Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE f) ensure the structural integrity of the outermost projection of any boatlifting the works is maintained and not device is setback a minimum of 1 metre compromised; and from the prolongation of the boundaries. g) avoid a secondary boat lifting device (floating dock) that AO21.2 AO21.2 ☐Compliant exceeds 8m². Only one primary boat lifting device and one The proposal does not provide boat lifting ☒N/A secondary small device (floating dock) per devices. ☐Performance Solution jetty. The small secondary floating dock is no greater than 8m² and purpose designed for personal watercraft such as jet skis, kayaks, paddleboards etc. AO21.3 AO21.3 ☐Compliant A shared jetty contains only one boat lifting The proposal does not provide boat lifting ☒N/A device on either side of the jetty. devices. ☐Performance Solution AO21.4 AO21.4 ☐Compliant The structure may be securely attached, The proposal does not provide boat lifting ☒N/A excluding roped, chains and straps, to an devices. ☐Performance Solution existing jetty where a structural engineer's report for the design is provided certifying that the jetty is structurally capable of supporting the boat lifting device AO21.5 AO21.5 ☐Compliant For twin jetty structures with central boat The proposal does not provide boat lifting ☒N/A lifting devices- devices. ☐Performance Solution a) are only permitted in the absence of any jetties; BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.