Annexure 5 Master Plan 2 (003)
Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
Annexure 5— Master Plan 2 endorsed 10 April 2003 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 35 pages
Page 2
Page 3
FINAL ~ 10]/4|2003. Shire Business Centre Master Plan: Stage 2 NOOSA COUNCIL APRIL 2003
Page 4
Page 5
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 2 This Plan (MP2) is the second stage of the master planning process for the Noosa Shire Business Centre and follows on from the Shire Business Centre Master Plan: Stage 1 - Concepts (MP1). This document together with MP1 comprises a Planning Study prepared as part of the supporting documentation for The Noosa Plan: Choosing Futures process. It is intended to support a planning scheme that is consistent with the requirements of the Integrated Planning Act. MP2 is also consistent with the master plan process nominated by the 1997 Strategic Plan. Project: Shire Business Centre Master Plan Project Type: Master Plan Stage 2 Report Author/s: Raul Weychardt plus material from MP1 prepared by Pau! Summers Completion Date: April 2003 Status of Report: Final - Adopted by Council 10 April 2003 G:NDEP\Projects\SBC\Masterplan-FinalApr04.doc
Page 6
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 3 EXECUTIVE SUMMARY This Stage 2 of the Master Plan (MP2) is: > A response to provisions of the 1997 Shire of Noosa Strategic Plan; A guide to preparing and assessing development applications; and Together with Stage 1 of the Master Plan (MP1), a Planning study intended to support a planning scheme that is consistent with the Integrated Planning Act. It provides the second stage of a two-stage process that will lead to the adoption of a master plan for the Shire Business Centre site. Stage 1 provided an overall concept plan defining precincts for business, employment and open space. It also provided concepts for dealing with traffic. The proposed development outcomes contained in MP2 are consistent with the 1997 Strategic Plan's aim to: Encourage the development of the principal business, retail and administrative centre on Eenie Creek Road at Noosaville, in stages consistent with the needs of the population of the Shire. Stage 2 of the Master Plan provides another step along the way to achieving the aim of the Strategic Plan and in informing the development of Noosa's next planning scheme. It does this by providing a plan that will assist in: vvvyvvypyp*ypesgy¥$£iisv Attracting appropriate employment generating businesses to the Shire; Catering for the expanded retail needs of the community; Preparing development applications; Informing the Council and the community in the assessment of development applications; Attracting new knowledge business; Creating sustainable employment; Introducing higher order education opportunities; ‘ Environment protection and preservation of open space; and Creating a Centre that is well designed, sustainable and is appropriate to its Noosa setting. G '\DEP\Projects\SBC\Masterplan-FinalApr04.doc
Page 7
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 4 CONTENTS 9.0 INTRODUCTION... cssssssscsssscsesssssnvssssvsssssossssssseesesetsessess 5 2.0 BACKGROUND... 2.1. STRATEGIC PLAN 2.2 ECOLOGICAL VALUES.. 2.3 CONSTRAINT MAPPING 3.0 PLANNING & DESIGN GUIDELINES AND PRINCIPLES.. see ese 10 3.1. GENERAL PRINCIPLES. + 10 3.2 URBAN DESIGN............. 14 3.2.1 Design Workshop ... 14 3.3 RETAIL DEVELOPMENT. 3.4. DEVELOPMENT SEQUENCING . 3.5 TRANSPORT ....sessssssssssssseceesee . 3.6 ECOLOGICALLY SUSTAINABLE DEVELOPMENT... 17 3.7. OPEN SPACE AND LANDSCAPING. ......s.sssssssssssseee 17 4.0 MASTER PLAN OUTCOMES: STAGE 2 44 42 43 5.0 6.0 G:\DEP\Projects\SBC\Masterplan-FinalA pr04.doc
Page 8
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 , 5 1.0 INTRODUCTION MP2 comprises a second response to the requirement at Section 19.3.1.5 of the 1997 Strategic Plan for the preparation of a master plan to guide the overall development of the Shire Business Centre site indicated in Map 1, It also serves as a planning study intended to support a planning scheme that is consistent with the Integrated Planning Act. : MP2 includes a more detailed version of the concept plan. Itis intended to guide the development of the site, until the IPA Planning Scheme for Noosa Shire is implemented. The Master Plan will also be used to inform the preparation of the new IPA Scheme. The new IPA Scheme will establish codes for development of the site. MP2 addresses the objective of the 1997 Strategic Plan to provide for a multifunction employment node serving Shire-wide needs and including provision for business, retail, administrative, community and industrial functions. The model contained in this document: > Complies with the Strategic Plan; > Can be used to determine whether a development proposal meets the needs of the Noosa Shire community The Master Plan and the area indicated in Map 1.1 address three lots: 1RP21 5933, 3RP215933 and 2SP110885. It also gives consideration to roads, both existing and proposed and including relevant " intersections, which lie adjacent to or within the lots. In this document, the term MP1 refers to Shire Business Centre Master Plan: Stage 1- Concepts. The term MP2 refers to this second stage document. Itis intended that MP2 complement the initial work undertaken by MP1. However where any conflicts arise between the documents MP1 and MP2, this document Noosa Shire Business Centre Master Plan - Stage 2 shall take precedence. ‘GADEP\Projects\SBC\Masterplan-FinalApr04.doc
Page 9
| CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 6
Map.1 Location
NOOSA
JUNCTION
’ shi I nee
! Business
af a“ , _Santre
~S i
2
Ken
. | GADEP\Projects\SBC\Masterplan-FinalApr04.doc
Page 10
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 7 2.0 BACKGROUND MP2 draws from a number of sources including: > > > > The 1997 Strategic Plan; MP1 (Shire Business Centre Master Plan: Stage 1 - Concepts dated May 2001) which included consultation with the Noosa Shire community, State agencies and representatives of a proponent conducted as part of the initial phase of developing Stage 1 of the master plan (Council decision 15/04/1999) refers); Comments from reference groups; and Design workshop held on 5 September 2002 2.4 STRATEGIC PLAN © The 1997 Strategic Plan provides the foundation from which the Master Plan was developed. The Strategic Plan has an important influence on decision-making associated with any development application and also provides a significant indication of the way in which the site should be developed. For these reasons, a number of extracts from the Strategic Plan were included in the text of MP1 at Section 2.1. The preparation of the master plan (MP1 and MP2) is consistent with the procedural requirements of Sections 19.3.1.4 to 19.3.1.5 of the Strategic Plan. 2.2 ECOLOGICAL VALUES The Site has a range of significant ecological values that need to be carefully considered and incorporated into the planning, development and operation of the Site. These values are summarised below: The Site provides habitat for endemic species and the southern half also functions as an important link between the significant habitats of the National Park to the east and the Wooroi State Forest to the west (the ‘Doonan Link’). Eenie Creek and its associated wetlands, which include the wetlands and drainage lines of the Site, are an integral part of the Noosa River system hydrology and ecology. The Site supports two plant communities of conservation significance whose conservation status has been classified as being ‘Of Concer’ by the Environmental Protection Agency. These are: @ Regional Ecosystem 12.3.5 Paperbark tall open forest with various eucalypt species located adjacent to Eenie Creek, and e Regional Ecosystem 12.3.11 Tall eucalytus woodland with paperbarks in the drainage lines located throughout the lower and poorly-drained parts of the Site. Four wildlife species of conservation significance under the Nature Conservation (Wildlife) Regulation 1994 have been recorded at the Site. These are: © Elf Skink (listed as Rare): Recorded in the flooded gum open forest regrowth in the north-western part of the Site and in the low-lying paperbark/swamp messmate regrowth in the southem part of the Site. © — Sylvia's Blind Snake (listed as Rare): Recorded in the southern part of the Site below RL 3.0 metres. ¢ Wallum Froglets (listed as Vulnerable): Recorded in the paperbark wetlands and the farm dam. * Koala (listed as Common but a ‘special cultural’ species): Recorded in the dry open forest adjacent to the disused quarry in the north-western part of the Site. ‘GADEP \Projects\SBC\Masterplan-FinalA pr04.doc
Page 11
dew CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 8 2.3 CONSTRAINT MAPPING Preparation of MP1 drew from an extensive range of documents that accompanied an application lodged by Montbar Pty Ltd on 30/09/2000. In consultation with the then Department of Communication, Information, Local Government, Planning & Sport and other agencies, the review of the documents led to a request for further information. The information request had not been satisfied at the time the initial Master Plan was prepared. Montbar provided further information; however there was little additional constraint mapping that would assist in the development of this Master Plan. The constraint mapping for Stage 1 indicated that parts of the site intended for development were habitat for the elf skink, which is classified as a rare species under the Nafure Conservation (Wildlife) Regulations. The skink is understood to be associated with the Eucalyptus grandis (Flooded Gum) unit of vegetation on the site. The extent and viability of the skink habitat over the site was not well understood at the time of preparation of MP1. However MP2 has benefited from additional studies carried out into the extent and viability of the elf skink on the site and the broader Noosa area. It is now also believed to inhabit the southem part of the site that is to be protected for environmental purposes. These additional studies have lead to a conclusion that - "There are grounds to reconsider the appropriateness of continuing to class E.graciloides (Elf Skink) as a ‘rare’ species. This new work shows E.graciloides is more common and widespread than has been inferred from museum records and one field study.(Jeanette Covacevich, Senior Curator (vertebrates) Queensland Museum, 6 March 2002). As a result of this study, the Elf Skink is no longer a significant constraint in terms of the master planning of the site. See Council's Minutes dated 11 April 2002. Nevertheless the Elf Skink remains a fauna of significance as does the culturally significant species Koala which has been recorded at the site. Special measures are to be applied to operations that removes habitat of these species to relocate fauna present to a suitable altemative habitat. ‘ Drainage fines through the site were identified in MP1 as key definitional items providing edges to major functions. Therefore the location of the drainage lines has been refined by further field survey of the site and this additional field survey is a consideration of MP2. se Council has named the road proposed in the Strategic Plan to connéct Emu Mountain Road and Eenie Creek Road, as Walter Hay Drive. The alignment of this road across Eenie Creek and through the site has been refined following extensive engineering and environmental assessments. The plan with MP2 reflects a design recommended by Council's traffic consultants and staff. However Council is yet to finally determine the route for Walter Hay Drive and it may vary slightly from the MP2 plan. The size of roundabouts drawn is indicative and will be the subject of more detailed assessment by Council. The major constraints influencing the preparation of the Master Plan are summarised in Table 2.3 GADEP\Projects\SBC\Masterplan-FinalApr04.doc
Page 12
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 9 TABLE 2.3: CONSTRAINTS INFLUENCING THE MASTERPLAN ISSUE CONSTRAINT Flooding No development below RL 3.0 metres Potential Acid Sulphate Soils Avoid exposure of PASS if possible. Otherwise development in accordance with the State Planning Policy on Planning and Managing Development Involving Acid Sulfate Soils Habitat links No development that would place at risk the functioning of the Doonan Link and provision of habitat links for movement of native fauna throughout the Site Eenie Creek and associated wetlands and drainage tines ~ No change in hydrological regimes and water quality of Eenie Creek and its associated wetlands and major drainage lines Vegetation of Conservation Significance - ‘Of Concern’ Regional Ecosystems No development that would place at risk the long term viability and sustainability of ‘Of Concer’ Regional Ecosystems on the Site Fauna of conservation significance No development that would place local populations of these species at risk Proximity of Noosa Airport Types of land use that are able to sustain possible future aircraft noise Values of adjacent Noosa National Park Provision of vegetated buffers adjacent to the national park and provision of habitat links to and from the national park. ‘G:NDEP\Projects\SBC\Masterplan-FinalA pr04.doc
Page 13
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 10 3.0 PLANNING & DESIGN GUIDELINES AND PRINCIPLES 34 GENERAL PRINCIPLES Apart from the planning and design principles flowing from the Strategic Plan (refer to Section 2.1of MP1) and the constraints over the site, there is a range of other principles, opportunities and constraints that have been considered in the development of both MP1 and MP2: a. The site should be developed as a centre of urban design and environmental excellence in both built and natural environments, showcasing the aitributes of the site, the environmental capabilities of the Shire and best practice environmental technologies. Key design elements should include an integrated public transport system including bike and pedestrian pathways; energy-efficient design; the generation of renewable energy; integration between the built form and the landscape fabric; low key informal places; a visual relationship between indoor and outdoor spaces; waste minimisation; and recycling. Open space areas should be located and managed so as to protect the ecological values of the Site and Eenie Creek. They should also provide visual screening, soften the built environment, provide habitat for local fauna and provide a buffer to the Noosa National Park. They should be of a size and shape that facilitates the survival of native vegetation and habitat. Presentation of the site as viewed from Walter Hay Drive in the area of Eenie Creek is of importance. From land to the south at around RL10, the road would drop to a bridge deck level of around RL4 or 5, providing visible sight lines across the Shire Business Centre site. Designations adjacent to Walter Hay Drive provide the opportunity for the character of the adjacent areas to be maintained, thereby providing an open space feel on this entry to Noosa Shire. This character can be reinforced by the frontage treatments along the Shire Business Centre site, with natural vegetation being retained in 5 metre strips near the entry intersections, together with occasional wider areas. Vegetation intended to offer light screening may be in road reserve or park tenure to assist in its retention in a natural state. Development design should incorporate water sensitive urban design principles, including offline and ‘at the source’ treatment, comprising, for example, bio-retention, infiltration, grass swales, vegetated filtration strips and gross pollutant trap devices. The principal measures to address retention of stormwater and water quality from development areas are to be contained within the development sites clear of drainage corridors and open space sub-precincts. The existing drainage corridors proposed to be protected through the site should only be used for final polishing or runoff. There should be no significant change to the existing hydrologic and ecologic regimes across the site. Drainage lines and associated open space through the site should be used as key definitional items providing habitat linkages and edges to major land uses. These drainage lines will need ecologically sensitive enhancement in some places to ensure that the water quality polishing function of the drainage lines is maintained to a high standard. Capacity should be retained on the site in the longer term to take advantage of potential new employment opportunities, as the identification of altemative land for additional employment opportunities in the coastal part of Noosa Shire is already difficult and will become more so in the future. While it is desirable to identify nodes for particular forms of development, it is also desirable to maintain the opportunity for a dynamic mix of development. Development precincts are a convenient way of describing and labelling mapping and associated controls, however some care needs to be exercised to ensure that such precincts are not only read as discrete areas preventing appropriate mix of land uses and integration of functions. it is intended the precincts may include a mix of uses provided there is general compliance with the outcomes sought for the precinct. (This provision is not intended to offer support to any expansion of shops beyond Precinct B1.) GADEP\Projects\SBC\Masterplan-FinalApr04.doc
Page 14
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 il j. The relationship between the main retail areas and open space areas is of importance. In addition, some key employment nodes would benefit from strong relationships with Open space areas. The relationship between the main retail areas and key employment nodes is of importance. The site will be developed at a human scale in keeping with the character of Noosa. The buildings on site will generally be of a low rise form comprising one and two storeys, creating spaces for people that are integrated with the natural environment. The design outcomes for the site should recognize the character of Noosa. Buildings should be of a design recognized as being appropriate to a Noosa location. The western sector of the Shire Business will have uses that are car-oriented and parking areas need a degree of visibility and may be in front of buildings. The eastern sector offers more opportunity for buildings to be the dominant visual feature from the loop road with carparking at the side or rear of buildings. Based on all the considerations above, the following broad concepts have been devised for Stage 2: > > Asimple function layout depicting open space and development precincts and key connectivity - Figure 3.1; and " Asimple traffic layout showing key connectivity and circulation - Figure 3.2. GADEP\Projects\SBC\Masterplan-FinalA pr04.doc
Page 15
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2
FIGURE 3.1 SIMPLE FUNCTION LAYOUT (STAGE 2)
12
DEVELOPMENT
Industrie! Extoche
DEVELOPMENT
SOUTHERN
VN ACCESS ROAD
a
FUNCTIONAL USE
‘G:\DEP\Projects\SBC\Masterplan-FinalApr4.doc
Page 16
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2
FIGURE 3.2 SIMPLE TRAFFIC LAYOUT (STAGE 2)
13
SOUTHERN
ACCESS ROAD
TX
keds) SOUTHERN
ACCESS AND CIRCULATION
‘G:ADEP\Projects\SBC\Masterptan-FinalA pr04.doc
Page 17
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 14 3.2 URBAN DESIGN 3.2.1 Design Workshop A principle purpose of MP2 is to present a refined fayout plan for the Shire Business Centre. To facilitate the preparation of such a plan, Council held a day long workshop on 5 September 2002. A fange of participants were present at the workshop including - > Councillors Council staff > Representatives of property owners and Stockwell (a company proposing to develop part of the Shire Business Centre) > Consultant architects/urban designers > Consultant traffic engineers > Local architects Key outcomes of the workshop were- Apreferred master plan of layout for the various land use elements ‘Identification of preferred locations for a civic precinct and an inter-regional transit facility Some preferred urban design themes Refinement of open space strategies Identification of access issues Improved pedestrian focus More utility to the intemal loop road Better integration of future development and use of the two properties that comprise the Shire Business Centre site ' > Resolution of a connection to the adjoining industrial area vwvvwvVvv WY WY VW The workshop has been followed by further discussion between the architects and traffic engineers to determine whether preferred access arrangements could be resolved. While complete agreement was not reached, access was largely resolved in principle with Council being called upon to determine the placement of the two roundabouts in Walter Hay Drive and the additional access from Eenie Creek Road, which offer access into the site. 3.3 RETAIL DEVELOPMENT Section 19.3.1.2 of the Strategic Plan nominates retail development outcomes for the site of > Retail shops of the order of 15,000m? of floorspace with a discount department store to be in the first stage > Homemaker and showrooms of the order of 10,000m? Council engaged Urban Economics in 1999/2000 to conduct independent investigations on the economic impacts of a development proposal by. Conclusions from those investigations were- > — An 18,300m? sub-regional shopping center has market support for an opening by 2004. > The impact of the sub-regional center can be contained within manageable levels provided the future expansion of the retail network is contained. It is expected the sub-regional center will create an impact upon the retail network [that] falls just short of being significant. During 2004 it can be expected there will be some closures and relocations to the Shire Business Centre. It is expected that all existing retail nodes will continue to perform at their designated function in the retail network. G: \DEP\Projects\SBC\Masterplan-FinalApr04.doe
Page 18
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 15 > The Premium Outlet Centre as proposed in the earlier Montbar application, would compete strongly : with Hastings Street retailers, which target tourists, offering mainly premium brands at low prices. The impact [of the proposed Premium Outlet Centre] upon the Hastings Street retail node is likely to be significant in both dollar values and its ultimate composition. From the above conclusions and in consequence of the Montbar application, the following revised development parameters are concluded as acceptable outcomes for the site- > Retail shops of the order of 18,300m? of floor space with a discount department store to be in the first stage > Homemaker and showrooms of the order of 7,000m? floor space > No Premium Outlet Centre or other significant retail development. 3.4 DEVELOPMENT SEQUENCING , Section 19.3.1.5 of the Strategic Plan calls for the Master Plan to include sequencing guidelines for the overall development, designed to co-ordinate with the construction of roads servicing the site and other relevant issues. The first stage of development will contain a shopping center with a Discount Department Store as called for by the Strategic Plan. That will bring a requirement for a suitable extemal road network and access arrangements into the site. The Strategic Plan nominates that the first stage of development will only proceed after- > The construction of Eenie Creek Road between Eumundi Road and Reef Street [completed 2002] > Commitments being made for the construction of Walter Hay Drive. [This road is the subject of an agreement between Council and Main Roads Department] The internal road system will need to be sufficiently advanced to service a Shopping center, as it is a high generator of traffic. With the first stage there will need to be additional development outcomes as follows- > Anestablished landscape theme for the developed precincts A suitable stormwater management system ‘ Entry treatments Appropriate signage Commencement of the associated pedestrian and bikeway network and related extemal links VvwvVvVvV wv interim transport circulation strategies in the absence of the loop road being complete [The loop road may be completed in stages] > Two accesses into the site are preferred unless Council is satisfied that a single access is acceptable . > Dedication of the lower part of the land as public open space. Community consuttation has indicated a concern that the Shire Business Centre should demonstrate at an early stage that it is to be developed for more employment opportunities than through retailing alone. It would be reasonable for Council to acknowledge those concems and to require that a substantive amount of non-retailing development should take place in the first stage. The minimum standards applicable to this non-retail development are:- : > Anarea of floor space equivalent to 20% of any retail floor space, is fo be constructed prior to such retail development operating; and > 40% of the non-tetail development floor space is to be contracted for sale or lease, prior to the retail development operating. G:\DEP\Projects\SBCMasterplan-FinalApr04.doc
Page 19
ecammatse
rn
{a
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 16
Subsequent development stages will address-
Completion of the access intersections leading into the site
Completion of further stages of the internal loop road
Completion of further stages of development within the sub-precincts
Completion of the pedestrian and bikeway network
Construction of the link road to Rene Street/Production Avenue industrial area
Completion of the stormwater management systems .
Completion of landscaping design elements
vwvvvvv Ww ov
Further dedication of land to public open space.
3.5 TRANSPORT
The following principles should apply to the development of transport infrastructure at the site-
a.
’ The functioning of Eenie Creek Road and Walter Hay Drive are of key importance to traffic flows across
the coastal area of the Shire. The Shire Business Centre site should be designed such that peak traffic
flows to the site do not impact on the wider functions of those roads.
The proposed point for Walter Hay Drive to cross Eenie Creek has been relocated from that shown for
MP1 to a place to the east approximately 140 metres.
There should be deliberate planning for pedestrian and bikeway networks within the site and for
appropriate extemal connections. ‘End of trip’ facilities such as racks, showers and lockers should also be
provided.
The development should be designed on the principle of equity in access opportunities.
Intersections, both internal and external to the Shire Business Centre site should be designed to operate
without the need for traffic lights.
Thete are traffic and economic imperatives that necessitate connectivity between the existing Neosaville
industrial estate and the Shire Business Centre; however the potential for conflict between heavy vehicles
and both other traffic and certain land uses, requires control.
Traffic distribution through the site will benefit from provision of a loop road providing for circulation and
distribution of traffic. . :
Key parking areas need to be located immediately adjacent to key generators. In this respect, the key
generators will be the main retail areas and the key employment nodes.
Pedestrian movements and many bicycle movements between key nodes within the site should be
designated to minimise the need to cross over roads. If road crossovers are necessary, central refuges
should be provided.
Carparking should be designed to avoid the appearance of large carparks. This can be achieved through
landscape and preferably retention of existing established vegetation in key areas to frame the car parking
into almost discrete areas. It is acknowledged that the car parks need to be visible with clear accesses.
Carparking is preferred underground or under buildings for reason of efficiency of land use, weather
protection and an opportunity for more open space to be provided. However it is acknowledged the high
cost of such parking can be prohibitive for the uses proposed, without some other means of
encouragement. Covered parking at ground level can also be considered for the purpose of offering
weather protection. For non-retail development Council is prepared to re-consider the maximum plot ratio
for development if underground or under building parking constructed provided there is also a significant
increase in open space on the site. Retention of existing vegetation is preferred to landscaping treatment
should the circumstances allow.
G:\DEP\Projects\SBC\Masterplan-FinalA pr04.doc
Page 20
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 17 3.6 3.7 k. Access intersections off Walter Hay Drive are to be via roundabouts in the locations identified onMP2 Plan. The form of the access intersection from Eenie Creek Road is yet to be determined by Council. ECOLOGICALLY SUSTAINABLE DEVELOPMENT Development and operation of the Site shall be undertaken in a manner that works within the ecological constraints and does not place ecological values at risk. This approach is reflected in the objectives, intents and performance standards for individual sub-precincts (see Table 4.3). Additionally, the first 2 design principles of Section 3.1 nominate - > The site should be developed as a centre of urban design and environmental excellence in both built and natural environments, showcasing the attributes of the site, the environmental capabilities of the Shire and best practice environmental technologies. > Key design elements should include an integrated public transport system including bike and pedestrian pathways; energy-efficient design; the generation of renewable energy; integration between the built form and the landscape fabric; low key informal places: a visual relationship between indoor and outdoor spaces; waste minimisation; and recycling. These general principles are to be extended into the design approaches for buildings and sites and also _ into the management phases after operations commence. Development applications will be assessed for attention to these principles and appropriate conditions will be imposed on approvals fo achieve these / outcomes. Environmental management plans will be prepared for all stages of development. Additional development concepts supportive of ESD principles are to be adopted by developers wherever practicable and shall include- > Apreference for energy efficient building material, including choice of glass > Installation of energy efficient hot water systems, preferably solar for small scale water usage or heat pump Use of grid-connected photovoltaic devices and associated community education Use of low energy lighting systems and maximized use of natural light Passive solar designs and best practice low consumption power needs Cross ventilation techniques to minimize air-conditioning requirements Window openings to be optimize natural light and to be screened for balance of light and heat Solar panels to be located to cause no reflective glare nuisance VVV VV VV Installation of water re-use tanks for landscaping > Use of appliances having the most favourable energy rating. OPEN SPACE AND LANDSCAPING Open space has important functions for the site. In the southem part the land is constrained for development due to flood potential and environmental reasons. This area should be retained in its natural state and dedicated for public open space. It will form an important character element for the site and eniry to the Shire along Walter Hay Drive. GADEP\Projects\SBC\Masterplan-FinalApr04,doc
Page 21
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 18 Walter Hay Drive and Eenie Creek Road are the principal frontage roads to the site. They also serve high order functions in the transport network. No development is to have direct access to those roads. In addition it is desirable to screen development from those roads so as fo ensure development has an intemal focus. (See Strategic Plan 19.3.1.8) The design workshop of 5 September 2002 discussed the extent of this landscape and concluded a complete screening of all development was not desirable, as it is important that the site be identifiable because of its prominent role. Nevertheless a minimum width of 5 metres of existing vegetation is to be retained near the entry roads and this width may expand to 10 metres in between those access points. To maintain the vegetation in a natural state in the long term, Council requires that part of OS3 containing vegetation to be protected is to be contained in a park reserve or otherwise secured for open space purposes in the long term (eg. environmental covenant). Sub-precincts B1-3, E1-7 and RES are required to provide a minimum area of open space. The intent of those open space areas is to provide a vegetated setting for development but also to give consideration to potential habitat and fauna corridor functions linking to Open Space Precincts and the open space areas within each of the adjacent development sub-precincts. It is acknowledged that substantial parts of the open space within the sub- precincts will be re-planted for landscaping effect. The location of Walter Hay Drive creates a small precinct in the northeastem sector of the site. This land is constrained by - > - Shape > — Access > Proximity to National Park (buffering on site will be required) > Separation from other development precincts . / This area has been determined to have limited development potential and would most usefully serve as an addition to the National Park. It can alternatively be considered for a small-scale recreation use or mixed use development, upon Council being satisfied the above constraints are satisfactorily accommodated and the values ’ of the National Park are not impacted to any measurable degree. A recreation use could be beneficial to the functions of the balance of the Shire Business Centre. In reflection of this the land has been designated Recreation/Mixed Use, but with buffer areas adjacent to the national park included in Sub-Precinct OS1. This master plan also carries forward the intent of MP1 concerning the retention of existing defined drainage paths. Additional survey work has demonstrated the open space area shown as Precincts OS5 and OS6 on MP1 do not contain a well defined drainage corridor. MP2 proposes a different approach in this area and seeks the retention of a lesser extent of open space land that is to perform a role of a character element - separating differing land use types. Landscaping treatment of the drainage corridors and other parts are to be designed with water quality objectives in mind. Landscape treatments in the more urbanised parts of the site may include water elements. - : The three entry roads into the site are to be distinguished by landscape treatment. This treatment as with all landscaped areas shall be consistent with the adopted landscaping policies of Council. Landscaping should retain existing vegetation where practicable. GADEP\Projects\SBC\Masterplan-FinalA pr04.doc
Page 22
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 19 4.0 MASTER PLAN OUTCOMES: STAGE 2 44 4.2 In this section, the master planning outcomes for Stage 2 are described. These outcomes have been derived from the master planning outcomes for Stage 1 and then further refined by Stage 2. MP2 PLAN MP2 Stage 2 plan is derived from the simple concepts provided in Figure 3.1 and Figure 3.2. It provides a more detailed plan for the site and the roads about the site. An A3 version is found at the end of this document. MP2 Stage 2 plan contains considerably more design detail than MP1. This plan together with MP1 meet the requirements of the Strategic Plan and the development principles established in Section 3. Boundaries between precincts, areas of precincts and the location of proposed roads and intersections have been refined from the Stage 1 Master Plan but they are still conceptual to a degree. Final boundaries will be determined in conjunction with decision-making on appropriate development applications. COMPONENTS OF THE MP2 PLAN Table 4.1 shows the elements indicated on MP2 Plan including their map object number, primary function, secondary function and area. The primary and secondary functions are intended to indicate the dominant activities within precincts and sub-precincts. The precincts and sub-precincts are not intended to define discrete boundaries for the various functions, however the control of the scale of some of these functions will be of importance, MP2 Plan and Table 4.1 contain the following elements: a. A Business Precinct comprising a total of 3 sub-precincts totalling 12.1 hectares and allocated for future business growth areas of Noosa Shire. The Business Precinct would include the highest order of retail development in the Shire and significant vehicle parking. b. An Employment Precinct comprising a total of 7 sub-precincts totalling 20.0 hectares and allocated for future employment growth. The Employment Precinct includes 3 sub-precincts with preferred themes. The themes are not mandatory and the intent is to allow these sub-precincts to take advantage of new employment opportunities, as and when they arise. .¢. An Open Space Precinct comprising a total of 7 sub-precincts- totalling 29.6 hectares and allocated for a Tange of open space functions. Some of these functions would see the land left in its natural state with little human use, whilst others would see significant modification to the natural form and significant human use. The Open Space Precinct includes an extensive area that would continue to serve as an ecological corridor along and buffer to Eenie Creek. The open space precinct acknowledges that it is part of a wider open space resource which includes the National Park and Lake Weyba. d. A Residential Precinct comprising 0.7 hectares. The precinct is intended to provide support accommodation fo the other key sub-precincts. e. A Civic designation located between the principal retailing precinct and the northem entry road from Walter Hay Drive. Council established a Civic Precinct Working Group fo investigate the type of function that Council would consider on the'site. The Group reported its findings to Council and nominated the following activities for further assessment - Central library Art gallery Performing arts center Community radio and sound studio Council one-stop shop Tourist information center Heritage interpretative center Inter-regional transit center Park and ride facilities Community meeting and gathering spaces Public art, sculptures and murals Outdoor street entertainment VVVVVVVVV VV Vv GADEP\Projects\SBC\Masterplan-FinalA pr04.doc
Page 23
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 20 f. A Recreation/Mixed Use Precinct comprising 1.5 hectares in the north east of the site. This site has constraints and any development must satisfactorily address those failing which the land should remain open space. . The site has potential for an inter-regional transit facility. MP2 recognises this by including a Transit designation for such a facility near the northem entry road from Walter Hay Drive. Key extemal roads are Eenie Creek Road and Walter Hay Drive, respectively. Intersections with these roads will be by way of roundabout, where this can be achieved to meet acceptable traffic management practices. Access from Eenie Creek Road in the north west sector has not been resolved. [See section 3.5.k] Key Vehicular Access Points Key intemal Loop Road Key Pedestrian and Bikeway Linkages. G:ADEP\Projects\SBC\Masterplan-FinalApr04.doc
Page 24
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 21 TABLE 4.1 PRECINCTS BY PRIMARY FUNCTION, SECONDARY FUNCTION & AREA _ GADEP'Projects\SBC\Masterplan-FinalApr04.doc
Page 25
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 22 43 KEY DEVELOPMENT CHARACTERISTICS BY SUB-PRECINCT & TRAFFIC TYPE — For the purposes of this Master Plan, a range of land uses defined within the Schedule fo the Planning Scheme, have been condensed to a nested series of definitions relating to the primary and secondary functions defined by MP2 Plan and Table 4.1. These are indicated in Table 4.2. Note that the land uses indicated in the final column are the principal definitions only. Other land uses that are not listed in Table 4.2 may occur, though these functions would not be dominant in the precincts in which they occur. The discussion in this Master Plan provides a guide to the use intentions associated with the defined precincts and the scale of development intended for each of the sub-precincts. Final outcomes will be determined by decisions on any relevant development application and by the new Planning Scheme. Table 4.3 defines the key development characteristics anticipated for the various sub-precincis and includes the following components: vVvvvVv wv Sub-Precinct: The sub-precinct number on MP2 Plan. Primary Function: The primary function from Table 4.2. Secondary Function: The secondary function from Table 4.2. ‘Objective: The objective for the particular sub-precinct. Process Principles: Initial Integrated Development Assessment System processes under the Integrated — Planning Act for key forms of development (material changes of use and reconfiguration). Material changes of use based on land uses indicated in Table 4.2 and reconfiguration only are considered. For changes of use to functions not consistent.with Table 4.2, the impact assessment process is fo be followed. Note that the provisions focus on the principles for each sub-precinct and more detail on the exact process for all development will be a necessary consideration of any relevant development application. It is possible that as part of the new planning scheme, the assessment levels of some forms of preferred development (ie business uses) will be changed from impact assessment to code assessment. Strategic Plan Provisions: The Strategic Plan provisions that have direct influence on issues associated with the sub-precinct. There will be many other provisions of the Strategic Plan that apply, however these will have generic application over thie whole of the Shire Business Centre site. Intent & Performance Standards: An intent statement or description for the particular sub-precinct, followed by a series of performance standards. The performance standards are generally structured on the basis of: Development scale, using floor space, site cover and plot ratio techniques, > Connectivity in visual and pedestrian/bikeway terms; > Parking; [Car parking will be assessed against the provisions of the Planning Scheme] > Timing; and > Use relationships. G:\DEP\Projects\SBC\Masterplan-FinalApr04.doc
Page 26
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 TABLE 4.2 PRIMARY & SECONDARY FUNCTIONS & PLANNING SCHEME DEFINITIONS GADEP\Projects\SBC\Masterplan-FinalApr04.doc 23
Page 27
sop poidyyeus-uadinsey~yjas\salandaa\:D
“Hey)o} 09 9nd Aue jo seve et) “p
40 ‘ezeid pedeospue] 10 opeaus ‘reAo} uoUIUCD Aue jo Spee Bl) “OD
‘oypeyg so sovealpeys Aus jo owen ou “q
‘heays yoourday Aue 2 peyeooy swool yueUudinbse Jo yunyd pea} goeK@ 40 /Bo|EYDeUL 40190 40 BuyUORIPUOD J “SUOO JOU ‘stwORN yy AUB jo (SLLUNJOD PUB SyOM ye Jo eALenjoUy) sea oY
~oprjou] ou seop une} elf yelp pepyrasd ‘esodind
‘eu 6 20} 8 10} pepuayU 10 pSsn OBye 8] YA eys O1p Jo BENE Jotgo AUB sryd esodind seInaped & 20} esn 49} PepLieyUl Jo pean g] YOY SBUIP|NG 40 Buypyng w Jo Skekqs ye JO (suLI|oD UB BijeM Ys Jo GNSTHEXS) GELE GIA Jo UND Blt celustog BURLEY OID cH EINPEYDS ety UI pollysp ULE} & H] GEIB ESN |mOY ,
“YNL z4I000'y 0} dn eoeds Joo solo angegsjuwpe PUR [PIUSLUWOD "p
‘Spe
pue yodsuey snq ‘sjsijafo ‘suzigsapad Jo} uorsiaoud ayenbape aepnjoul yeys seaze Gupped oy jo uBjsap ey ‘>
"SOSSBO0B JE0}0 YIM BIGISIA 8q 0} pasu syed 19 pebpeymouyoe s}3j ‘seaue sjavos\p ysousje Opt Bupped Jeo a1p
auey 0} seaxe Aay ul dogzjaBen paysyqgsa Bugspe jo uoquayes Aigesayaid pue adeospue] yGnor) poreiype
aq ueO styj “yled Jeo ejGujs efie] eyo sourreedde eu plone 0} aq jes uBisap at jo engoelqo jueodu UY ‘q
“PalOAdd Os|MIalyo
40 Guypyng e Japun ‘jana juswoseq ye aq 0} Bupued up jo wed fequeysqns & Jo} eiqeysep s| | ‘PEO! doo]
ely Buoje payeoo| sseove yo sulod Arewud ym ’L3 pue ‘7g ‘La syupelg-qng Gujpjues sapoe} Huped “e
“eyqeyene
$j pus} #! suogouny eoyjo £q 0}
pappe oq Kim same} eseyL
“(vn11) eaue asn jejon 2wi90¢'g} 0} dn eoeds Jooy doys *e
‘uoisia o85}2.95
ANUS @4 UILAPA SONIA e100 PayquEp! Oty Oye! ILM spiepuE|s UB;sep sy “Jegue}od JUewdojanap Jo ejeOs
@IBINSUALULUOD 2 Sey YONs se pUe els aAUED SSELISNG SsIUS OU] JO BO f[e}aJ aly SesdWOd |g JOUIAg-aNS
61 e6L TLE6)
S| Jet uBisap engouysip
Ul SORIOB} (IEJeu JOp1o
ySOYBly Oy) JO UOISIAQL
‘(euoys quauedap
juneosip e Buipnjouy
sdoys) ssousng
pue aqued 1leey
“@Us |}e19A0 Bu) YGnoU] S}YEWeEAOW UeLSEpad pue ‘sawayos Gunyed ‘UeWebeueW oWey 4
JO uoperado jryssaoons e1y 0} jeonLO s| Bujuogoury sy ‘eys aqueg sseusng eulyS og Jo e100 a sesudWod | = EOLZ'TYOLL | JUDelg-qng ul Juewdojnap
2q Joupelg-qng ‘13 pue 4g sjoupald-qng yy Guojy “Bupyed seo Jo} apew s| uo|s|Aoud Jaye efqeyene | ‘BL'C'BL = “LLL C6} 1}}94 10} sseooe pue (ey }'€) S200
S| puej ¥] SBOWO Je}OIeWWOS jeUORIPPe YIM JOUpeld pejUeLO Bupyed 4eO e sesudWoo 7 yUIDed-GAS ‘BL ESL TLCS) | ‘Sunped jedupd jo voysinorg | pue Gupyed se ssoulsng za
"%G] Jo Base aoeds Uado WINWIUIU! e SAY |IEYS {J2IGA0 JOUISa!Y-qng ot
Jey Popinosd youelg-qng ou) UILAIM o11s JuswUdo}enap Aue Jo Bale Oty JO %0} oq Ae eoeds Uedo LuNUITUI ‘|
quawdojanep jo obeys:
JS1y OU JO SYS aj JO Jed WO} O} EVE 'Zq JOUIDaLG-Gng IpIM JeiBebo} ‘|g JOUDeL-Gng ‘swe Uelq 68}e9S
SU] UM BOURPIODE Ut G|YS otf Jo UOREIndod ain Jo speet OLA ULI JUA}sSIsuOD ‘pafe}s oq oj JUsLUdOjeAaq *Y
'-Zqyoulpaly-qng Uy saqwioey Bupyed Jo Led se pepjrcid oq jym Gupped seynoiyen ysoyy 6
‘Za pue 13 ‘eg ‘Za Sjouloaig-qng ym Agoauuoo Aemayig pue ueLseped Bucys oney 0} }UaWIdO}anaCy
‘sjoupald juawAordWs puE SSO PUR Ed ‘Za SJOUWald-gng Upim seBeyUI| ensiA Buogs aney Oo} Jueuidojenag ‘e “sounyeey oe
Burpang * {e00} pue uonejaBan
ened skaloys 7 pue ye site! ypu ° ‘oyydeiBodo s aus exp qa
1.670 0} dn pauiquiod 7g PUB 1A SJOUISId-GNS UILIM JUBLUGO|EASP JO} ONES Yih payesBayut si pue snooy
“YALL W000 ‘¢ 0} dn eoeds JoOY soLjo eATeASIUIupe pue jeloreWUWOD *q JOOpyno UB sey ‘enbiun teu pe)
SLONIOJUd-ENS ‘NV Id YSLSVW JYLNAD SSSNISNE FYIHS 2’ JTEVL
7 a8elg - URld JISeIA] ABAD ssaujsng ays “SAYNLAI ONISOOHO
dd
J
Po ad
Page 28
Sop pordyTEULs-umdinsep\agsisofegdaC\:D Sei}SU 9 JO J8P40 tp JO yORGHeS e YIM Peds doo] a49 0} UORE|Uaseld e eneY Oo} Ayeiouab ave sBulpyng -e “s6uypyng yo ypeeurepun 40 429s ‘opis ou ye Ajeioues ‘ey[s uo Jo} pepiaoud 8q 0} S| Bupyeg ‘p "60S UeY s8}2016 OU Jo Jon sys © PUP 9°0 J0 Jeplo 81f Jo payedionue aq pinow oujpeld-qns euy ung yuoUudajanap Joy OpBSJold ‘epinB e sy ‘0 ‘sasodind 21A/9 10} apjse yes joueid feursyuy Joy/ews e uleWuoD Aew uoADes WeyIOU ayL “q " ‘Suogeoldde oypads uo peurwuayep aq jn ‘SuogedO}|2 soeds J00]4 ‘2 “Bumos oxy sped e uj undo jun Juetudojenep yeup payoadxe s| “ays aqued ssoujsng SINS 24} 30 a100 at) sesudiuoo | 3 J0UeLd-Gng ‘Zg pue Lg sfoUDelc-qng in Buo}Y “seISNIO YM si0}9es DUE SSBUISNG J84NO YDIYA O) ‘B’lYs BUY UJ SSBU)SNq Jo JOjOas mau e Uy JUEUA) uaUUAO|duE Jolew e ‘@pnjout |sn ely paloedye 51] “ais aqueg ssauisng eulyg auy 40 e109 juouiKo}dwe jeques euy sasuduioo ba youparg-qng aves ‘obe6l THESE “sey|snpu; eBpaynouy MOU Ul SpoujUaWAO|dwe Aan @ J0 UoisiAddg (ey 0%) SIND PUB SedIC, ‘ssaulsng ‘G2 y paseg -ABojouyoe, quawhoydw }3 "%eG) 40 Boxe eoeds ado wnusuyu e aAeY eYs BIEAO JoU;DeIZ-ang aL) JEU Pepinoud Jouerg-qng stp ulALM ays quewidojensp Aue Jo eaue elg jo %O1 0g Aew eoeds uado wnwjuIyy | “ofe]s ys1y 84j Jo Hed aq 0} sjuatuaja ssaulsng pue seowo jfeJeL-UOU Saynbes found yng ‘pabeys aq Aew quauidojeneg *y ‘iJS-LO pepyold oq jm Bunyed sejno}ya, °6 , “POY 9810 aluay “Aeioys 2 — | Apesous8 jo sjyBiey Buipyng ‘9 “8'0 1 dn jouaid-gns elp usipiM uauidojenep 40} o922 014 “Dp “¥N.L 2441000'9 0) dn eoedsiooy ssoujsng ‘9 “WNL 2000's 0} dh eoeds sooy doyo exgensiujwpe pue [efaxetuLU0d °q “WAL 2tH1000'2 0} dn soeds soy sayeusouoyuooIMOYS *e ‘peO1 eUY Woy AeMe Uuny jm UoLUdojenap ‘peOY yBe1D eIUAZ o] aso} lj SeOLE OsoIN JO OWIOS ISHLIN, Jai18 enue) SsoUisnA sug Sy UO Sommoey eoWo pue woOWMOYs Jo; semUNoddo sepInosd gq JoUIDeLg-4ng ‘SV ee) 61 e6L ‘They “Bumes sejnpow uedo ue uj somliney wooumoys ue S800 J0__UOIS|AOI (ey €'¢) ssauisng pue S80Q ‘WooumoYs ssauisng ea "S| JO Bave aoeds Lado WNWUIW B ANEY [feYs 1JeI9A0 JOUINaLg-qng ayy Jeu) Papyroid youpadg-ang tp UII eYS quewdojeaap Aue Jo Bare otf jo 940) @q Aew aoeds uedo WNuTUHy wauidojenap yo aBeys y21y 819 J0 ols Oif Jo Wed WO} 0} axe ‘Lg JOUPaLg-qNg YUM saLpoBo) ‘2g JoUIDeId-aNg “y ba pue Zs0 eg ‘18 Soupsid-ang Uy Aynpoauuco Kemariq pue ueyyseped pue sofeyuy ensin Buogs aney 0} uewdojenaq *B “sKeso}s Z 0} dn jo s}yBjay Buypyng “1°00 dn pourquico zg pue 1a SJOUIAe|-GNG U}UpIAh JUSLUGO|OASp. 10} OI JO}qj “9 SZ 7 aes - ued sIsePY aNUOL ssousng amTYS ‘SHUNLNA ONISOOHD
Page 29
dop podypems-uadinse\ asad aD
“eyIS-UO papyroud aq jim Gupped Jenayen “O
‘oMoy
0} pug; jeLgsnpu! pue pF JOU_Ald-qng Yun AyARoaUUCS AemaNLG pue UeLNseped BuoYs eney 0} JuaUIdo|enEq *g
‘euoz Agsnpuy ey) Uj PEpN;oU! a1eM pue] a4 1! se “oUNaYOS BuWUE|, atp 0} aINpayog Ol JO ¥°g
YOROSS UILAIM peule}uCe spyepueys soUeWOLed ey; 07 }0eIgGns Ajjezouab s| JoUeud-qns s{yy Ul JUstUdojaneg “e
. ‘sjoujaud-qns eyo uj uaurdojanep YpIAK
Aynqgeduico Buunsus uy si0joRy Aoy 9q |}IM OUjIeId-qns sity Uj seplAgoe Aue Jo UOREsedo pue UBjsap ‘asmeU
OU ‘ays aNUEd SsouIsng aulys ey) UIA suoROUTY eoeds Vado pUe sseuIsng auy 0} 459M Oly Uy PUB] [eL}SNpUl quourdojnap
Sunjuy ul suyojed ays sip ajo) alg azjuBooe, snw jousald-qns siup uj JUaudojeAeq “eoUN||soxe je|ueLUUOAUE Ue UYOIeASOL [EJVELIUOIAUS (ey 6'f) S90WO
Bujowiord se vogisod saulus esooN BuRowoJd pue seave Gu|puNoUNs jo AIAMIsuaS otj UpiMA GoURpio90e aL est Uo paseq apou yuewAo|dwe pue ssaujsng ‘q
Uy BUWZOLR EIUSLUONAUA UE MO}|O IM JeUy apoU JusLUAo|dwe Ue Jo} AyuNPOddo Ue seprAdid E3 JOUald-GNg ‘eLe'6) ZV EOL fey 240 uojstAol | 7 y feyUaWUONAUS quewAodw3 ca
“%G1, Jo Bale aoeds uado WNW]UWD B aABY EUS ]BI2A0 youypeid-qng eu
JEM papiAoid ouoaig-qng eyy UUM ells JuaLdojanep Aue Jo eave eip Jo %0} ©q Aew aoeds vedo WML ‘|
“eq pue
La Siourpald -Gng u!uewdoysrep wins sdjysuogejed ueoyuBis ney jan oUeUd-gns syip U) JUeUUdo}anad ‘|
‘p29U JeYIEU UNM JWas{suOD pabeys aq 0} pejoedxe juaUudo}anaq “Y
“Gay PUE 13 ‘LE Sjoupeld-gng yum AyanoauUOD Aemeyig pue UeUIseped Buds enzy oj uawudojenad] ‘6
"STU Pue ZSO ‘La Sjoujpald-gng tym saBexul| ensiA Buogs erey 0} yuauIdojenag '}
sheuoys ¢ 0}. dn syfioy Suipyng awos wpm ‘sKesoys Z pue | Jo syyBjey Bulpling “e
SOO g JO JeplO at Jo yoRdes e UpiM peo doo] oYy o} vOREUSseLd e ney O} AjeIOUEB eve sGuIpNg ‘P
“sBuypyng Jo Yeewopun Jo seas ‘apis ay 12 AyeraUAB ‘o\s UO Jo} papiaoid aq o} sj Bupyeg “o
“0G UeY) J9}20J5 OU Jo J8A02 EUS :
© pue 9°0 JO Jepu0 919 Jo payedigque aq pinom youjvaid-qns aup Lyn yuaWudo|eAEp Jo} oneL joId “apinB e sy “q . aUiaLy /eWUSWUOSAUS
“suoqeoydde oyjoeds uo peuluejep aq Im SuORedOI|e a0eds JOO}4"e pale voseeees aun (By 6°t) emo
“suoyoey Aoy a1@ Zg pue | SDUIELd pue eageonpe 94) pue ssauisng 'q
-gng } Aywipoud sy pue [3 sjoujseig-dng Jo Jety pue epou sin UBaMjeq PeUO} SuONI|OSse sseuisng oq ZiT'e'6L | UopaseqepouyuewXode | gy [e]UeUNUO,AUZ
ws auarn 11H payoadxe 8) 3] ‘sweU_ eATeONpa Ue WY apoU JUEUUAO;dwe feNUAD e sesudIOD 7x JUIDeLd-aNS ‘SLEesl ZL EEL Koy 8 J0 UOISINO pue aageonpy quewXodw3 za
"G1 Jo Boe eoeds uedo WNWIURU e eAey Heys EIEN JoUjDaLd-Gng ayy
yeu papjaaud joujgesg-qng arp urLAIM aj1s JuaUUdoJenap Aue Jo Bale ety JO % 0} oq A@W eoeds Uado WNLUUIN “y
‘Za pue
1d sloujgaig ~qng ul juauidojenap iam sdjusuowejar jueoyiusis anzy (pm oujoeud-qns siup uj usUdo|andd “|
“paau JaPeW fim jUsysisuoo pabeys oq 0} payedxe yuauidojeneq ‘|
“9a pue 7g ‘1g sloulsalg-qng YIM Alngoouuod Aenaylg pue uelseped Buos enzy 0) uetUdojeAaq "Y
‘Ty pue JSO ‘1g sjoulaig-qng Um sabexu jensin Bucs aney oj] Juaudojaneg “6
sKasays ¢ 0} dn sqybiey Buping ewos yaya ‘skauoys z pue | jo'sjusiay GupIng +
97 . : 7 a8uIg - UR] _ Joye] BUSH ssoutsng eiYs :SAAN.LAA ONISOOHD
Sy TT ae
Page 30
oP pod yeu ue diaasep\OES\IOAfOIAdACD
“Fa oupeld “ang ul jueudoranep tum sdysuopeyey jueoMUBis eney wm sjouDeLd-qns osaug ul adorned {
; “P8sU JaXHeW IpiM Jwalsisuco pabe}s aq 0} pojsedxa Wewdojarag ‘|
“Fa PUR }@ Stoupald-ang Yum Ayagosuuco Kemeylg pue uewseped Buoys enzy 0} uawidofeneg "y
‘CSO ue }SO ‘13 slupeid-qng win sabeyur jensia Buogs eney 0} uawdojensq “6
“shauoys Z pue | J0 syyBjey Suipung +
Sed}SU 9 JO s8p10 aif JO EqIes B YIM peor doo] au} 0} UogeyUasaid B aneY O} Ayerauai ase sBulpyng ‘e
“sBurping Jo yeswiepun Jo seed ‘apis at ye Ayesauabi ‘es uo so) papiaid eq 0} s} Buppeg "p
“%0G UeIy Je}20I6 OU 30 JeACO ays
© DUE Q'0 JO JapuO atp Jo peyedioque 3q pinom joujaud-qns aug UjupiM Juatudojangp 40) one yojd ‘apinB e sy ‘0
“suogeaiidde oyioads uo paujwuie}ap aq [IM Suoqeooye aoeds Joo B
‘12 Pupald-qng pue spou sig useMjeq peLiUoy aq |IM SuoHEINOSse ssauisng
Jet PUE Sesn Jo aIMXIUI & aq jm asaLY JeUY payadxe $1] “aqueg ssauisng eyyg oy} Jo SaBEys EVE] oY Ul
padojenap ag Aew yey semunpoddo juawAo}dwe peyioadsun um apou e Ssudwoo /3 pue 93 sjouIDalg-qng
oh eer
‘SL eG) TVE6L
93 U Ayjoes ysueg jeuojGer
~19]U| UB pue seae ssoulsnq
peyfoodsun wy seqiuntoddo
JUSUAO}GUE JO UOISIACLY
(eusee
By }'¢) ysuel) pue
SeOWO ‘sseuisng
quewAo\dw3
23399
"%S| 40 Bale eoeds vedo wnuyuju B aney jes YeLOAO JoUINSLY-gng YoeE Jeu
Pepirosd sjoujoalg-qng at) UIA els yuauudoanap Aue jo Bove aug Jo %O} eq Aew aoeds uado wunWUIUIY +}
“eg Puppalg-gng Jo qweudojenep
juawejdwoo 0} Atagoe ssauisng jo eoueuIWop e aney AeW G3 JoUDAld Ul ]UELIdojanep Pletal sip uy
“2G PoU|Deld -qNg UW JUaUIdo}enep YM sdlysuOREFo. UBOYJUBis eAeY {INA sjoujsaud-qns esaty ul jueudojanag “a
“skeuois Z pue |, 40 sqy6ioy Bupyng “p
“alls-U0 papincid oq jum Gupyed sejnaiya, “9
“Ga PUe Lg JoUDalg-ang ym Aunjostuc Aemanig pue ueysepad Buogs eney 0 uaudojaneq “q
“eu0z Aasnpul ey} Ui papnjoul eiem pug} alp.y se ‘eweyog BuLUE|g alg a} sinpeyog U1 JO 7'9 uORSaS
UILAIM paule]Uo sprepuE}s eouEWWOLed aug 0} joalgns Ayelauas s} sjoupard-qns esau] ui juawdojeneg “e
“sjouaud-qns Jayjo
uj quawudojenep yum Aynqgeduico Buunsua ut sicjoey Aey oq jim Joureud-qns sitp uw! saianoe Aue Jo uogezedo
pue ublsep ‘oumeu sy) “eys aqueg sseulsng sus auf UUM Suogouny eoeds uado pue ssoursng ey 0) sam
1p U} pue| eLysnpU) Buu Uj uuOWed says asatg 9Jo) ety ezjuBooe! sn syoujsaid-qns esay} ul juswdojeneq
2}2/89 JELISNPU] SIJAESOON alg 30 UOISUedXe 10) AyuNPOddo ALY epinoid G3 pue y9 sloupeig-ang
cb Leb
‘GL e6) She}
“sasodind
sseuisng pue jejsnpuy
10} pue| [EUORIPPE JO UOIS|AOIy
{eu +79 467)
pue AQsnpuy
quawAojdwy
EFERE!
"%G| 30 Beve eoeds ued wnWIUjU e Srey |JeYs [[eIEA0 joUNaLg-Gng eu}
Jeu Papyrcud Jou}ANd-qng OU UILAIM al[s USLUdOJOnap Aue Jo ReIe 94 $0 %OL oq ABU eoeds uado wnuNUyy -B
‘ZSO oupeig-gng Buyujofpe sep o uoRouny eoeds uado ap eBpaymouype jim uawudojeneq +}
“al }oupeld ~qng ul juawdojerep yA sdiysuopeja, jueoyubys anzy ja oUIoaid-qns siuy u} JsWidojenag “e
. “__sfaio}8 Z pue {30 sjusiey Bupyna “p
L@
Z adeIg - UR] IOISeY eNUAD ssoursng ays ‘SHUNLAA ONISOOHD
Page 31
Sop yoidyreups-uEjdiase MAS swalOrd\gAGo “pepnjoesd oq jI1* ‘sesodind juowebeuew jejusuuOJAUe fenUaSse JO} Wow ede ‘sseo0R JeINDIYaA ‘p “sxe payeublsep 0} pay] 9q 0} | ssa00e UeLISSpad “9 “sasodind Juawebeuew jejuewuc)AUS [eguesse Jo) 10 sage ueujsaped Jo} syoey JO} }deoxe yuaudojenep ON “G “-asn pasodoud ue jo ainjeu oig uo Buipuedep diysseumo oyenud uy ajgeydaooe aq Aew jouloaig asf) PaxiA/UONeaioey oYy 0} JUSTElpE JoUIDS/g-Gng ayy Jo Wed Jeu) “sasodind aoeds uado Jo} yourog JO UMOID BLf 0} PEyBo|pEp eq O} | ZSO PUR [SO S}UNAld-qng uIUpIM pueT "e “BYS aQUSD Ssauisng SYS au} Jo YUoWwaGbeUeW |jexeN0 ayy Oo} saGueyeYO Aay eplAoud tun UORE}OBOA Otf JO Guy jevolseood Jo} peou jejuaWUOJAUS Sy} pUe AiARoe UeUINY U] @SeesDU] BY Wed |EUOHEN ay} JeHNG 0} dey pue (ey2ug pulig s,21AIIS pue J2/Bo1 WnyeNy “UNIS 313 Olp JeINOQIEd Ul) eoURdYJUBis UoReALesUCD Jo equpyin yoajoud 0} SJur] UeUOO ayy WeyUEW O} “Yeex) a1UEq Ul Ayjenb Je}em JoRjOud diay oy ‘eoucoyubis UOHEAIESUOD 40 SIEIIQEY pue SoAIUNWIOD JUeId ;O8}014 0} PapuayU] ae ZSO pue |SO syupard-qns ZELCGL ‘LLL e6L “2q2}S euNyeU ap 0} 8]q/ssod se Jeau se Seale aSalQ UjeyUIeW Pure JosjONd O} 8] exgoaiqo ay "9940 2lUa3 0} soeds vedo uevedy & pue JHE JEUOREN BSOON St) O} ‘Ayngoouuiod Jopyioo Bujpynoad soBexuy) eoeds uede Aay ase Keyl “us 84) J0 Sanjer feoiBojooa Aoy 94 udiepun seaie aoeds udo esau} (eugz ey €'L}) kequewuoAuy goeds uedQ 2SO 8 1SO “%G] JO Baue soeds uedo WNUURY B SARL s[EYS |]BIAAO JOUaLg-QNS You jeu} Pepiaoid sjourpaig-qng aty ULM ayIs JUaUdojanep Aue Jo Bare auf Jo % 0}, aq Ae eoeds uedo WNLU|UIY “Wh zso youPpald-qng Bujwjofpe aug jo uopouny aoeds uedo ely efpaymouyoe jm 23 JoUINIY-qng ul juALUdo}aAaC ‘| : : “Ayyoes suey uo|GosJezul Ue Joy epise jes joUjpaud jewoyul JoReUIS e UE AeUI G3 JOUIDeIg-qng Jo UORIES WeYLOU OYE °y Z oeIg - Ue] g IONS] aNJUD ssauIsNg ONYS ‘SHUALAA DNISOOHO poner on wd oy seyereney Aj J od
Page 32
67
» —oo too ft! f Co [. { [ f° f | [ [. Lo. Lo.
op old yeu E-uEdiasey\ag\soefarg aaa
-"S80N8S
40 uolsiaald aig yBnouty snogo Aew eouequnysip soujw ewos yBnoly peurE;ad 8q 0} S| uopeyeBen Bugsy 'e
“sebeyuy euqey
Fewaquy apinoud 0} papusjul osje are kay, “S31 Pue py ‘Eq SJouDarg-qng u] JuaWdoJenap 105 pue peo! doo} (ey
if UO o4yes} Jo} ouBIa}e) PUB atWEy |eNsIA B UI ISISSE 0} @1e seaLe say) “sjoUPaid UEEMIEG pe PEO! doo} eos doo} jewenui ain 0} Bueuing | Z'9g ey 7’0) Ajueuty
Jewioyu] 249 JO Ved oy uede[pe yuawele eoeds uado Ue ajeal0 0} 51 9SQ PUE GEO SJOUALd-GNS Jo WsyU ay SEG) | sdeospurl jueomudis jo uojsinoug | jensin yo uoyeAaseld | ooeds ued | 950 # sso
‘ays
91g yBnoiy) sasodind oyeyysee
49) oeds uedo Key Buipiaord
SB JOM Se ‘YOUNL JO}EMUWLIOYS
payee Aisnojaaud Buysyod
Joy siyed eBeureip apinoid 0}
| Pue sanjea jeoiGojoos ay yoojoud
0] aye sengoa|go oy ‘sjaiBox4
UINIIEN, PUE SHUDIS JF JO) FENGeY
pue eouRoylUB}s uOReALESUDD Jo
uopejoBen YIM pajeloosse sonjen
feojBojoos yuepoduy sey ~SO
“som aBeulerp atg jo Buyeeuiue ewios soyeyssooeu . “ZSO Ou! UeIp yey) skemyjed (eye.
Poysiod ave siayem Yo-unu Jey aunsus o} peau eyy JanemoY ‘aiqissod SiYM S}EIs JEIN}EL SI UF SIL UIE}OI O} S| Zh be'6) ‘LEV S'6L aBeuesp pue spuejom feijeu | Bey 9'z) abeuleig
oqUeIU StL “els 84) YBnowy ed eGeuep feunjeU peuyap Buyspe ayy ssudwoo 250 pue 7SO sUINsig-qng ‘OLE SL CL 6! are seale adeds uedo esoy, Jeawuoauy | _adedg uedc 2808 SO
“Pays paisep SY O} anquiucd jRs Pinos uoe}eBon Bugsixe swos Inq ‘juewerNbey
2 jou s1 uoge}aben Buysixe jo uoquajey pue eae Aque ue se padeospug] 9q 0} papjuued axe peo doo}
Fewa}Uy O1f 0} PEOY YoeUD e]UAg pUe anyC Ae} Aye, Bunjuy spedd aly Ulolpe yeLY EGO Jo sudRIaS esoUL “p
. “Queusnco (ejueuUOJjAUa “Ba) we} Buo| ayy u! sesodind aoeds Lado Joy pamnoas
@S|MNDUNO JO ‘pajoa}oud aq 0} uoRE}aban HyyyjeyUOD Wed yeu Jeno exlasas red aq O $1 ESO Jo aINUA) Oy>'9
“speo) urew ey Buoje sjujod sse0de ye sjuawiaye}s
‘Ague Guymojje ysyym ‘snoo} jewseyU ue sUIEWUTEW JuEUIdoJeAep ely UY aNsuS o} ale siOYNG esau ‘q
3UG Alf 0} JUIEpUD sejdeds Bulsn Ino palueD aq o} s{ senyeA JeUGeY pue
Bujueaios eoueyuie 0} Bugue|d juoweoueyuy “Aressadau aq jn aS ayy 0} o]WApUa seeds Buysn uojeyebion
~04 ‘2OUE}SU! SILA U] “sywlod sse00e pul speos UIBU! otf JO UORONASUOO BuUNp Jndd0 ABU eoUEquISIp wos ‘ars eu yGnon
‘speo. ol jedjouud ony 31 {pe uopejaBen Hugsixe UI joasd asayy jo Wie ety ISH "2 ‘
peo eBeyuoy jediouLsd ony 91g 0} jusdelpe UoRE}eBen Gugsixe UjEyo1 0} 8] SOU uy} 30 We BL SUNY, sofeyuy yengeu oy aynquauca
‘uoqeyeBen Bujusaros Jo) Ayqeyene we} Buoy sweuy aunsua 0} asnuay 0} pue speoy ujew jeusayxe Oo}
SIGHNS & Ul Pjay 8q 0} JOUPaLd-Gng SIU) JO sed aly Jo} oIqeNISep $131 “speo! ely Woy painjeay eq 0} sGujpyng Jo Gujueaios adeospue| epinoid 0) ave
Bulsprenpe 40} jequajod 0} JusLWe}ep aAgoayo ue aq 0} s] Bulueeus ety pue speo. jedjouud a4) 0} payUauO aq eyis sengoeigo oy ‘aAug AB} Jaye
84) UU JUUIdojeARp Jey PepualU! JOU 813] JneMOH ‘UogeoYguAD| Huipsau equsd UeqIN JueLoduy Ue S| 3] se pue peoy Yeo ayuey ByiSuy
‘OIA WOY JUBLUdOJenap OLY BpIY 0} JOU S| UEALOS SILA JO 9/01 OL] “PeoY yoo a[NAZ pue aru ABH Jefe SpeO uoqejoGen eageu jo sdins moueU (ey 2'z) Ayuawe
a6e}uoy jediouud ony ayy pue alls oy UaeMyag Usal0s edeospue] e apinoid 0} $1 ESO JOUIDaLg-qng Jo Jua}U ay, 40 sisisuco eae aoeds uedo sy Jensiajo uoyeNosalg
7 ade}g - Ue]q Jose] eNUED ssouIsNg Amys ‘STANLAA ONISOOHD
Page 33
Sop podyreu Tuo diasepOEg\oafordACD
“fess auo 2q 0} sBuiping ‘2
10 weLR S89] 9g 0} ON JI “q
“uoneeGen Bugsixe JeRue}sqns Jo uORUaTal BAloAUl PUR AjsUA}UI Ao] 9q 0} WauUdo}aAEG ‘e
“saluco|no JuEWOdw] are ysed jeuoeU usoefpe oly JO} pue ays oy} UO
Mog sanjen aaeds usdo Jo uoqUa}eY “aS 84) 40 oUEEg OL9 IM PayEoOsse oq JOU paau Jeu) AlnNoe ssauisnq
Burpnjouy juewidojenap asn paxitu Jounu 8 Jo} pasn eq Aeur puel aig Ajangewayy quaudojanep jeuogeoises
Joujtu 40 asn Jo} passasse aq Aew pue [/'¢ uoJdeS Bag] JUaWdoJaAap JoJ pauIENSUOD s} oUIDaId-qns SIL
ZU CG) BOLE}
syed |euojeu yusoe[pe
Jo vogoajoud pue senjea pue
Jepereyo seeds uado jo uoqUa}oY
(eu gt)
sords usdo Jo asp)
Pex, Jou) ‘esq
uoneaiey OUI)
sods uedg
1 881) PaXIN
juonealoay
QW/O3Y
: auraypg Buyuueig
if J0 8U07 Aysuaq Moy jenuEpIsey oY] so suoIstAOIC LYM piodoE |JeYs JusUREEN UBisep BujpyNg [ewWeyXg ‘|
{HG} 30 Bare doeds Uado WNUUN e anBY YeYs JOUIDaLd-Gng EYL *Y
“Gq pue [3 syoupaid-qng Uj qwauidojenap yum yuaysisuco ‘pebeys eq 0} payadxe juauidojenag 3
“aUs-uo papiaaid oq jm Buryed sejnaya, “a
* 22 pue 43 ‘1g sjouseyg-ang ws ‘Ayngoouuoo Aemeylq pue ueLjsepad Buoys ney 0} juewdojanag “p
“ySO oupeld-qng ym saexuy jensia Buoys eney 0] Juswudojareg “oO
“skeuoys Z 0} dn Jo syyBiey Bupang “9
“9'0 0} dn Joursaud-qns aug uly uawudojanep Joy One: Jo\d ‘apinB Jo kem fq
Janamoy ‘uojeoydde yuauidojenap juengjal Aue Jo ped se pesepisuco aq jy SuoTeo|e eoeds Jooy aypeds ‘e
“ayeudodde aq pinom ej/}s |a|soy se yons pauje}uoo-yjas
JOU sijeyy UoRepoUWOSOY ‘uoREdNoDO JusUeWad Jo; UOpEpOWWOONE aUO|e-pue}s UeLR JaLyeI ‘sjouloaid-qns
Je\go U} jueuidoranap 0} jounlpe ue se pepudjul si juatudojensp [eAUapisay “sjoujoaid-qns seyjo pue 73 pue |
s]OUIDALY-GNS Jo Jey pue GIy JOUlOa1y-qns Jo asn ayy UseMjog SuOge!DOSSe BUOYS aq |IIm a0ln ‘AqUanbesuo>
“ays alg UO sjoureid-gns Aay Je1go 0} uopepoWWODde Joddns apinoid 0} popUayU SI Say JOUIDEIE-Gns
“PSO ulpeld-qng Burgolpe aig jo uogouny eveds uado aty abpeymouyoe jim juewdojereq ‘B | ~
GV e6L
“SAUID SSBUISNG B11YS Oy} JO
SJuauodwioo Aey Jeuj0 J} Seqtioey
poddns jequapise: au Jo UoIsinodg
(ey 70)
poddng yuswhojduy
Jequepisoy
S3u
“seale oeds uedo esau] 0}
owapus saidads BSuisn jno pases eq 0} S| saniAnde vORONAsUOD BuuNp pequnysip seeue Aue Jo uoRE|eBeney 'O
“sepeds ayeudoidde jo shuquejd jeuogippe Aq paoueyue eq Aew uojejaGan Gugspq q
Z afvig - ued seiseyy aquag ssouIsng aNYS ‘SALA DNISOOHO
Jw SL) Ld
a ee
J
Page 34
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 31 to
. aa
5.0 CODES po
Specific Codes for the site will be developed by Council as part of the preparation of the IPA Planning 7
Scheme for Noosa Shire. { |
H g:\dep\projects\sbe\masterplan-finalapr04.doc
Page 35
E.
29
SCALE 1:3500 (A3)
a:
oss5\
[Tota arco 0.2 te *
Tote! oraa
Ho
r
Z
/
Total wes 1.9 Ho
i
mega
RES
ae
Os4” IS
Total Areo 2.6 Ho
OS2
Toto) Areo 12.6 He
123
wcnaar3
Notional Pork
_REC/MU
Tote! Area 1.8 Ho
Tato! Area 37 Ho y
OS1
Total Area 11.3 Ho
_NOOSA SHIRE BUSINESS CENTRE
MASTER PLAN - STAGE 2 - MP2 PLAN
LEGEND
esi 54221
B1 BUSINESS
os! {Retail Centre and Business)
[OSS
“P58 te
B2 BUSINESS
(Cor Parking & Offices)
B3 BUSINESS
(Showroom, Office & Business)
i235
E1 EMPLOYMENT = “#77
(Technology based R&D
Business Offices & Civic)
E2 EMPLOYMENT
(Educative & Environmental
R&D Business & Offices)
E3 EMPLOYMENT
(Environmental R&D
Business & Offices)
4 EMPLOYMENT
(Industry & Business)
£5 EMPLOYMENT
(Industry & Business)
—6 EMPLOYMENT
(Business Offices & Transit)
EMPLOYMENT
E7 (Business & Offices)
O81 OPEN SPACE
(Environmental)
OS2 OPEN SPACE
7 {Environmentet)
eyere2
OS3 OPEN SPACE
(Preservation of Visual Amenity)
OS4 OPEN SPACE
(Environmental Drainage)
OSS OPEN SPACE
(Preservation of Visual Amenity)
O86 OPEN SPACE
(Preservation of Visual Amenity)
OS7 OPEN SPACE
(Environmental Drainage)
RES RESIDENTIAL
({Employmen| Support)
REC/MU RECREATION MIXED USE
(Minor recreation
minor mixed usy 2
or open spaces) —rrwooes
.. . BICYCLE PATH
coune, WALKING PATH
i=
Page 36