checked and/or completed with regard to ‘referrals, 4
3. ENVIRONMENTALLY RELEVANT ACTIVITIES — Se “ ‘ é

 

3.1. Ensure that Part G is completed if EPA referral is required,

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
‘4. 7 FORM 2 REQUEST TO CHANGE APPROVAL |” Mt

4.1. Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

 

 

 

 

 

 

 

§.:° PLANS ~ To UT Tae ae - ‘ae ae
§.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational S
Works) accompanies the application. In addition ensure that each set is complete.
6.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is ~
unbound.
6.7 (SUPPORTING INFORMATION “O° Tee
6.1 Ensure that at least 6 copies of any report accompanies the application 6 for Reconfiguration 1
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. |
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 6
TEE Tae

 

7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.

vw
7.2 Ensure that the fee which has been paid is recorded on the application form. a

 

 

 

 

 

 

Receiving Officer

Having completed this form and accepted the apfllication, please deliver both to the following IDAS Application Receiving

trays:-

«If the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

¢ — Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

* — Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

¢ Inall other circumstances — AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP! g:\ant\forms\application checklist.doc
Full text of the other 20 pages

Page 2

Mr Chris Grandemange
16 Mermaid Quay,
NOOSAVILLE QLD 4566

PlFey 293002

  

 

Friday, 16 June 2006

Chief Executive Officer

 

Noosa Shire Council 20 JUN 2006
PO Box 141 NOOSA SHIRE COUNCIL
Tewantin, Qld 4565 RONT COUNTER
Dear Sir,

Re: Construction of Jetties at 16 Mermaid Quay, Noosaville

Reference is made to the attached application for existing jetty structures to be approved at
the above address. The application has been lodged following a request from Council to
remove the structures from the waterway or alternately lodge an application for
consideration.

Firstly I would like to apologise for recognition packages without the necessary approval
however I did not realise that such an approval was required. Both structures were
constructed for safety and amenity reasons for the vessels that I have.

The jetty structure to the west of the existing jetty is necessary to allow for safe access around
the large boat moored at this location. When moored at this location the boat is elevated from
the water on a roller track system. It is necessary due to higher maintenance costs to have the
boat elevated from the water. Further the boat is fitted with storm covers to prevent
stormwater entering the boat when not in use. The fitting of storm covers is not possible
without having a walkway on either side of the boat. This allows for access on both sides of
the vessel when fitting the storm covers. I have personally witnessed my son severely injure
his leg trying to fit storm covers prior to the additional walkway being constructed.

It is noted that this jetty is located a minimum of 600mm from the elongated property
boundary, however, does not cross this boundary. Our vessels are never moored on the
western side of this jetty and always front the property.

The other smaller jetty structure is located discreetly behind the existing jetty for the purpose
of mooring a small tiny. This boat is also elevated from the water for maintenance reasons
and from an amenity perspective the structure prevents the tinny from slapping against the
concrete revetment wall thus creating noise for neighbouring properties. This tinny jetty has
been constructed as shown so that my children can launch the boat without difficulty and in a
safe manner. It should also be noted that the structure prevents damage to the revetment wall
from the boat constantly slapping against it.

I am aware that the structures do not comply with Council's policy however I request the
Council consider approving the application for the following reasons:

Page 1 of 2

Page 3

e The structures do not adversely impact upon the amenity of a waterway in any manner
and are no different to many other structures located within the Noosa Water's estate.

e The structures are well-made and are keeping in character with the existing jetty and
other structures within the Noosa Water's estate.

e No damage has occurred to the concrete revetment wall with both structures being
freestanding, and certified by a registered professional engineer.

© The structures are necessary for safety and maintenance purposes to ensure the vessels
are maintained in a proper manner, are assessable and easy to launch without
providing a safety hazard for the users.

e The existing jetty in its current configuration was in place at the time of purchase a
property however I have a genuine need to the structures as proposed for the reasons
described above and can see no need to alter the existing jetty.

e I don't believe the structures offend any person and do not impact upon a person
operating a vessel fronting a neighbouring property.

I request that Council look favourably on approving the structures and would welcome the
opportunity to discuss any concerns that you may have prior to a decision being made. Please
advise me if you intend for Council to refuse the application so that I can discuss the
application with my divisional Councillors.

Yours faithfully

Le

Chris G mange

Page 2 of 2

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

EormplevelopmentApplication tes

  

 

 

“ Common details —

; -

 

The completion of atl appticable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qld gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Description of land 1. Street address: faciudinghouse number, street name, suburb/locality name & posicode) {if applicable)
app
Ail land the subject of the application, must be . ;
identified, However, a descripton af the land is not ( G MERMAID Qoat t ACCS aie ce |
0 In relat i ea : —
Cane nenay Relevont Achy (ERA) 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - Q2 applies it Ll oT &
development is proposed within a water body or [ £ - t 25 KP 2450 - |
watecourse 3. Loton plan description (eg. Lot 123 on RP 4567)! GPS coordinates:
Advice for completing Q3 - Most land can be |
identified by 2 lol on plan description. These detalls
can be obtained from tille ts oF trough the ee
rales 4. The above description is for: (tick appficable box)
However, it the fand on which the development is C1 (i) the land on which the development is proposed; or
Oe ee cintaale baton [1 (ii) the land adjoining the water body or watercourse, within which the development is
watercotase} provide — proposed; or
(i) the fot on plan description lor the eae
adjoiningiadiacent tand; or (C(il) the water body or watercourse.
i) GPS coordinates where there Is no
" adoiingaacen land (eg, in Moreton Bay). 5, Shop / tenancy number: 6, Storey / level: 7. Total area of land: (m? or ha):
Advice for completing Q? - 7 does nof apply if the we Boo
development is within a water body of watercourse, = _| |
ce on Scrat ea, 8. Local government area in which the land is situated: fag. Esk, Hervey Bay, Woocoo atc) (if applicable)
Note: Areas below high water mark are not within a r Ye os
local government s area unless provided for under the A : - 7 |
Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the
Advice for completing G9 - 09 apphesil development is proposed: (eg. Port of Brisbane, Port of Townsville) {if applicable)
development ts on strategic port land or 3 strategic
port land tdat area For more details refer to Guide 11 |
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
if there is insufficient roam avaitable, details may be . 5
provided in an attachment to the application. | SX ane Stores, how se

 

Z
11. Proposed use of the land: eg. 6 unit apariment building, 30 fot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into walers etc).

 

 

Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part /, etc)
Parl A must always be accompanied by other [- Ee
completed parts of Form 1. For information about

 

when a part of Form | ray apply refer to Guide 1

 

 

 

 

Applicant details 13. Applicant's name: 15. Contact person:
Op
Clearly identity who Is making the application. The ©
applicant need of be lhe owner of the fand. hon leave Braroees Aue | Caro Clone het OF ba
When sinning and lodging this application 14. Contact number. 16. Facsimile number/e-mail address:
The applicant is respansible for ensuring the
information provided is correct. The assessment [« fo} 244 3002- | | ST ee

 

manager, any referral agency & the Chief Executive
{where applicable) wi rely on this information when | 17. Postal address: :

 

 

assessing and deciding the appiication.
ICthe applicant is a company - a contact person | te MEEK ALO QAM  JOOSNW aire |
‘must be shown 18. Signature: 19. Date:

 

10 [Cfo |

 

 

See Atache yt

 

 

 

Page 5

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

 

 

 

 

 

 

 

 

 

Land owner's consent (if anpicable) 20. Land owner's consent to the making of this application:
Section 3.2.1(3) of the IPA prescribes that an 7
appticaven must contam, or be supported by, the Name Signature Date
watien consent of the land owners, if the application
wnvolves: i
(). amatenal change of use; 0 Chivg or ne eh. wee adhe ned... +s
(@) reconfiguration of alot; ~
(il), work on land below high-water mark & not within a
canal as defined under the Coastal Protection and
Management Act 1995.0r
(iv) work on rail corrdor land defined under the
Transport fnlrastructure Act 1994,
Section 3.8.1(2){a} of the IPA provides that
lardowner's consent is not required for a mobile or
temporary ERA.
For more information refer to Guide 1.
Resource entitlement (if appicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving

Secon 3.2.4{5} of the IPA requires evidence of
fesoutce entillement be given for applications that
involve a prescribed Siate resource.

Section 3,2,1(10)(a}(ii} of the IPA prescnbes thal an
Application cannot be taken to be propery made
without evidence of the resource entitlement,
“Advice for completing Q2t & 22

Refer to schedule 10 of the integrated Planning
Regulation 1998 thal prescribes ine nature of evidence
required by the State in support of the lodging of this
development application.

Advice for completing Q23

The inlormation ir ) is mandatory if evidence is
required under Q22 {ii) or (iil) above.

The official stamp Gf the Deparment of Natural
Resources, Mines and Water is mandatory where the
application involves any waler of avenne quarry
material under the Water Act 2000

Section 3.2.1(5A) allows the resource manager to limit
the time the evidence may be used. 023 (vi) must be
completed if the evidence is time tmited.

 

22.

23.

quarry material on State coastal land under the Coastal! Protection and Management Aci 1995)?
BT NO - go to 024 (1 YES - go to 922

This application is accompanied by evidence: (tick applicable box)
oO (i) of the allocation of, or entittement to, the resource - attach evidence and go to Q23(vi)

C1 (il) the chief executive of the department administering the resource is satisfied the

development is consistent with an allocation of, or entitlement to, the resource - go
fo. 023

(1 (il) the chief executive of the department administering the resource is satisfied the

development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go to 023

Evidence of the resource entitlement:

(i) Resource entitlement / authority details (vii) Official stamp of the department
administering the resource (if
applicable)

(ii) Name of — officer

(ii) Position of delegated officer

{iv} Signature of delegated officer

 

 

 

 

 

(v) Date

(vi) _ date of evidence —

 

 

 

 

 

Assessment triggers 24. |s the IDAS Assessment Checklist completed and attached to this application?

ovate ai Dae ee poloetan one a O YES 0 NO - the assessment manager may reluse (o accept this application on the
Must be completed for alt other applications. grounds that the application has not been properly made

Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:

An application should be accompanied by detalis to
support the proposal & enable Ihe assessment
manager, referral agencies and any person viewing
the applicaton during public scrutiny or public
Notification to understand the scope of the proposal
and any potential impact

 

 

Plan / Drawing / Report Number

 

0)

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application shat, al the time of lodgement. fails to provide all applicable information required by Part A
and any other relevant part of Form 1

 

OFFICE USE ONLY (applicable fo assessment manager's)

FEE ($) DATE

Ws.

Notification ot Engagement of Private Certifier on.

 

RECEIVED

 

Reef aS OFFICERS TY 7
BO ftefere  nanes {I

    
 

 

“REFERENCE”
al NUMBERS _,

 

Counc } have been engaged as the private cerifer for the burlding work referred te m this apphcation

a Name. _. Signature. 2 See

 

Page 6

INTEGRATED PLANNING ACT 1997

 

7)
pa

Part A, Version 2.2, 25 Juty 2005

Development Applicatio A
5

 

RECEIVED Ye

 

 

 

The completion of all appticable questions on Part A is mandatory far all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more Information on the parts of the Form refer to www.ipa.qid.gov.au.
Any information requested in the form may be provided in an attachment to the application. For further information about compieting the following details, refer to Guide 1.

Description. of land

\ Allland the subject of the application, must be
identified. However, a description of the fand is not
required in relation to a mobile or temporary

1.

 

Street address: fncludinghouse number, street name, suburbViocality name & postcode) {if applicable)

WILLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  

 

 

 

 

 

 

 

 

Environmentally Relevant Acthity (ERA). 2. Name of water body or watercourse, within which the development is proposed: (if applicable)
Advice for completing Q2 - 02 applies if
development is proposed within a water body or | — -
watecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567)! GPS coordinates:
Advice for completing Q3 - Most land can be
ied by alton plan despa. These deals [fo4 (25 RP ¥g@ziso |
tit ’
een Nedocunentsortioushite 14 The above description is for: (tick applicable box}
However, if the land on which the development is (1 @ the land on which the development is proposed; or
have a lot on plan description (i.e.
Me coateonette prscced navater baton fe oO (ii) the land adjoining the water body or watercourse, within which the development is
watercourse) provide - proposed; or
{i} the lot on plan description for the re
; axingecent de C1 (ili) the water body or watercourse.
® Srna and (eg. in Moreton Bay). §. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? of ha):
Advice for completing Q7 - Q7 does not apply if the — oa
development is within a water body or watercourse. | OD fi € | | & 0 o |
Advice for completing QB - 08 applies if aaa ii ‘ te cj . cs .,
development is within 9 local government area. 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo ele.) (it applicable)
Note: Areas below high water mark are not within a A
focal government's area unless provided for under the | Mi Q 9 3 f ~ ~ ;
Local Goverment Act 1993. _ 9. Port authority for the strategic port land or strategic port land tidal area on which the
aes for completing 2e nat Pra a skategic development is proposed (eg. Port of Brisbane, Port of Townsville) (if applicable)
porttand fidal area, For more details refer to Guide 14
Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc}
if there is insufficient room available, details may be
provided in an attachment to the application. [ Si no Io Storey house . |
+14. Proposed’ usé-é the land: feg. 6 unit 2partment building, 30 fot residential subdivision, ERA for aquacutture in
ponds 1 wilh a tolal area of 7 ha for which-wastes are released into waters etc). . .

ee | Kos idlance. |
Other applicable parts of Form 4 12. Other parts of Form 1 completed.as part of this application: (eg. Part D, Part J, etc) .
Part A'must giwayg be accompanied by other
completed parts of Form 1: For information about |
when apart of Form 1 may apply reter to Guide 1. . ;
Applicant details 13. Wecc name:  45.. Contact persgn:
Clearly identify who is making the appfcation. The
spplicant need no! be te owmer of fe lad. vicoEeR WChuis_licinideetrese |
When sidning and lodging this application 14, cent number. 16. Facsimile number/e-mail addie:
‘The applicant is resporisiblé for ensuring the
intonation: provided is correct: The assessment o7 (or) SE2¢9712 | ?

i ‘ay referral agency & the Chief Executive
{ietione Pes rely. oh this information when | 17. (Dur 29% 02 ___ address:
assesain and deciding the applic
is dbacantis come | Ue Ine Ria Aap avAy  Mwos4 wares ERG)
mmustbg shown, = 18, Signature. , 49. Date

fo - Lt

 

 

 

 

FP

Page 7

INTEGRATED PLANNING ACT 1997

Land owner's consent (ifapplicabie)
Seétion 9.2/4( 10} ofthe IPA presetibgs tal an

  
  

  
  

8 land oymer's consent eae

‘Must be supported byt the consent é
‘Mand ‘over if the application involves:

{) a material change of use;

(il) Teconfiguration of a lot;

(i) work.on land below high-water mark & not within
@ canal as defined under the Coastal Protection
‘and Management Act 1995;0r

work on rait corridor land defined under the
Trinsport infrastructure Act 1994.

For a mobile or temporary ERA - landowner's
consent is lof required.

(Ww)

20.. and owner's consent-to the makirig of this application:

Part A, Version 2.2, 25 July 2005

 

Z Signature

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For more information rater to Guide 1.
Sena toa (anpkeate) 21. Does this application involve taking or interfering with (other than interfering with quamry material on State
application ante er ee coastal fand under the Coastal Protection and Management Act 1996) a State resource?
withdut evidence of the resource entitlement BENO - g0 to 024 . LIYES - goto. 022
Fee Een Aol oan anne 22. This application is required by regulation to be accompanied by evidence: (tick applicable box)
lal prescnoes: nature of evidence rn 1 1
required by the Sian support of the lodging of this (1 (i) of the allocation of, of entitlement to, the resource ~ attach evidence
development appicaton, L (ii) the chief executive of the department administering the resource is satisfied the development is
consistent with an allocation of, or entitlement to, the resource ~ go to Q23
D7 iil) the chief executive of the department administering the resource is satisfied the development
application may proceed In the absence of an allocation of, or entitlement to, the resource -
go to Q23
Advice tor completing 023 _____ | 23. Evidence of the resource entitlement:
Tho efomatonin()-W ismandatny evidence ® |) Resource entitlement /authorty details (v) Official stamp of the department @
‘The offical stamp of the Department of Natural administering the resource (if
Resources and Mines is mandatory where the a applicable)
application involves taking oF interfering with water or (i) Name of delegated officer
eee an eestor Cd
(iii) Position of — officer
(iv) Signature of delegated officer
(v) Date
Assessment triggers. | 24, Is the IDAS Assessment | Checklist completed and attached to this application?

This checklist does not apply if the apptication requires
the completion of Parts A and Bof the Form gnly. St
must be comipleted (or all other applications.

oO YES

a NO - the assessment manager may refuse fo accept this application on the
grounds that the application has not been properly made

 

 
 
 
    

‘not ication to understand tha scope of the proposal
and-any potential impact.

 

aris/drawings/raports accompanying this application:

 

Plan { Drawing / Report Number

Date

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the lime of todgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager's
10,

 

 

 
 

  

H SEEMS oe SY

[fe ‘REFERENCE,
SRUMBERIS “

 

To.

 

Dateofengagement { |

 

Accreditation Number.

_— Name.

Notification of Engagement of Private Certifier (Optional format)
- Council. | have been engaged as the private certifier for the building work referred to in this application.

Signature:

 

 

Page 8

INTEGRATED PLANNING ACT 1997
Se Soe

evista P Ls efit

V
ee

       

    
  
  

       
 

      
  

 

Operational &/or building work

assessable against a local government's planning scheme

 

Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
nol involve assessment of a material change of use of premises at the same time) assessable against a local govemment's planning scheme.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nature of the application 4. This application is for (tick one (1) or both if applicable)
A development permil authorises Preliminary approval - provide details of the type of work eg. roadwork, stormwater, waler and sewerage
development to occur, while a preliminary oO rare, app " typ 9 " we in 9
approval is a step in the approval process -
and does not authorise development to occur. . ¢ }
The types of work that are assessable agains! “ v
a planning scheme are determined by the
scheme for a particular focal government and
will vary across the State.
To determine the types of work that are
assessable under a particular planning
scheme, contacl the relevant local
government.
AND / .
Development permit - provide details of the type of work eg. ‘roadwork, stormwater, water and sewerage
infrdstructure, etc “ :
Jo tas as Shown on
CHochedl lord,
2. Are the works subsequent to a previous development approval?
Cno YES - provide details of all previous approvals (eg. file references)
3. _ 1s the subdivision for a canal estate?
[JNO
(yes
Portable Long Service Leave levy if |4. {s payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
, applicable) . | (71 YES - complete Q5
Prior to issuing a development permit for the
works, the assessment manager is required (J NO - 05, 6 & 7 do not apply

 

Page 9

(INTEGRATED PLANNING ACT 1997 Parl €, Version 2.0, 4 October 2004

by law lo ‘sight’ an approved form, issued by 15, Has the PLSL levy been paid?
Qleave, which signifies that the PLSL levy
has been paid. (71 YES - completes
| NO - the applicable levy must be paid before a development permit can be given for the works

6. How much was paid?
| _]

7. Whatis the receipt number of the payment?

L. |

PLEASE NOTE

This application cannot be accepted unless accompanied by Part A of Form t.

The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.

 

 

 

 

OFFICE USE ONLY (applicable to assessment manager)
[ DATE RECEIVED | | REFERENCE NUMBERIS ! |
io Is a PLSL levy applicable in this instance? CINo (YES - compiote a(i)

 

~ manager’ private certifier at the time of lodgement of this application? Ono [YES - provide receipt details below

4

(ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment \. @

Page 10

INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 15.0, 18 November 2005

  

DD Silents
IDAS Assessment
Checklist

{Formerly the “Referrals Checklist”)

   

 

IMPORTANT NOTE FOR ALL APPLICANTS: .
1. This checklist was formerly referred to as the ‘Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. —- Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Mines, Queensland Heritage Council etc.).
This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may'also assist the applicant to
determine the assessment manager’ for the application,
‘Therefore, the completion of all questions in section 1 of this checiist is mandatary for all applications (ether then those requiring the completion of Pets A &B oni.
[tis the responsibility of the applicant to accurately complete this checiist.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
‘The assessment manager for the application will rely on the infarmation provided in this checkist (as well as any material lodged in suppart af the application) to identify
any applicable referral agencies for the appiication in the Ackrewledgement Notice. The assessment manager will also rely an this information when identifying if the:
. application tiggers referral coordination’. ‘
8. Toascist you in answering the falloning questions a series of guides are available free fram vwwww.ipa.qid.gov.au.
9, — Anyother parts of Form 1 that this checidist requires to be completed are available from the Council or the appiicable State entity, ar can be downloaded free from
. www. ipa.qid.qov.au.
10. Section 2 provides advice about the referrals that can be required for applications for building work assessable against the Standard Building Regutation 1993 (SBR).
ae i Te eee eee re ee

SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Standard Building Regulatian 1993 (SBR).
Environmentally relevant activity 4. The application involves: (tick applicable baw/es)

bad

NOS

Forme iran ocnve .(@_ anenvironmentally relevant activity (ERA) for which a code for environmental compliance
io Qh,

oerctin rains ootcccrert tte has not been made - corplete Part Gf Fmt

‘diinistering authority’. (1 (i): a mobile or temporary ERA for which a code of environmental compliance has not been
Wan erty, fe an th acdrrterng ator Made - complete Pat Gof Fam 1

adrriristering authority is a concurrence agency for (iii) none of the above

the application in relation to this matter,

‘Note: An application invatving ERA 19 and/or 20 will
also require completion of Part K; of Form 1 for
@pproval where an allocation under the Water Act

 

2000 is recuared

State-controlled road matters 2. The application involves: (tick agpiicatle bawes)

Chex yu arenes hare heb core} L100) development on land contiguous to a State controlled road and for -
application triggers referral to the Department of LO (a) material change of use assessable against the planning scheme;

Main Roads (DMR) as a referral agency.

In coertain cirasrretanoes DVR will be an advice LD (b) reconfiguring a fot uniess -
agency, while in cther circumstances OMR will be a + the total number of lots is not increased; and

2f he[P Rectalon val asic youto + thetota number of lots abutting the State-controlled road is not increased;
eterrrine where DIVR is an advice or concurrence C1 © operational work (not associated with a material change of use assessable against the
‘agency for the application - plamning scheme or reconfiguring a fot mentioned in (b) above)?

¢ assodated with acoess to a State-controlled road; or

for filling or excavation; or

* involving the redirection or intensification of site stormwater fram the land, through a
pipe with a cross-sectional area greater than 625 cn? that directs starmmater to a
State-controlled road.

 

1 ‘The assessment manager is responsible for assessing and deciding an IDAS application The assessment manager for an application is prescribed in schedule 8A of the IPA,

For additional information refer to Guide 6 Does my anplicetion tigger the referral coordination process??

3. The Ddrriristering authority?may be either the Envronmental Protection Agency, the relevant local government (or a devolved ERA) or the Queensiand Department of Primery Industries and
Fisherles (for a delegated ERA),

4 Land contiguous to a State-controlled road |s defined in schedule 14 of the IP Roguiation to mean land - ~ ptf hoa iti tle Stor rot thet prt oa te Sto
controlled road.

icy

Page 1

Page 11

INTEGRATED PLANNING ACT 1997
’State-controlled road matters (cont) ~

” Clearing vegetation

« For more inforration refer to Guide 12,

* Urtess you anewered “hone of the above?to QB, the
application requires assessment by the Department
» lNatural Resoures and Mines (NBM). ”

If an agency other than NR&M is the assessment

‘manager far the application, NR&Mis a concurrence
‘agency for the application in relation to this matter,

IDAS Assessment Cheddist, Version 15.0, 18 November 2005
DL @ii) development on land not contiguous to a State-controlled road and -
C1 (@) material change of use?
«assessable against the locel government’ planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedue;
(Cl (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule; .
[1 (©) operational work (not associated with a material change of use assessable against the
Plaming scheme or reconfiguring a lot mentioned in (b) above)?
¢ assessable against the local govemment’é planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
none of the above _

The application involves: (ick epcae bavts)
(C1) material change of use?
(a) assessable against the planning scheme;
{b) onalot containing?
« acategory 4, 2 or 3 area shown on a property map of assessable vegetation, or
+ if thereis no property map of assessable vegetation for the lot - remnant vegetation;
(c) here the existing use of the land is a rural or environmental use; and e@
(d)_ where the size of the land is 2 hectares or larger - capiete Pat Jaf Fam
OO (ii) reconfiguring a lot?
(a) ‘onalot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size ofthe lot before the reconfiguration is 2 hectares or larger,
(c) where 2 or more lots are created; and
(d) where the size of any lot créated is 25 hectares or smaller - conplete Pat Jaf Fam 1
Odili) operational work -
(a) _ for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in () or reconfiguring a lot mentioned in (i) - ~ complete Pat Jof

[UF rowthe be

  

 

 

Strategic port land

For more inforretion refer to Guige 11.

Kyou ticked (1) - the relevant Port Authority is the
assessment manager for the application.

If you ticked (i) Queenstand Transport is a
conourrence agency for the application.

The application involves:

, OW developrent on strategic port land as defined in the Transport Infrastructure Act 1994 (11

Act) - complete Pat laf Fam 1

(CO (i) a material change of use that is inconsistent with the land use plan approved under the e@
Tl Act for the strategic port land - carplete Pat lof Fam 1

1 (ili) none of the above

 

Acid sulfate soils

For more information refer to Guide 10,

Unless you answered ‘hone of the above?te 06, the
application requires assessment by Department of
Natural Resouross and Mines (NR&M).

Hf an agency other than NR&Mis the assesamert
manager for tha application, NR&Mis an advice
agency for the appiication in relation to this matter.

 

‘The application involves development on land situated in an identified? local government area

. and where the surface of the landis: (tia anniicable bay

(1 (i): below 20m AHDS and the developrrent will involve the excavation of 1000n or more of
soil or sediment at or below Sm AHD, or
(1 di) at or below Sm AHD and the development will involve filling the site with 100018 or more
material
(ili) none of the above

 

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook.
Cooloola, Qounglas, Fitzroy, Be eae Ga8 Goossen Bay Hinchinbrook, Isis, Johnstone, Uvingstone, Logan, Mackay, Maroochy, Maryborough, Mriurn Vala, Mornington, Noosa, Pine Rivers,
Reddiffa, Rediand, Rockhampton, Sarina, Thuringowa, Tao, Torres, Townsville, Whitsunday.

6 Austraion Height Datum (AHD).

Page2

““

Page 12

INTEGRATED PLANNING ACT 4997
Major hazard facilities or possible
major hazard facitities
For mers information refer to Guid ie 17.
Ifyou arionéred 2YESMti C8, the appiication
requires assesament by the Department of
Emergency Services (DES). ‘
If an agency other than CES is the assessrert
._ [anager for the application, DES is a concurrence
agency for the application in relation to this matter.

Water related development under the

“+ Water Act 2000

For more information about items (a)? (d), refer to
. Guide 15. For more information about item (2),
refer to Guide 14 Does my anglican inove

j assessrent farcferatiedan?

4 Uniess you answered “hone of the above?to Q7, the]
@paiication requires assessment by the Departmert
of Naturt Resources and Mines (NR&M).

” fan agency other than NR&M is the assessment

+ Tanager for the application, NR&Mis a concuence
agency for the application in relation to this matter.

 

7. “The pplication imovex

IDAS Assessment Qhed¥ist, Version 15.0, 18 Noverrber 2005.

6. Does the application involve a material change of use for a major hazard facility.or possible

FN LN
(2) YES- complete Pat L of Farm 1

(110) operational work, for taking or interfering with weter under the Vidter Act 2000, that is:

(tick applicable bawes)

(1) inawatercourse, lake or spring, or froma dam constructed on a watercourse (eg
apump, ganity diversion, streanre-cirecion, weir or dary} - corpiele Pert Ke, Ky, Ke, Ke, or Ke of
Form 1 whichever is applicable;

Oo) for an artesian bore anywhere in the State, no rratter what the use - carplete Pat
Ks of Fam 1;

(2 © fora subartesian bore, in declared groundwater area’, for use for purposes other *
than stock and/or domestic use - aaplete Pat K: of Fam 1;

Od for a subartesion bore, in certain dectered groundnater area, for use for stock
and/or domestic purposes - canplete Part K: of Form 1;

Oe for constructing a referable darr? or thet will increase the storage capacity of a
referable dam by more than 10% - complete Pat Ks of Fam 7; oF

oh for takang or interfering with overtand flow water - complete Parts Ke and Gof Form 1
Gi) none of the above. oo.

 

‘Removal of quarry material from a
tWatercourse |

» For rmere information refer to Guide 16.

If you answered 27ES7to OB, the apptication
regu asescrrort bythe Denese of Naural

. Haan cer tev ana dxesoert
Tanager for the application, NR&M Is a concurrenca|
agency for the appiication in relation to this matter.
Note: Port Gof Form 1 is required to be completed
as the activity of rormoving quarry material froma
Watercourse is also an Envrormentaly Refevert
Activity (ERA).

Operational works in a tidal area or
coastal management district

For more information refer to Guide 18, For more
information about prescribed tidal work in local
goverment tidal areas refer to Guide 24.

(Unless you answered ‘hone of the above?to OS, the
application requires assessmert by the
Environmental Protection Agency (EPA),

If an agency other than EPA is the assessment
trarager for the application, EPA is a concurrence
agency for the application in relation to this matter.
Local government is the assessment manager for alt
prescribed tidal work.

 

8. Does the applica intve develprrent fo the revel of query retell fora watercourse?

ae notice under the Water Act 2000?

(C1 YES - campiste Pats Ke and Gof Form 1

9, The application involves operational work that is: (tick the applicable bawes)

L(i) _ tidal work’? as defined under the Coastal Protection and Managernent Act 1995 (the
Coastal Act) that is not prescribed tidal work ? complete Pat Mof Form 1; or
((ii)_ tidal werk that is prescribed tidal work" other than in a canal’? -canplete Part Pof Fam 1; oF

oO (iii) cartied out within a coastal management district under the Coastal Act and for complete
Part Mof Form 1 if any box/es (a) to (i) below ere tie

C1 (a) constructing or installing works in a Watercourse between MHS and HAT (Le
other than those works in fidal water) Where the development has been detenrined not
to be assessable against the Water Act 2000; ~

CJ (6) constructing a canal’? intended to be connected to tidal waters;

(1 © constructing an atificial waterway:

1) @)_ reclaiming land under tidal water,

(1) disposing of dredge spoil or other solid waste rnaterial in tidal water,

C1 (f__ interfering with quary material on State coastal land above high-water mari

(1 @)_ draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark,

1 (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water martc

Oo constructing a bark or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

Flv) none of the above.

 

7 The declared ground water areas are listed In Guide 13 Development in a declared catchment area.

8 Referable dam is defined under the Wéter Act 2000.

9 Watercourse Is defined in sch 10 of the IPA.
10. Tidal work is defined in sch 10 of the IPA

t Presatbed tidal work Is defined inthe Coastal Protection and Management Reg.fation 2003 and includes certain tidal works completely or perty witin a local goverrrrent tial area,
12 Canal mreans canal as defined under the Coastal Protection and Management Act 1995

Page 3

Page 13

INTEGRATED PLANNING ACT 1997

Operational work below high water
mark

For more information refer to Guide 18. For more
informetion about prescribed tidal work in local
gpvemment tidal areas refer to Guide 24.

Unless you answered ‘hone of the above?to O10,
the application triggess referral to Qeenstang
Transport (ON (Mantime Safety Od) as a
‘concurrence agency.

Local goverment the ascossmert manager for ct
prescribed tidal work, a

JOAS Assessment Checitist, Version 15.0, 18 Noverrber 2005,
The application involves operational work that is: (ick the eppiicable bawes)
(1 @) tidal work’? as defined under the Coastal Protection and Managernant Act 1995 (the
Coastal Act) that is not prescribed tidal work ? compete Pixt Mof Fam 1; or .
27 di) tidal work that is prescribed tidal work - complete Pat Pof Fam; or
C1 (ii) canied out within a coastal management district" under the Coastal Act and for -
[1 @) disposing of dredge spoil or other solid waste material in tidal water ? complete Pat
Mof Fam, .
(1) (®) redairving land under tidal water ? canpiete Past Maf Form; oF
Do constructing a canal’®, if the canal is associated with reconfiguring a lot ? complete
Pat Mol Form ty
(iv) none of the above.

 

Coastal management

For more information refer to Guide 13.

Unless you answered ‘hone of the above?to O11,

the apptication requires assessment by the

Environmental Protection Agency (EPA).

Hf an agency other than EPA is the assessmert

Manager for the application, EPA is a concurrence
| agency for the application in relation to this matter.

 

11.

The application involves: (ick te epatcabie howe)
(1 (i) amaterial change of use assessable under a planning scheme involving operational
: work canied out completely or partly in a coastal management district
(Gi) a material change of use assessable under a planning scheme invalving building
work, caried out completely or partly in a coastal management district that is ?
« the construction of a new prerises with a GFA" of at least 10000?
« the elagement of the GFAcf existing premises by more than 1000n?
D (il) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
Ow iguring a lot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal'® ? complete Pat Mof Fam
(v) ‘none of the above

 

Development within the limits of a
port

; Pormaore information refer to Guide 48. For
infarrretion about prescribed tidal work refer to
Guide 24.

” If you answered ?7ES7to O12, the application
‘trhagers referral to the Pod Authority.

” The Pott Authority is a concurrence agency if the
development is ?
@ -within 200m of a shipping channel or an entry
and exit shipping corridor for the port

© within 1000m of a saing hasin, a commercial

‘shipping wharf, a mooring, anchorage or spol ~ |

* gfounds;
© within 1000m of a planned port facility identified
ina land use plan approved under the Transpat
Infrastructure Act 1964.

(nail other situation the Port Authority is an advioe
agency.

12.

Does the application involve developrent below Figh water vrei? andwithin the lints of pat
mo Transport Infrastructure Act 1994?

NO .
[7 YES ? complete Pat Mat Form 1, or Pat Pot Fam if the work is presaribed tidal work

 

 

Marinas

For mare information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local goverment
is the assessment manager for all prescribed tidat
work,

If you answered ?YES7io Q13, the application
triggers referral to Queensiand Fire ang Resoug
‘Service as an advice agerty.

Tidal works in strategic port land tidal
areas

For more information refer to Guide 18.

Unless you answered NO?to O14, the relevant Port
Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA} and Queensland Transport (Cn) are
eonaurrence agencies for the application.

13 ‘Tidal work is defined in sch 10 of the IPA

14 Prescribed tidal work is defined in the Coastal Protection and Management Reguation 2003 and includes certain tidal works completely or partly within a local

 

13.

a
vessel, 3? ,

O YES - complete Pat Mof Form 1, or Patt Pof Fam 1 if the tidal work is prescribed tidal work

Dees appcaion involve tidal works within a strategic port land tidal area?t?

(DYES - complete Pat Mat Fam

tidal area.

18 Coastal raragerent cst is defined in sch 10 of the IPA and means a cnastal renagement dst under the Coastal Protection and Maregernent Ad 1996, ches than an area declared 3s a
Ouastal management distict under section 47(2) of that Act.

16 Canal means cene# as defined under the Coastal Protection and Management Act 1995

17 GFAis defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calodaled GFA, go to the planning scheme against which the application is being assessed.

18 Under 5117 of the Coastal Arotection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must ba
accompanied by the application for the operational works to construct the artifidd watenmey.

19 High water mark is defined in the Qoastal Protection and Managerrent Act 1995 and means the ordinary high water mark af spring tide.

20 Mazina is defined in the Transport Qherations (Maritime Pollution) Regulation 1996

Page4

Page 14

INTEGRATED PLANNING ACT 1997
Heritage

For further information refer to Guide 19.

If you arswered PYES2to O15, the application

Declared catchment areas .
For more information; inctuding a list of the dedared
caichrrent areas within Queensiand, refer to Guide
‘Unless you answered “hone of the above?to O16,
the application requires assessment by the
Department of Neural Resourves and Mines

“(NREM).

+ [Ran agency other than NR&Mis the assessment

lmarager for the application, NR&Mis a concurrence
agency for the aaptication in relation to this matter.
Contaminated land

Applications involving meterlal change of use and /
oF reconfiguring a lot rmay trigger this referral.

+ For more information refer to Guide 5.
Unless you answered ‘hone of the above?to O17,
the application requires assessment by the
Eawironrenta Protection Agency (EPA). fan

{ 29ency Gther than EPA is tha assessment manager
for the application, EPA will be a concurrence:
agency for the application in relation to this raiter.

Electricity infrastructure

For more information refer to schedule 2of the IP
Requtation,

Unless you ansered ‘hone of the above7to Q18,
the application tiggers referral to the agency to
which the easerrent is granted io favour of as adkice|
agency.

16. The application is in an area dadared to be a catchrrert area under the Viater Act 2000 and

 

IDAS Assessrrent Checklist, Version 15.0, 18 Noverrber 2005
ication involve development in a heritage registered place as defined under the
id Heritage Act 1992?

15. Does the

— CLYES ?eorpte Pat Corre

involves: (lick the applicable bores)
OQ reconfiguring a Iot, if any lot resulting from the reconfiguration is less than 16 hectares,
(1 (i) development assessable against the planning scheme involving the establishment or

Jon of a waste water disposal system, other than a disposal system for carrying
meg anni eer hye nr Pt 1994,
fli} none of the above .

we nee
17. The application involves cx he appticattebaves)
(1) (i) reconfiguring a lot for which all of part of the prerrises are ?
(2) premises mentioned in the IPA, schedue 8, part 1, table 2?
« item5, induding the exemption otherwise provided for by paragraph (d);
« item6, inducing the exemption othenise provided for by paragraph (e); or
« iten7, induding the exemption otherwise provided for a mining activity or petroteun
adivity; or
(b) inn area for wich an area management advice has been given for unexploded
ordnance - complete Part Nof Fon 1
(i) ameterial change of use?
(a) made assessable under the iPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the prerrises is in an area
oes a aca Pore ance hes been Gen for unexploded ordnance -
conplete Pat Nof Foam
iii) none of the above la. .
18. The application involves: (tick the applicable baves)
(0 @ reconfiguring a lot where any part of the lat is ?
» exhjedto an easement in favour ofa distribution ent or trenerssion ently under the
Gedticity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

+ situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if ?

* any pat of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Gectricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement,

a material change of use, assessable against a planning scherre and not assotiated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site;

operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if ?

« any pat of the prerrises is subject to an easement in favor of a distribution entity or
transrrission entity under the Electricity Act 1994 and the work is located wholly or partly in

the work is located wholly or partly within 10m of a substation site;
(v) none of the above. ;

a pee mont

Odi

Dai

Ow

 

 

21 ‘Sretegic port land tidal areas are the areas generally SD metres seaword of high weer merk adlacent to streteges pat land.

Page5

Page 15

INTEGRATED PLANNING ACT 1997,

Land designated for community
infrastructure.

designated for corrnunity infrastructure may trigger
his referral.

+ For more information refer to schedule 2 of the JP
Regulation.

__ Ifyou answered ES? O19, the application

+ requires assessment by the chief exentive of the
., Sepatirent administering the Ad authorising the
development for the designated purpose.

fan agency other than the designator is the
assessment manager for the application, the -

; designating agency wif be a concurrence agency for
3 the application in relation to this meter.

SEQ Regional Ptan

For more information refer to schedule 2 of the IP
Regulation.

Unies you answered “hone of tha above?to 20,

* the application requires assessment by the Office of
* Urban Management (QUM),

y

Fisheries matters .
For more information refer to schedue 2of the IP.
“Regulation.

Unless you answered “hone of the above?to C21,
the agpcaton reiresasseserert by he

 

Hf an agency other than DPI8F is the assessment

Manager for the application, DPISF is a concurrence
for the application in relation to items (i) 2

(iv) and an advice agenny in relation to iter (v).

___ CA(iv) assessable qperational work that Is the removal, destruction or damage of arrerine

IDAS Assessrrent Chackist, Version 16.0, 18 Noverrber 2005
19. Does the application involve developnent assessable against the planning scheme and on land
designated for community infrastructure?
{i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iil). other than development ?
(a) _ for the designated purpose; or

gly miatat ne ontha ct, cosets

Ol yes

20. “The application involves a material change of use of prerises in the SEQ Region? for (lick the
applicable bawes)

(1 () urban activities, other than where the prerrises are zoned for urban activities under a
Planning scheme in a rural village** or the Mt Lindesay/North Beaudesert Study Area, for
which all or part of the prerrises, the subject of the development, isinthe?

(a) Regional Landscape and Rural Production Area;
(b) Rural Living Area;

(©) Investigation Area; or

(d) Mi Lindesay(North Beaudesert Investigation Area.

C (ii) rural residential purposes”= where the premises are not zoned for rural residential
purposes and the prerrises are in the ?

(a) Regional Landscape and Rural Production Area;
(b) Investigation Area; or
Mt Lindesay/North Beaudesert Investigation Area;

21. The application involves: (tick the anplicable baves)
CI (i) anassessable material change of use for aquaculture - carplete Pat O; of Form 1;
(CO (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Q; of Form 1;
C7 (ili) assessable operational work completely or partly within a declared fish habitat area-
complete Pert Qy of Farm 1;

plant - canplete Pat O; af Form 1;

Ow opment assessable under the IPA, schedule 8, part 1, on land that adjoins a
. jared fish habitat area’

 

(i) none of the above,

 

22 Local Governments wathin the SEQ Region are identified in the South East Quaenstand Regional Plan as Beaudesert Stire, Boonah Shire, Brisbane City, Cabootture Shire, Caounda Oty, Esk Shira,
Gatton Shire, Gold Qoast Oty, lpswich Cy, Kooy Shire, Laidley Shire, Logan City, Maroochy Stira, Noosa Shire, Pine Rivers Stire, Reddiffe City, Redand Shire and Toowoorrba City.

23 Urban acthity means urban activity as defined in schedule 2, Part H Regulatory Provisors, South East Queensiand Regional Pan. The term Includes sams facilities and purposes and excludes soma
‘Purposes. A single residential dwelling on a lot is not induded In urban activity.

24 Rural vilage means rural vilage 2s defined in schedule 2, Part H

‘Provisions, South East Queensland Regional Plan.

a Rural residential purpose means rural residertial purpose as defined in schedule 2, Past H Reguatory Prenisions, South East Queenetand Regored Plan

Pages

Page 16

IDAS Assessment Checklist, Version 15:0, 18 Noverrber 2005 ,

 

INTEGRATED PLANNING ACT 1997
Integration of land use and public 22. The application involves: (tick the appiicatie bates}?
transport ~

Fer me irfonation refer to Guide 23, soherkde 24
+ ofthe IPA, & schedule 2 of the IP Regulation.

» Unless you anasered ‘hone ofthe above? the
application triggers referral te CIT as. a concurrence:
agency.

CO (i) a material change of use assessable against the planning scheme for a purpose
‘mentioned in schedule 13C of the IP Reguiation and exceeding the thresholds set by that
schedue.
C1 (ii) reconfiguring a tot?
Dw on land thatis completely or petly within a public transport corridor, andthe
total number of lots increases;
Ob) cn land that is completely or partly within a future public transpert corridor or
an airport's public safety area;
(C1 (©)  onland that is within 400m of a public passenger transport facility or a future,
public passenger transport facility, and the total site area is 5000: or greater,
(@) _ for aresidentia purpose within the 25 ANEF contour for an airport; .
Ge) _ for aresidential purpose resulting in 100 or more allotments.
C1 (ili) operational work assessable against the planning scheme, but not associated with a
meterial change of use mentioned in (i) above or reconfiguring a fot mentioned in (ii)

, above, on land that? -
| Oe iscerpeely or partly witin a pubic ransport card or a fit pbc
transport corridor,
(b) will result in work that encroaches into an airport's operational airspace.
| wee Honore ofthe above. cpg ty

 

: Railway safety and efficiency

For move Information refer to Guide 23, schedule 8A,
‘ofthe PA & schedule 2 of the (Regulation, 4
+ Unies you angered hone of the above the
application triggers referral to CT as a concurrence
Jogeny, Te

23. “The application involves {tick the applicable bav/es)? ,
C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedue, °
0 (ii) recontiguring a lot?

O(a) onland thet is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easernent;

(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Cltytrain passenger railway station, and the total site area is 5000? or
greater,

Oo on land that abuts rail corridor land, conrmercial corridor land or future railway
land, and the total nurrber of lots increases;

Cd) onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

LI (e)  onland that is completely or partty within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

LC (f) for aresidentia purpose resulting in 100 or more allotments.

D (ili) operational work assessable against the planning scherre, but not associated with a
traterial change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than SOrré, on land that’?

[1 (a) _ is completety or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
C1 (b) is corrpletely or partly within future railway land, or a railway tunnel easement;
(c) abuts rail corridor land, commercial corridor land or future railway land, and

ha the work is within 25m of the railway boundary.
iv) none of the above. .

 

Referrat coordination
if the applicalian involves ?
() 3.or more concurrence agencies; or
(ii) a facility or area assessable under a
Planning scheme and prescribed in
‘schedule? or 8 of the IP Requlation; or
(il) development which is subject to an
. application for preliminary approval
mentioned in s3.1.6 of the IPA.
For more infomation go to Guide2 and Guide 6,

 

24. Dose ye keain trigger referral coordination?

(1 YES, as the application: (tick the anpiicable baves)

(Qi) _ triggers 3 or more concurrence agencies;
Ow involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation, -
. Ci) involves a material change of use (other than a dwelling house, outbuilding
, or farm building) made assessable under a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Reguatior,
Ow istora prelirrinary approval mentioned in $3.1.6 of the IPA

 

Page?

Page 17

INTEGRATED PLANNING ACT 1997,
‘Referral agency responses priorto | 25,
‘lodgement *

Under 83.3.2 of IPA.a referral agency may give a
2 seferral agency response on a matier within its

+ jurisdiction abou a proposal before an application
for the proposal is made to the assessment
manager,

This is commonly the case where an application ©
requires referral to a building referral agency (eg
id Fre end Fos Sovien)._

 

IDAS Assessment Checiist, Version 15.0, 18 Noverrber 2005

Oid a referral agency give a referral agency response under $3.3.2 of the IPA before the
applicali mace to the assessrnert manager?

(DYES - atanh a copy at the referral agency's responses

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of !odgement, falls to provide the
completed IDAS Assessment Checklist (if applicable).

EE eae mE

"DATE RECEIVED

| REFERENCE NUMBERS ™]

Pages

Page 18

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 1.0, 48 Noverrber 2005

 

SECTION 2 ? BUILDING REFERRALS (completion not mandatory)

Note: Belowis alist of the referra’s that can apply to an appfication for bulking work assessable against the Standard Bulking Reguiation 1993 (SBR). Tris section of the
IDAS Assessment Checklist is provided for advice only. Tris setiondf the IDAS Assessrrent Checks is not required to be corrpieted and lodged with an
@ppication for building work assessable against the SBR only.

 

Fire safety -
For more irforpation goto schedule ofthe
Regulation

1.

An application may tigger referral to Cid Fire and Resoue Services as an advice agency if the
building work the subject of the application requires the installation of a fire safety system.

 

 

 

 

 

Fire safety for budget accommodation 2. An application may tigger referral to Qid Fire and Rescue Services as an advice agency if the
Fema emmeien pio steals 2 Atal . building work the subject of the application requires the installation of a fire safety system for a
budget accommodation building.
Spray painting : 13. An application may trigger referral to the Department of Industrial Relations (OR) asa
Reneohteraiongotomiwade 20 concurrence agency if the application involves a workplace incorporating spray painting.
Retail meat premises * 14. Anapplication mey trigger referral to Safe Food Cid as a concurrence agency if the application
Information go to schedule 2 ‘of the 1P
Roma ee iP involves a retail meat prerrises.
Private health factlities dette 5. Anappiication ay gga fade Dept of Peat as acancaence aenoy ifthe
more Information go to schedule 1
Notion me 0 application involves a private health facility.
Workplace area less than 2.3m? - 6. An application may trigger referral to the Department of Industrial Relations (DIR) as anadvice
f Fezmureremton goto ahedde chee agency if thie application involves a work place area less that 2.3nf.

 

Land contiguous toa State-controlted
road

Fo ree nformetion goto sthede 2c thee ‘
Reaulation :

7.

An application may trigger referrd to the Department of Mein Roads as a concurrence agency or
advice agency if the application involves land contiguous to a State-contralled road.

 

Pastoral workers. accommodation :

An application may trigger referral to the Department of Industrial Relations (DIR) as a

 

 

 

 

 

 

 

For more information go to schedule 2 of the !P.
Regulation

 

8.
Hed eas iran oto whecle2cf te i. concurrence agency if the application involves pastoral workers accommodation.
Child care centre 9. An application may trigger referra to the Department of Communities as a concurrence agency
Fermaeifomeiongptstedde2cftelP | if the application involves a childcare centre.
Coastal development 410. An application may trigger referral to the Environmental Protection Agency (EPA) as a
For more lferetion gp to schoo 2 f the IP concurrence agency if the application involves land completely or partly seaward of a coastal
. building line.
Heritage 11. An application may trigger referra to the Heritage Council as a concurrence agency if the
Rete omen gto sede 2f roe application involves a heritage registered place.
Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries
Fox mors Irforrtion goto sche 2 f the|P (OPI&F) as a concurrence agency if the application involves assessable building work in a
declared fish habitat area; or as an advice agency if the application involves assessable building
work on land that adjoins a dediared fish habitat area. .
Integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the
transport application involves existing or future public transport corridors, or airport operational airspace?’.
For mora information go to schedule 2 of the [P- . :
Reauiaton .
Railway safety and efficiency 14. An application may trigger referral to Queensiand Transport as a concurrence agency if the

application involves future railway land.

 

 

2 Qoastal building lines are prescribed under the Coastal Fretectian and

Act 1996.

2 Qperationd airspace is as defined in State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities’.

Page

Page 19

 

 

 

GENERAL NOTES

4

 

 

 

 

 

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THE CONTRACTOR SHALL VERIFY ALL SETTING OUT DIMENSIONS PRIOR TO
COMMENCEMENT OF WORKS.

 

   

J.T. COX CP Eng FIE Aust RPEQ No. $880

= 2 THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE
[vg ARCHICTECTURAL DRAWINGS AND ANY DISCREPANCIES SHALL BE REPORTED
< TO THE ENGINEER BEFORE PROCEEDING WITH THE AFFECTED PORTION OF
a THE WORK.
z 3 00 NOT OBTAIN DIMENSIONS BY SCALING FROM THESE DRAWINGS,
O| & ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE. WITH
m: THE REQUIREMENTS OF THE CURRENT EDITION OF SAA CODES AND
| THE BUILDING CODE OF AUSTRALIA.
>| Cc) OQ 5 THE CONTRACTOR SHALL CHECK THE LOCATION OF ALL UNDERGROUND
i! 1 6 M E R M A | D U A Y SERVICES FOR ALIGNMENT AND LEVEL PRIOR TO THE COMMENCEMENT OF
| CONSTRUCTION,
c :
w| & ANY DISCREPANCIES BETWEEN THE INFORMATION SHOWN ON THE
a: DRAWINGS AND THOSE DETERMINED ON SITE SHALL BE REFERRED TO
o} a/useisie2n J0sTs THE ENGINEER BEFORE PROCEEDING WITH THE WORK,
$ /145¥. it
|
O00 960 2600 1200, 2400 1800
: 37M12 MASONRY ANCHORS 47M12 MASONRY ANCHORS
| TO CANAL WALL~100mjs EMBEOMINT. TO CANAL WALI-100mm EMBEOMENT.
i CANAL WALL
if 1 . T if. + i
I I ey dg
: : |
3 600, 800 = 4s
7 ! a eo
125xb5(F27¢ | 3S et J— RAMP S|
_ | a S| iS DOWN S|
: a “fis. PO
8 | a z
sj i : 4 42
iL | =I" j= 3/N20x651F271 JOISTS
125x45(F 271 | i it@mm FORM PLY 6/90x70 HWD POSTS ORIVEN tmetre
: : | g INTO CANAL BOTTOM
2 | | WEP WEATHER MATTING 2/M12 BOLTS TO JETTY BEARERS,
z = TREATED PINE | ;
2 = i
g & Sa pecan. PROPOSED
3
& JETTY
= :
z
| 3 |
3 s \
= |
a :
3 L
9/125x450 HWD POSTS DRIVEN tmetre |
INTO CANAL BOTTOM 4500 |
2/Mi2 BOLTS TO JETTY BEARERS. ‘
PROPOSED \ ENGINEER GEATIFICATION:
JETTY |
i
i

 

 

 

 

:

 

 

 

 

 

 

 

JETTY LAYOUT

 

 

 

   

Date. Sth JBNE 2006

[

COJA consuctind ENGINEERS PTY LTO
CONSULTING STRUCTURAL ENGINEERS

243 PRYOR ROAD ,VERRIEROALE OLD 4562

TEL: (O7] 5671 1385 FAX: (07) S47T 1386

 

 

 

Purse

 

J T COX €P Eng FIE (Aust, RPEO
RPEQ No,5880

 

 

 

 

 

 

 

 

 

REVISION DETAILS

 

 

DATE

JETTY AREA: 30square metres

PROPOSED JETTIES AT

16 MERMAID QUAY-NOOSAVILLE
FOR CHRIS GRANDEMANGE
ARRANGEMENT & DETAIL

 

 

SCALE:

 

SHEET SIZE:
1:100 A3 K74

DRAWING NUMBER:
05-902

 

 

 

 

REVISION

oT

 

 

 

Page 20

CZONSULTING ENGINEERS PTY LTD ABN 75 003 007 116

aD Consulting Structural Engineers
D
A

Job Address: Proposed Jetties to existing dwelling at
16 Mermaid Quay-NOOSAVILLE

CERTIFICATE OF STRUCTURAL ADEQUACY

e This is to certify that the structural elements shown on the design documentation referred to in this
certificate have been designed in accordance with the principles of structural mechanics and the
Australian Standards noted below and are considered suitable for their intended function.

Design Documentation
This certificate relates to the following design documentation only:
e Jetty design drawings sheet number 05-902.

Standards and Specifications
The relevant Austratian Standards and specifications referred to for the design of the structural elements
are:

AS 1170 SAA Loading Code, parts 1 & 2.
AS 1684.2 SAA Residential Timber Framed Construction Code.
AS 3600 SAA Concrete Structures Code.

Design Criteria
The basic design criteria adopted during the design process are:
Design Criteria
The basic design criteria adopted during the design process are:

Floor design Loads:
Decking Areas: 3.0 kPa.

Wind loads:
Wind Classification N3

Footings Foundations
Site Classification: Class M
Design Bearing Pressure: 100 kPa.

  

J.T LOX C P Eng. Dated: 5" June, 2006

243 Pryor Road VERRIERDALE QLD 4562 TEL: 5471 1385
FAX: 5471 1386

Email [email protected]
k69

Page 21

xm
wow EC

SALE OF DOCUMENTS

Superseded Planning Scheme Documentation

Copy of Permit/Approvai Letter
The Noosa Plan Documentation

APPLICATION FEES
Material Change of Use - Code/Impact
Consistent ,
Inconsistent

Assessment under Superseded Planning Scheme

Modification to a Development Permit
Extension of a Currency Period
Operational Works - Landscaping

PRE LODGEMENT REVIEW
Half Hour
One Hour

ADVERTISING
Purchase Advertised Applications

 

Bldg Work assessable against the Planning Scheme

LAND USE SECTION FEES

146104 §20
32 146120
32 146564,1

32 146102 521
32 146102 521
32 146102 521
32 146102 521
32 146102 521
32 146102 521
32 146102 521

146119 §22
146119 522

31 146110 523

 

 

 

 

 

 

 

JETTIES f e :
Jetty Application Fee Fecha ho S275 __ 146115 524
a2 per S Aclar.—so~n oT
BONDS (rermet of breact?
Performance Bond ) 33 95 943200
SIGNS
Registration Fee 32 137510 222
ARCH FEE .
Search of Land Use Section file 32 146120
Liquor Licensing Request 32 146120
Creche Case TOTAL $ SIS
NAME: Co Granrdema oe Sfol 292%e>2.
a
ADDRESS: le Mat rnrana dk Ce ann
5 —_7
eoartihas ste
FILE NO: ebl (2b DATE: 2 | (oto
RECEIPT NO: 1877022... Signature of TP Officer: 7S S-nea
AUTHORITY NO:

 

I | 2e06//2t266/ /

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1266 - Op Works Transport Type 5 Domestic Marine [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.