Attachment 13 - Code Assessment
Performance outcomes Acceptable outcomes Response
engineering purposes and AS 4133.0-2005 – Methods
of testing rocks for engineering purposes.
AND
AO10.2 Compaction of fill is carried out in accordance Complies. Filling and excavation works will be
with the requirements of AS 1289.0 2000 – Methods undertaken in accordance with required standards.
of testing soils for engineering purposes.
PO11 Filling and excavation does not cause wind- AO11.1 Compaction of fill is carried out in accordance Complies. Filling and excavation works will be
blown dust nuisance in a state-controlled road. with the requirements of AS 1289.0 2000 – Methods undertaken in accordance with required standards.
of testing soils for engineering purposes.
AND
AO11.2 Dust suppression measures are used during
filling and excavation activities such as wind breaks or
barriers and dampening of ground surfaces.
Stormwater and drainage
PO12 Development does not result in an actionable No acceptable outcome is prescribed. Complies. The proposed development is not
nuisance, or worsening of, stormwater, flooding or anticipated as causing any actionable nuisance to the
drainage impacts in a state-controlled road. adjacent state controlled road network.
PO13 Run-off from the development site is not AO13.1 Development does not create any new points Complies. Run off to Myall Street / Nandroya Road as
unlawfully discharged to a state-controlled road. of discharge to a state-controlled road. a consequence of the proposed development is not
AND anticipated.
AO13.2 Stormwater run-off is discharged to a lawful
point of discharge.
Note: Section 3.4 of the Queensland Urban Drainage
Manual, Department of Energy and Water Supply,
2013, provides further information on lawful points of
discharge.
AND
AO13.3 Development does not worsen the condition
of an existing lawful point of discharge to the state-
controlled road.
PO14 Run-off from the development site during AO14.1 Run-off from the development site during
construction does not cause siltation of stormwater construction is not discharged to stormwater
infrastructure affecting a state-controlled road. infrastructure for a state-controlled road.
Page 4 of 23