Annexure 5 Master Plan 2 (003)

Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.

of 36

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 14

3.2 URBAN DESIGN
3.2.1 Design Workshop

A principle purpose of MP2 is to present a refined fayout plan for the Shire Business Centre. To facilitate the
preparation of such a plan, Council held a day long workshop on 5 September 2002. A fange of participants were
present at the workshop including -
> Councillors

Council staff

> Representatives of property owners and Stockwell (a company proposing to develop part of the Shire
Business Centre)

> Consultant architects/urban designers
> Consultant traffic engineers
> Local architects

Key outcomes of the workshop were-

Apreferred master plan of layout for the various land use elements

‘Identification of preferred locations for a civic precinct and an inter-regional transit facility
Some preferred urban design themes

Refinement of open space strategies

Identification of access issues

Improved pedestrian focus

More utility to the intemal loop road

Better integration of future development and use of the two properties that comprise the Shire Business
Centre site '

> Resolution of a connection to the adjoining industrial area

vwvvwvVvv WY WY VW

The workshop has been followed by further discussion between the architects and traffic engineers to
determine whether preferred access arrangements could be resolved. While complete agreement was not
reached, access was largely resolved in principle with Council being called upon to determine the
placement of the two roundabouts in Walter Hay Drive and the additional access from Eenie Creek Road,
which offer access into the site.

3.3 RETAIL DEVELOPMENT
Section 19.3.1.2 of the Strategic Plan nominates retail development outcomes for the site of

> Retail shops of the order of 15,000m? of floorspace with a discount department store to be in the first stage
> Homemaker and showrooms of the order of 10,000m?
Council engaged Urban Economics in 1999/2000 to conduct independent investigations on the economic
impacts of a development proposal by. Conclusions from those investigations were-

> — An 18,300m? sub-regional shopping center has market support for an opening by 2004.

> The impact of the sub-regional center can be contained within manageable levels provided the
future expansion of the retail network is contained. It is expected the sub-regional center will create
an impact upon the retail network [that] falls just short of being significant. During 2004 it can be
expected there will be some closures and relocations to the Shire Business Centre. It is expected

that all existing retail nodes will continue to perform at their designated function in the retail
network.

G: \DEP\Projects\SBC\Masterplan-FinalApr04.doe
Log in to download the original file

Annexure 5 Master Plan 2 (003).pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.