J&P Richardson Industries Pty Ltd -3-
2.0 THE TRANSMISSION LINES
2.1 Transmission line alignment and route
2.1.1 Network connections
The ENERGEX easement crossing the Noosaville property contains a double circuit
concrete and lattice steel tower lines supporting conductors energised at 132kV.The
associated circuits form part of the ENERGEX North Coast sub transmission network.
As shown in Figure 2 below, the two circuits provide a 132kV connection from SSSRH
Sunrise Hills substation to SSNVL Noosaville substation. When the lines were constructed
(around 1983) they ran from Cooroy to Noosaville directly (as F796 and F797) – being later
cut into SSSRH.
There is no 132kV distribution bus at SSNVL – each feeder terminates directly onto the
primary side of a 132kV/11kV transformer. The 11kV SSNVL bus is also normally open,
meaning that the two 132kV feeders do not operate in strict parallel (the loads can be
different).
Figure 2 Part of North coast 132kV sub-transmission network
2.1.2 Line / structure description F7298/790
Intermediate line structures are of concrete monopole construction incorporating composite
offset post insulation. An additional standoff bracket has been added between the pole and
insulator base to provide a climbing corridor on the structure.
Lattice steel towers appear to have been used on strain structures.
The line is a dual circuit six conductor configuration (single 37/3.00 AAC “SATURN”
conductor per phase) with single overhead 18.2mm “Cossonay” (OHEW) earth wire. The
lines have previously been phased for the minimum field arrangement (diagonal phasing).
From ENERGEX records the design temperature of the 132kV lines was 80°C.
Hollett Road EMF Study V1.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.