Council archive · source document
06/1266 - Op Works Transport Type 5 Domestic Marine [As Published] · 142006.1266
IDAS Assessment Checklist, Version 15:0, 18 Noverrber 2005 ,
INTEGRATED PLANNING ACT 1997
Integration of land use and public 22. The application involves: (tick the appiicatie bates}?
transport ~
Fer me irfonation refer to Guide 23, soherkde 24
+ ofthe IPA, & schedule 2 of the IP Regulation.
» Unless you anasered ‘hone ofthe above? the
application triggers referral te CIT as. a concurrence:
agency.
CO (i) a material change of use assessable against the planning scheme for a purpose
‘mentioned in schedule 13C of the IP Reguiation and exceeding the thresholds set by that
schedue.
C1 (ii) reconfiguring a tot?
Dw on land thatis completely or petly within a public transport corridor, andthe
total number of lots increases;
Ob) cn land that is completely or partly within a future public transpert corridor or
an airport's public safety area;
(C1 (©) onland that is within 400m of a public passenger transport facility or a future,
public passenger transport facility, and the total site area is 5000: or greater,
(@) _ for aresidentia purpose within the 25 ANEF contour for an airport; .
Ge) _ for aresidential purpose resulting in 100 or more allotments.
C1 (ili) operational work assessable against the planning scheme, but not associated with a
meterial change of use mentioned in (i) above or reconfiguring a fot mentioned in (ii)
, above, on land that? -
| Oe iscerpeely or partly witin a pubic ransport card or a fit pbc
transport corridor,
(b) will result in work that encroaches into an airport's operational airspace.
| wee Honore ofthe above. cpg ty
: Railway safety and efficiency
For move Information refer to Guide 23, schedule 8A,
‘ofthe PA & schedule 2 of the (Regulation, 4
+ Unies you angered hone of the above the
application triggers referral to CT as a concurrence
Jogeny, Te
23. “The application involves {tick the applicable bav/es)? ,
C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedue, °
0 (ii) recontiguring a lot?
O(a) onland thet is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easernent;
(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Cltytrain passenger railway station, and the total site area is 5000? or
greater,
Oo on land that abuts rail corridor land, conrmercial corridor land or future railway
land, and the total nurrber of lots increases;
Cd) onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
LI (e) onland that is completely or partty within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
LC (f) for aresidentia purpose resulting in 100 or more allotments.
D (ili) operational work assessable against the planning scherre, but not associated with a
traterial change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than SOrré, on land that’?
[1 (a) _ is completety or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
C1 (b) is corrpletely or partly within future railway land, or a railway tunnel easement;
(c) abuts rail corridor land, commercial corridor land or future railway land, and
ha the work is within 25m of the railway boundary.
iv) none of the above. .
Referrat coordination
if the applicalian involves ?
() 3.or more concurrence agencies; or
(ii) a facility or area assessable under a
Planning scheme and prescribed in
‘schedule? or 8 of the IP Requlation; or
(il) development which is subject to an
. application for preliminary approval
mentioned in s3.1.6 of the IPA.
For more infomation go to Guide2 and Guide 6,
24. Dose ye keain trigger referral coordination?
(1 YES, as the application: (tick the anpiicable baves)
(Qi) _ triggers 3 or more concurrence agencies;
Ow involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation, -
. Ci) involves a material change of use (other than a dwelling house, outbuilding
, or farm building) made assessable under a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Reguatior,
Ow istora prelirrinary approval mentioned in $3.1.6 of the IPA
Page?
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/1266 - Op Works Transport Type 5 Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.