Original source · versioned page text
Annexure 5 Master Plan 2 (003)
Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 TABLE 4.2 PRIMARY & SECONDARY FUNCTIONS & PLANNING SCHEME DEFINITIONS GADEP\Projects\SBC\Masterplan-FinalApr04.doc 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.