Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN



 PERFORMANCE OUTCOMES                      ACCEPTABLE OUTCOMES                               PROPOSAL                                      COMPLIANCE
                                              metres if fitted with one handrail and
                                              900 millimetres if fitted with a handrail
                                              on each side;
                                           e) the primary walkway to multiple berth
                                              pontoons has a maximum width of 1.5
                                              metres; and
                                           f) the maximum width of a gangway is 1.5
                                              metres.


                                           AO13.7                                            AO13.7                                        ☐Compliant
                                           In Noosa Sound, where quaylines are set, a        The development does not propose prescribed   ☒N/A
                                           jetty or pontoon does not extend into the         tidal works.                                  ☐Performance Solution
                                           watercourse beyond the quayline;


                                           AO13.8                                            AO13.8                                        ☐Compliant
                                           Where no quaylines are set, the maximum           The development does not propose prescribed   ☒N/A
                                           distance a jetty or                               tidal works.                                  ☐Performance Solution
                                           pontoon extends into the watercourse is
                                           10m, unless it can be demonstrated that a
                                           distance in excess of 10m is essential to
                                           safely access a vessel from the jetty.


                                           AO13.9                                            AO13.9                                        ☐Compliant
                                           All attachments to jetties, including but not     The development does not propose prescribed   ☒N/A
                                           limited to boat lifts, jetski cradles, floating   tidal works.                                  ☐Performance Solution
                                           berths and floating pontoons are located
                                           within the quay line.




                                                     BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                                 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                              E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.