Original source · versioned page text
Annexure 5 Master Plan 2 (003)
Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.
Plans and drawings: the text below has words only, no drawings.
CHOOSING FUTURES: Shire Business Centre Master Plan - Stage 2 4 CONTENTS 9.0 INTRODUCTION... cssssssscsssscsesssssnvssssvsssssossssssseesesetsessess 5 2.0 BACKGROUND... 2.1. STRATEGIC PLAN 2.2 ECOLOGICAL VALUES.. 2.3 CONSTRAINT MAPPING 3.0 PLANNING & DESIGN GUIDELINES AND PRINCIPLES.. see ese 10 3.1. GENERAL PRINCIPLES. + 10 3.2 URBAN DESIGN............. 14 3.2.1 Design Workshop ... 14 3.3 RETAIL DEVELOPMENT. 3.4. DEVELOPMENT SEQUENCING . 3.5 TRANSPORT ....sessssssssssssseceesee . 3.6 ECOLOGICALLY SUSTAINABLE DEVELOPMENT... 17 3.7. OPEN SPACE AND LANDSCAPING. ......s.sssssssssssseee 17 4.0 MASTER PLAN OUTCOMES: STAGE 2 44 42 43 5.0 6.0 G:\DEP\Projects\SBC\Masterplan-FinalA pr04.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.