Original source · versioned page text
Annexure 5 Master Plan 2 (003)
Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 9 TABLE 2.3: CONSTRAINTS INFLUENCING THE MASTERPLAN ISSUE CONSTRAINT Flooding No development below RL 3.0 metres Potential Acid Sulphate Soils Avoid exposure of PASS if possible. Otherwise development in accordance with the State Planning Policy on Planning and Managing Development Involving Acid Sulfate Soils Habitat links No development that would place at risk the functioning of the Doonan Link and provision of habitat links for movement of native fauna throughout the Site Eenie Creek and associated wetlands and drainage tines ~ No change in hydrological regimes and water quality of Eenie Creek and its associated wetlands and major drainage lines Vegetation of Conservation Significance - ‘Of Concern’ Regional Ecosystems No development that would place at risk the long term viability and sustainability of ‘Of Concer’ Regional Ecosystems on the Site Fauna of conservation significance No development that would place local populations of these species at risk Proximity of Noosa Airport Types of land use that are able to sustain possible future aircraft noise Values of adjacent Noosa National Park Provision of vegetated buffers adjacent to the national park and provision of habitat links to and from the national park. ‘G:NDEP\Projects\SBC\Masterplan-FinalA pr04.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.