Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

RFI - Amended landscape plans

of 651

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

SPECIFICATION NOTES                                                                                            ·   FINISHED TURF GRADES/CONTOURS TO BE GENERALLY SMOOTH, COORDINATE ON SITE WITH SUPERINTENDENT
                                                                                                                   AND ENSURE LEVELS ARE APPROVED PRIOR TO TURFING.
NOTE:THIS LANDSCAPE PLAN MUST BE READ IN CONJUNCTION WITH THE APPROPRIATE STATUTORY APPROVALS,                 ·   TURF LAID ON LOW SIDE OF HARD SURFACES SHALL BE 20MM BELOW ADJACENT HARD SURFACE TO NOT IMPEDE
SUNSHINE COAST COUNCIL REQUIREMENTS AND RELEVANT AUSTRALIAN STANDARDS.                                             STORM WATER FLOW.
                                                                                                               ·   SUPPLY AND LAY TURF AS INDICATED ON THE DRAWINGS.
THIS INCLUDES BUT IS NOT LIMITED TO:                                                                           ·   WATER TURF IN WELL DURING ESTABLISHMENT.
AS3640 WORKPLACE ATMOSPHERES - DUST                                                                            ·   APPLY WATER TO MAINTAIN SOIL MOISTURE UNTIL ESTABLISHED DURING MAINTENANCE PERIOD TO MAINTAIN
AS4373 PRUNING OF AMENITY TREES                                                                                    VIBRANT GREEN TURF COLOUR AND HEALTH.
AS4454 COMPOSTS, SOIL CONDITIONS & MULCHES
                                                                                                               GRADES
                                                                                                               ·  SITE SHALL BE POSITIVELY DRAINED, I.E. NO PONDING AREAS, 2% MINIMUM TO PITS OR LEGALLY SHEET FLOWING
GENERAL                                                                                                                                                                                                                      SUNSHINE COAST
·  FOR MORE DETAIL REFER TO THE PROJECT ARCHITECT'S AND ENGINEER'S DRAWINGS.                                      OFF-SITE.
                                                                                                               ·  MULCHED GARDEN BED AREAS SHOULD NOT EXCEED A 1:3 GRADE AND TURF AREAS SHOULD NOT EXCEED A 1:4             Level 1, 24 Duporth Avenue

·   PLANTING SHOWN REFLECTS THE DESIGN INTENT, EXACT NUMBERS AND LOCATIONS WILL REQUIRE CONFIRMATION              GRADE.                                                                                                    Maroochydore QLD 4558
    ON SITE BY THE SUPERINTENDENT. ANY CHANGES TO BE MADE TO THE LANDSCAPE PLAN MUST BE APPROVED BY            ·  FINAL GRADE EXISTING TOP 100MM AND TRIM TO +/-10MM TO ACHIEVE PLAN LEVELS.                                T + 61 7 5499 6188
    THE LANDSCAPE ARCHITECT AND SUPERINTENDENT.
                                                                                                               MAINTENANCE TASKS
·   ALL LANDSCAPE PLANS PRESENTED ASSUME THAT ALL BASE AND SURVEY INFORMATION IS ACCURATE AND TO               ·  LANDSCAPE CONSTRUCTION CONTRACTOR TO MAINTAIN WHOLE OF LANDSCAPE WORKS FOR ESTABLISHMENT
                                                                                                                                                                                                                             © Place Design Group Pty Ltd A.C.N. 082 370 063
    SCALE. THE CONTRACTOR SHALL CHECK LANDSCAPE PLANS PRESENTED FOR ANY DISCREPANCIES WITH THE                    PERIOD OF 13 WEEKS AND HAND OVER TO OWNER ONCE COMPLETED.
    EXISTING SITE CONDITIONS OR OTHER DRAWINGS PRESENTED PRIOR TO ANY CONSTRUCTION WORK TAKING PLACE.          ·  THE FOLLOWING TASKS ARE TO BE ACTIONED DURING ESTABLISHMENT AND IN PERPETUITY;                             All information displayed, transmitted or carried within this drawing is
                                                                                                                                                                                                                             protected by Copyright and Intellectual Property laws.
    IF DISCREPANCIES DO OCCUR THESE SHALL BE HIGHLIGHTED AT ONCE TO THE SUPERINTENDENT PRIOR TO ANY                                                                                                                          The information contained in this document is confidential.

    CONSTRUCTION WORK TAKING PLACE. DIMENSIONS TAKE PRECEDENCE.                                                IRRIGATION AND WATERING                                                                                       Recipients of this document are prohibited from disclosing the information
                                                                                                                                                                                                                             herein to any person without the written consent of Place Design Group.
                                                                                                               ·    EVERY DAY FOR THE FIRST TWO WEEKS (UNLESS IT RAINS ADEQUATELY)                                           Annotated dimensions take precedence over any measures of scale.

THE CONTRACTOR SHALL:                                                                                          ·    EVERY 2-3 DAYS DURING THE BALANCE OF THE ESTABLISHMENT PERIOD OR AS NEEDED IF HOT AND DRY (UNLESS IT     Verify all dimensions on site prior to construction.
                                                                                                                                                                                                                             This drawing may display with permission a combination of specialist and
·   INSTALL SILT CONTROL AND VEGETATION PROTECTION FENCING AS REQUIRED.                                             RAINS ADEQUATELY).                                                                                       other consultant(s) input and linework.

·   REMOVE ALL UNWANTED MATERIAL FROM LANDSCAPE WORK AREA.                                                     ·    ONCE A WEEK THERE AFTER.                                                                                 Nominated specialist and consultant information contained within this
                                                                                                                                                                                                                             document is referenced from their supplied documentation and is
·   CONFIRM ALL DIMENSIONS ON SITE PRIOR TO CONSTRUCTION.                                                                                                                                                                    contained in this document as indicative only and not for construction or
·   SEEK INSTRUCTION FROM SUPERINTENDENT WHERE LEVEL DISCREPANCIES, SPECIFICATION SUBSTITUTIONS AND            TURF MOWING                                                                                                   certification purposes.

    POOR SOIL STRUCTURE OCCURS.                                                                                ·  FIRST MOW - ONCE AFTER 10 DAYS IF THERE IS RAPID GROWTH OR 14 DAYS AFTER INSTALLATION.
                                                                                                               ·  MOWING THEREAFTER - ONCE A WEEK DURING SUMMER, ONCE EVERY TWO WEEKS IN SPRING AND AUTUMN,                 PROJECT
SERVICES                                                                                                          AND ONCE A MONTH IN WINTER OR AS REQUIRED IF THERE IS A LOT OF GROWTH OR AS DESIRED.
·   THE CONTRACTOR SHALL CONFIRM THE LOCATION OF ALL SERVICES WITH RELEVANT AUTHORITIES PRIOR TO
    PLANTING AND EXCAVATION.                                                                                   TURF TRIMMING                                                                                               LOT 1 TAYLOR CT, COOROY
                                                                                                               ·  AS REQUIRED. MAINTAIN 5MM GAP BETWEEN TURF AND HARD SURFACES.
DRAINAGE
·    ENSURE DRAINAGE WORKS CORRELATE WITH ADJACENT LAND AND SPECIFIED FINISHED LEVELS.                         TURF AERATION AND TOPDRESSING                                                                                 CLIENT
·    INSTALL FIELD INLETS TO MANUFACTURER'S RECOMMENDATIONS AT LOCATIONS AND LEVELS INDICATED ON               ·  AS REQUIRED - TYPICAL TIMING IS END OF OCTOBER (SPRING) AND END OF FEBRUARY (AUTUMN).
     PLANS. FINISH SURFACE PIT LEVEL FLUSH WITH ADJACENT FINISHED SURFACE LEVELS. ENSURE POSITIVE OVERLAND     ·  AERATE 100MM DEEP, 50MM O.C. WITH 16MM TINE (CORER).
     DRAINAGE FLOW TO ALL PITS AND THAT NO PONDING OCCURS AROUND THE PIT. ALIGN ALL PITS SQUARE WITH TO        ·  COLLECT PLUGS AND DISPOSE ENSURING THEY DO NOT GET REINCORPORATED INTO HOLES. TOPDRESS WITH TURF                     BULLGATE PTY LTD
     PATHS, PAVEMENT PATTERNS, KERBS, WALLS AND ALIKE.                                                            TOPSOIL NOMINATED IN FINISHES SCHEDULE - BRUSH TOPSOIL IN WITH BROOM.
IF REQUIRED:
·    INSTALL CONTINUOUS SUB-SURFACE DRAINAGE SYSTEM TO LOCATIONS AND LEVELS AS INDICATED ON PLANS.             ADDITIONAL MAINTENANCE TASKS                                                                                 NOTES
     SUB-SOIL DRAINS SHALL INCORPORATE A TRENCH WITH A GEOTEXTILE LINING, DRAINAGE GRAVEL BACKFILL             ·  WEED REMOVAL AND WICK WIPING: AS REQUIRED TO REDUCE COMPETITION AND SEEDING.
                                                                                                                                                                                                                            ALL MEMBER SIZES, CONNECTIONS, FOOTINGS ETC
     MATERIAL AND A 100MM SLOTTED AG-PIPE TO THE FOLLOWING SPECIFICATION;                                      ·  PLANT REPLACEMENT: IMMEDIATELY REPLACE PLANTS THAT DIE OR FAIL TO THRIVE, ARE DAMAGED OR STOLEN,          ARE TO BE CONFIRMED BY AN ENGINEER. SIZES
-      GEOTEXTILE MATERIAL: GEOTEXTILE MATERIAL SHALL BE A NON-WOVEN TYPE                                         WITH PLANTS OF THE SAME SPECIES AND OF SIMILAR SIZE AND QUALITY UNLESS OTHERWISE SPECIFIED.               NOMINATED ARE INDICATIVE OF FINAL APPEARANCE
            AND SHALL HAVE A STRENGTH RATING (G) OF GREATER THAN 900                                           ·  STAKES AND GUYS: ADJUST AND/OR REPLACE STAKES AND TIES WHERE REQUIRED. REMOVE STAKING AND GUYING          REQUIRED. CONTRACTOR IS TO PROVIDE SHOP
-      BACKFILL MATERIAL: 20MM DRAINAGE AGGREGATE IN ACCORDANCE WITH                                              WHEN INSTRUCTED BY THE SUPERINTENDENT.                                                                    DRAWINGS FOR APPROVAL BEFORE COMMENCING
                                                                                                               ·  RE-MULCHING: AS REQUIRED TO MAINTAIN A CONSISTENT DEPTH, 100MM SETTLED, UNTIL PLANTS ARE                  CONSTRUCTION.
            AS 2758 - 1988.
-      DRAINAGE PIPES: 100MM Ø SLOTTED AG-PIPES SHALL COMPLY WITH                                                 ESTABLISHED.                                                                                              ALL WATER PROOF MEMBRANES, HYDRAULIC
            AS 2439-PART 1 "PERFORATED DRAINAGE PIPE AND ASSOCIATED FITTINGS".                                 ·  TRIM / PRUNE PLANTS TO REMOVE DEAD, DYING AND DISEASED GROWTH AND FOR CHARACTER AND FORM AS               FITTINGS, ELECTRICAL / LIGHTING FITTINGS AND
PERFORATIONS SHALL NOT EXCEED 0.7MM IN DIAMETER OR WIDTH.                                                         REQUIRED.                                                                                                 REINFORCED CONCRETE STRUCTURES ETC TO
                                                                                                               ·  ENSURE PRUNING OF TREES TO DEVELOP ONE MAIN TRUNK & LOWER BRANCHES ARE REMOVED TO ALLOW SIGHT             ENGINEERS, ARCHITECTS, HYDRAULIC ENGINEERS,
                                                                                                                  LINES FOR VEHICLES.                                                                                       ELECTRICAL ENGINEERS DETAILS AND
TOPSOIL                                                                                                                                                                                                                     SPECIFICATIONS.
·   COLLECT TOPSOIL SAMPLE(S) AND HAVE IT TESTED BY A NATA CERTIFIED LAB FOR HORTICULTURAL SUITABILITY, I.E.                                                                                                                SIZES NOMINATED ARE INDICATIVE OF FINAL
    PLANTING TREES AND TURF. FURNISH TEST RESULTS TO LANDSCAPE ARCHITECT.                                      MONITORING: PROVIDE A MONTHLY REPORT ON COMPLETED TASKS.                                                     APPEARANCE REQUIRED
·   CULTIVATE GARDEN AND TURF AREAS 150MM DEEP.
·   AMELIORATE SUBGRADE AND SITE TOPSOILS PER TESTING RESULTS.                                                 CERTIFICATIONS
·   INSTALL AMELIORATED SITE TOPSOILS OR APPROVED IMPORTED TOPSOIL THAT COMPLIES WITH MRTS 16 (MAIN            ·   PROVIDE AS2013:2105, TOPSOIL, MULCH, AND TURF CERTIFICATIONS TO SUPERINTENDENT AND LANDSCAPE
    ROADS TECHNICAL SPECIFICATION) TO PLANTING AREAS IF AMELIORATED SITE TOPSOIL IS NOT AVAILABLE.                 ARCHITECT PRIOR TO PRACTICAL COMPLETION.
·   ALL SOIL STOCKPILES ARE TO BE MAINTAINED TO CONTROL WEEDS ROUTINELY AND GUARD AGAINST DISPERSION
    BY WIND OR WATER. STOCKPILES SHALL BE LIMITED TO A MAXIMUM HEIGHT OF 2M AND MAY REQUIRE COVERING           DELIVERABLES
    OR RETAINING. STOCKPILES ARE NOT PERMITTED WITHIN CLOSE PROXIMITY TO RESIDENTIAL PROPERTIES.               ·   WARRANTIES
·   GENERALLY SOIL TO BE USED SHALL COMPLY WITH THE FOLLOWING SPECIFICATION;
(1) FRIABLE AND FREE DRAINING SANDY LOAM                                                                       SOURCES
(2) GOOD TEXTURE AND STRUCTURE FOR SELECTED USE                                                                ·  SURVEY - PROVIDED TO US BY BARLOW SHELLEY CONSULTING ENGINEER                                                                   FOR APPROVAL
(3) ACCEPTABLE CONDUCTIVITY AND PH LEVELS FOR SPECIFIED PLANTS                                                 ·  CIVIL ENGINEERING - BARLOW SHELLEY CONSULTING ENGINEERS

CONCRETE
                                                                                                                                                                                                                           ISSUE CODE          ISSUE DESCRIPTION             BY CHK DATE
·  REFER TO FINISHES SCHEDULE AND ENGINEER'S AND ARCHITECT'S PLANS RESPECTIVELY.
                                                                                                                                                                                                                             01      CA     FOR OPERATIONAL WORKS VS               JB 24.08.2020
                                                                                                                                                                                                                             02      CA     OPERATIONAL WORKS RFI            RY    JB 13.10.2020
MULCH
·  ALL MULCH PROPOSED TO BE USED ON SITE SHALL BE FREE OF DELETERIOUS MATERIALS AND FOREIGN MATTER
   INCLUDING ANTHROPOGENIC WASTE, ROCK, SOIL, SEDIMENT CONTAMINATION, WEEDS AND STICKS.
·  MULCH GARDEN AREAS 100MM DEEP SETTLED, KEEPING 50MM CLEAR OF PLANT STEMS, TO ENSURE SITE WATER
   CONSERVATION REQUIREMENTS ARE ACHIEVED.

GENERAL PLANTING
·  PLANT STOCK IS TO BE APPROVED BY CONTRACTOR AND QUALIFIED ARBORIST PRIOR TO ACCEPTANCE OF DELIVERY.
·  FOR PLANTING, EXCAVATE GARDEN AREAS TO A DEPTH OF 300MM, CULTIVATE SUBGRADE TO A DEPTH OF 150MM
   AND TREAT AS PER SOILS TESTING RESULTS.
·  INSTALL AMELIORATED SITE TOPSOIL OR SPECIFIED TOPSOIL 300MM DEEP, SETTLED, AND MULCH AS SPECIFIED.
·  NO SYNTHETIC, GRANULAR BLENDED FERTILISERS TO BE USED ON SITE. SLOW RELEASE ORGANIC TREE TABLETS
   SHALL BE USED AT ESTABLISHMENT.
·  ALL PLANTINGS SHALL INCORPORATE THE INCLUSION OF A SLOW RELEASE NATIVE PLANT FERTILIZER (AS PER
   MANUFACTURERS SPECIFICATION) AND THE USE OF A SOIL MOISTURE RETENTION ADDITIVE (AS PER
   MANUFACTURERS SPECIFICATION), PLACED ADJACENT THE PLANT ROOT BALL AT THE TIME OF PLANTING.
·  TREES >25 LITRE BAGS ARE TO BE CERTIFIED BY A QUALIFIED ARBORIST AS AS2013:2105 COMPLIANT PRIOR TO
   DELIVERY TO SITE. QUALIFIED ARBORIST TO SELECT AS2013:2105 COMPLIANT TREES AT NURSERY AND CHECK ON
   DELIVERY TO SITE. FURNISH CERTIFICATION TO SUPERINTENDENT AND LANDSCAPE ARCHITECT PRIOR TO PRACTICAL                                                                                                                    PRE - Preliminary | CA - Council Approval | T - Tender | CON - Construction
   COMPLETION.
·  DO NOT INSTALL TREES WITHIN:                                                                                                                                                                                             DRAWING TITLE
-    1M OF UNDERGROUND SERVICES
-    1.5 OF SEWERS, HORIZONTALLY AND VERTICALLY                                                                                                                                                                                              GENERAL
-    3M OF DRIVEWAY CROSSOVERS
-    4M OF STREET LIGHTS AND POWER POLES                                                                                                                                                                                                   SPECIFICATION
-    5M OF BUS STOPS - DEPARTURE SIDE
-        15M OF BUS STOPS - ARRIVAL SIDE
·  WHERE DIFFERENT GROUNDCOVERS ARE PLANTED IN MASSES, TRIANGULARLY SPACE THEM EQUIDISTANT PER                                                                                                                              DESIGN   : JB                                              NORTH
   SPECIES AND PLANT THEM IN ODD NUMBERED GROUPS OF 5, 7, AND 9 PER SPECIES                                                                                                                                                 DOCUMENT : VS
                                                                                                                                                                                                                            PROJECT : 2020057
TURF AREAS
·  EXCAVATE TURF AREAS TO A DEPTH OF 150MM, CULTIVATE SUBGRADE TO A DEPTH OF 150MM AND TREAT AS PER
   SOILS TESTING RESULTS.
·  INSTALL 150MM OF AMELIORATED SITE TOPSOIL.

                                                                                                                                                                                                                            DRAWING NUMBER                                REVISION
                                                                                                                                                                                                                             2020057-LS-001                               02
Log in to download the original file

RFI - Amended landscape plans.pdf · 9.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.