Performance outcomes                                   Acceptable outcomes                    Response
PO4 Filling and excavation does not interfere with, or No acceptable outcome is prescribed.   Complies. Any filling or excavation work required by
result in damage to, infrastructure or services in a                                          the development will not interfere with or result in
state-controlled road.                                                                        damage to infrastructure or services in the adjacent
                                                                                              road reserve.
Note: Information on the location of services and
public utility plants in a state-controlled road can be
obtained from the Dial Before You Dig service.

Where development will impact on an existing or
future service or public utility plant in a state-
controlled road such that the service or public utility
plant will need to be relocated, the alternative
alignment must comply with the standards and design
specifications of the relevant service or public utility
provider, and any costs of relocation are to be borne
by the developer.
PO5 Filling, excavation, building foundations and No acceptable outcome is prescribed.
retaining structures do not undermine, or cause
subsidence of, a state-controlled road.

Note: To demonstrate compliance with this
performance outcome, it is recommended an RPEQ
certified geotechnical assessment, prepared in
accordance with Volume 3 of the Road Planning And
Design Manual 2nd edition, Department of Transport
and Main Roads, 2016, is provided.
PO6 Filling, excavation, building foundations and No acceptable outcome is prescribed.
retaining structures do not cause ground water
disturbance in a state-controlled road.

Note: To demonstrate compliance with this
performance outcome, it is recommended an RPEQ
certified geotechnical assessment, prepared in
accordance with Volume 3 of the Road planning and



                                                                                                                           Page 2 of 23
Log in to download the original file

Attachment 13 - Code Assessment.pdf · 760 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.