INTEGRATED PLANNING ACT 1997
Heritage

For further information refer to Guide 19.

If you arswered PYES2to O15, the application

Declared catchment areas .
For more information; inctuding a list of the dedared
caichrrent areas within Queensiand, refer to Guide
‘Unless you answered “hone of the above?to O16,
the application requires assessment by the
Department of Neural Resourves and Mines

“(NREM).

+ [Ran agency other than NR&Mis the assessment

lmarager for the application, NR&Mis a concurrence
agency for the aaptication in relation to this matter.
Contaminated land

Applications involving meterlal change of use and /
oF reconfiguring a lot rmay trigger this referral.

+ For more information refer to Guide 5.
Unless you answered ‘hone of the above?to O17,
the application requires assessment by the
Eawironrenta Protection Agency (EPA). fan

{ 29ency Gther than EPA is tha assessment manager
for the application, EPA will be a concurrence:
agency for the application in relation to this raiter.

Electricity infrastructure

For more information refer to schedule 2of the IP
Requtation,

Unless you ansered ‘hone of the above7to Q18,
the application tiggers referral to the agency to
which the easerrent is granted io favour of as adkice|
agency.

16. The application is in an area dadared to be a catchrrert area under the Viater Act 2000 and

 

IDAS Assessrrent Checklist, Version 15.0, 18 Noverrber 2005
ication involve development in a heritage registered place as defined under the
id Heritage Act 1992?

15. Does the

— CLYES ?eorpte Pat Corre

involves: (lick the applicable bores)
OQ reconfiguring a Iot, if any lot resulting from the reconfiguration is less than 16 hectares,
(1 (i) development assessable against the planning scheme involving the establishment or

Jon of a waste water disposal system, other than a disposal system for carrying
meg anni eer hye nr Pt 1994,
fli} none of the above .

we nee
17. The application involves cx he appticattebaves)
(1) (i) reconfiguring a lot for which all of part of the prerrises are ?
(2) premises mentioned in the IPA, schedue 8, part 1, table 2?
« item5, induding the exemption otherwise provided for by paragraph (d);
« item6, inducing the exemption othenise provided for by paragraph (e); or
« iten7, induding the exemption otherwise provided for a mining activity or petroteun
adivity; or
(b) inn area for wich an area management advice has been given for unexploded
ordnance - complete Part Nof Fon 1
(i) ameterial change of use?
(a) made assessable under the iPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the prerrises is in an area
oes a aca Pore ance hes been Gen for unexploded ordnance -
conplete Pat Nof Foam
iii) none of the above la. .
18. The application involves: (tick the applicable baves)
(0 @ reconfiguring a lot where any part of the lat is ?
» exhjedto an easement in favour ofa distribution ent or trenerssion ently under the
Gedticity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

+ situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if ?

* any pat of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Gectricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

* any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement,

a material change of use, assessable against a planning scherre and not assotiated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site;

operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if ?

« any pat of the prerrises is subject to an easement in favor of a distribution entity or
transrrission entity under the Electricity Act 1994 and the work is located wholly or partly in

the work is located wholly or partly within 10m of a substation site;
(v) none of the above. ;

a pee mont

Odi

Dai

Ow

 

 

21 ‘Sretegic port land tidal areas are the areas generally SD metres seaword of high weer merk adlacent to streteges pat land.

Page5

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1266 - Op Works Transport Type 5 Domestic Marine [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.