20210041 Bottlebrush Ave Op Works
Original PDF page 3, section 2. The text section number identifies this passage in the reader.
PLAN ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD 17. IN ACCORDANCE WITH NC ESC GUIDELINES, MAINTENANCE OF ESC
SHALL BE READ IN CONJUNCTION WITH THE APPROVED DRAWINGS. SEDIMENT AND EROSION CONTROL: Title
ALREADY SIGNIFICANTLY DECREASED. DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD MEASURES SHALL OCCUR IN ACCORDANCE WITH THE FOLLOWING CONTRACTOR TO ALLOW FOR PROVISION OF ALL REQUIRED EROSION AND SEDIMENT CONTROL PLAN
3. FOR ALL OTHER STORMWATER RELEASES, FLOWS AND DISCHARGES 7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE (CONSTRUCTION SITES ONLY), EXIT-03 - ROCK PADS FOR BUILDING TABLE: SEDIMENT AND EROSION CONTROL DEVICES IN ACCORDANCE
FROM THE SITE, THE RELEASE LIMIT PRESCRIBED IN (1a) ABOVE MUST OBTAINED FROM THE SUPERINTENDENT FOR THE LOCATION OF THE SITES AND EXIT-04 AND EXIT-05 CONSTRUCTION EXIT - VIBRATION
S
WITH IECA AND NOOSA SHIRE COUNCIL POLICIES AND
NOT BE EXCEEDED UNLESS THE DEVELOPMENT IS IN FULL SITE ACCESS POINT AND WASH DOWN AREA WHICH ARE TO BE GRID. GUIDELINES
COMPLIANCE WITH THIS STANDARD. MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.
8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO KERB INLET
BE DIFFERENT OR FAILED IN SERVICE, CORRECTIVE ACTION IS TO BE 12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION REFER TO Project No. Discipline Status
SEDIMENT CONTROL UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE AMENDMENTS'
S
INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA 20210041 CIVIL OPW
Designed By Drawn By Scale
(at
BRP BRP 1:100 A1)
Drawing No. Revision
C10 A