Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PURPOSE & OVERALL OUTCOMES PROPOSAL COMPLIANCE (ii) ensuring lots have a suitable and safe means of access to a public road; (iii) incorporating a road and transport network that is responsive to, and integrated with, the natural topography of the site, is integrated with existing or planned adjoining development and supports the circulation of public transport; (iv) promoting walking, cycling and the use of public transport; (v) promoting social interaction and community activity; (vi) incorporating a lot layout that is responsive to natural climatic influences and allows for new buildings to reflect the principles of subtropical and sustainable design; (vii) providing appropriate infrastructure, including reticulated water and sewerage (where available), sealed roads, pedestrian and bicycle paths, urban and non-urban open space and community facilities in urban areas; (viii) offering residential choice, diversity and mix to meet the diverse demographic, social, cultural, economic and lifestyle needs of the community; and (ix) ensuring that new lots outside the Urban boundaries have good levels of convenience and accessibility to urban services and do not compromise the ongoing productive use of rural lands. BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.