Skip to the record
Every meeting, every word.

Original source · versioned page text

Annexure 5 Master Plan 2 (003)

Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.

of 36

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 19

4.0 MASTER PLAN OUTCOMES: STAGE 2

44

4.2

In this section, the master planning outcomes for Stage 2 are described. These outcomes have been derived
from the master planning outcomes for Stage 1 and then further refined by Stage 2.

MP2 PLAN

MP2 Stage 2 plan is derived from the simple concepts provided in Figure 3.1 and Figure 3.2. It provides a more
detailed plan for the site and the roads about the site. An A3 version is found at the end of this document.

MP2 Stage 2 plan contains considerably more design detail than MP1. This plan together with MP1 meet the
requirements of the Strategic Plan and the development principles established in Section 3. Boundaries between
precincts, areas of precincts and the location of proposed roads and intersections have been refined from the
Stage 1 Master Plan but they are still conceptual to a degree. Final boundaries will be determined in conjunction
with decision-making on appropriate development applications.

COMPONENTS OF THE MP2 PLAN

Table 4.1 shows the elements indicated on MP2 Plan including their map object number, primary function,
secondary function and area. The primary and secondary functions are intended to indicate the dominant
activities within precincts and sub-precincts. The precincts and sub-precincts are not intended to define discrete
boundaries for the various functions, however the control of the scale of some of these functions will be of
importance,

MP2 Plan and Table 4.1 contain the following elements:

a. A Business Precinct comprising a total of 3 sub-precincts totalling 12.1 hectares and allocated for future
business growth areas of Noosa Shire. The Business Precinct would include the highest order of retail
development in the Shire and significant vehicle parking.

b. An Employment Precinct comprising a total of 7 sub-precincts totalling 20.0 hectares and allocated for
future employment growth. The Employment Precinct includes 3 sub-precincts with preferred themes. The
themes are not mandatory and the intent is to allow these sub-precincts to take advantage of new
employment opportunities, as and when they arise.

.¢. An Open Space Precinct comprising a total of 7 sub-precincts- totalling 29.6 hectares and allocated for a

Tange of open space functions. Some of these functions would see the land left in its natural state with
little human use, whilst others would see significant modification to the natural form and significant human
use. The Open Space Precinct includes an extensive area that would continue to serve as an ecological
corridor along and buffer to Eenie Creek. The open space precinct acknowledges that it is part of a wider
open space resource which includes the National Park and Lake Weyba.

d. A Residential Precinct comprising 0.7 hectares. The precinct is intended to provide support
accommodation fo the other key sub-precincts.

e. A Civic designation located between the principal retailing precinct and the northem entry road from
Walter Hay Drive. Council established a Civic Precinct Working Group fo investigate the type of function
that Council would consider on the'site. The Group reported its findings to Council and nominated the
following activities for further assessment -

Central library

Art gallery

Performing arts center

Community radio and sound studio
Council one-stop shop

Tourist information center

Heritage interpretative center
Inter-regional transit center

Park and ride facilities

Community meeting and gathering spaces
Public art, sculptures and murals
Outdoor street entertainment

VVVVVVVVV VV Vv

GADEP\Projects\SBC\Masterplan-FinalA pr04.doc

 
Log in to download the original file

Annexure 5 Master Plan 2 (003).pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.