Skip to the record
Search everything, all in one place.

Council archive · source document

06/1266 - Op Works Transport Type 5 Domestic Marine [As Published] · 142006.1266

of 21

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

GENERAL NOTES

4

 

 

 

 

 

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THE CONTRACTOR SHALL VERIFY ALL SETTING OUT DIMENSIONS PRIOR TO
COMMENCEMENT OF WORKS.

 

   

J.T. COX CP Eng FIE Aust RPEQ No. $880

= 2 THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE
[vg ARCHICTECTURAL DRAWINGS AND ANY DISCREPANCIES SHALL BE REPORTED
< TO THE ENGINEER BEFORE PROCEEDING WITH THE AFFECTED PORTION OF
a THE WORK.
z 3 00 NOT OBTAIN DIMENSIONS BY SCALING FROM THESE DRAWINGS,
O| & ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE. WITH
m: THE REQUIREMENTS OF THE CURRENT EDITION OF SAA CODES AND
| THE BUILDING CODE OF AUSTRALIA.
>| Cc) OQ 5 THE CONTRACTOR SHALL CHECK THE LOCATION OF ALL UNDERGROUND
i! 1 6 M E R M A | D U A Y SERVICES FOR ALIGNMENT AND LEVEL PRIOR TO THE COMMENCEMENT OF
| CONSTRUCTION,
c :
w| & ANY DISCREPANCIES BETWEEN THE INFORMATION SHOWN ON THE
a: DRAWINGS AND THOSE DETERMINED ON SITE SHALL BE REFERRED TO
o} a/useisie2n J0sTs THE ENGINEER BEFORE PROCEEDING WITH THE WORK,
$ /145¥. it
|
O00 960 2600 1200, 2400 1800
: 37M12 MASONRY ANCHORS 47M12 MASONRY ANCHORS
| TO CANAL WALL~100mjs EMBEOMINT. TO CANAL WALI-100mm EMBEOMENT.
i CANAL WALL
if 1 . T if. + i
I I ey dg
: : |
3 600, 800 = 4s
7 ! a eo
125xb5(F27¢ | 3S et J— RAMP S|
_ | a S| iS DOWN S|
: a “fis. PO
8 | a z
sj i : 4 42
iL | =I" j= 3/N20x651F271 JOISTS
125x45(F 271 | i it@mm FORM PLY 6/90x70 HWD POSTS ORIVEN tmetre
: : | g INTO CANAL BOTTOM
2 | | WEP WEATHER MATTING 2/M12 BOLTS TO JETTY BEARERS,
z = TREATED PINE | ;
2 = i
g & Sa pecan. PROPOSED
3
& JETTY
= :
z
| 3 |
3 s \
= |
a :
3 L
9/125x450 HWD POSTS DRIVEN tmetre |
INTO CANAL BOTTOM 4500 |
2/Mi2 BOLTS TO JETTY BEARERS. ‘
PROPOSED \ ENGINEER GEATIFICATION:
JETTY |
i
i

 

 

 

 

:

 

 

 

 

 

 

 

JETTY LAYOUT

 

 

 

   

Date. Sth JBNE 2006

[

COJA consuctind ENGINEERS PTY LTO
CONSULTING STRUCTURAL ENGINEERS

243 PRYOR ROAD ,VERRIEROALE OLD 4562

TEL: (O7] 5671 1385 FAX: (07) S47T 1386

 

 

 

Purse

 

J T COX €P Eng FIE (Aust, RPEO
RPEQ No,5880

 

 

 

 

 

 

 

 

 

REVISION DETAILS

 

 

DATE

JETTY AREA: 30square metres

PROPOSED JETTIES AT

16 MERMAID QUAY-NOOSAVILLE
FOR CHRIS GRANDEMANGE
ARRANGEMENT & DETAIL

 

 

SCALE:

 

SHEET SIZE:
1:100 A3 K74

DRAWING NUMBER:
05-902

 

 

 

 

REVISION

oT

 

 

 

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_1266 - Op Works Transport Type 5 Domestic Marine [As Published].pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.