Request for Amended Advice Agency Response_Energex_Council CDA_01-04-2020
Attached to the e-mail Request for Energex to provide an Amended Advice Agency Response - 152006.1999.4.
The original of this document is very large (12.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
J&P Richardson Industries Pty Ltd -11-
4.3.2 Scenario2 Feeder 10PoE load forecasted
The results of electric and magnetic field calculations relevant to scenario2 are summarised
in Table 8 and Figure 8 below and figure 9 overleaf.
Table 8 EMF levels scenario2 : maximum 132kV feeder load
Calculated value at edge of
4mG offset
PARAMETER easement Maximum
Northern Southern Northern Southern
Magnetic Field strength 0.83 mG 0.71 mG N/A N/A 2.26mG
Electric Field strength 0.136kV/m 0.113kV/m ------ ------ 0.329kV/m
Figure 8 Magnetic Field profile : scenario2
Hollett Road EMF Study V1.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.