Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE (a) the creation of regular lots is ☒N/A impractical such as at a curve ☐Performance Solution in the road or because of topographical constraints; (b) safe access and visual exposure to and from the site can be provided, while not adversely impacting on the functionality of the surrounding road network; (c) it is desirable to avoid clearing of vegetation and the fragmentation of habitat in ecologically important areas; and (d) the irregular lot is demonstrably suitable for its intended purpose. Lot layout Site Responsive Design AO7.1 AO7.1 ☒Compliant PO7 If located in the Low density residential The proposed lots are located outside of flood ☐N/A Development provides for a lot layout zone, Medium density residential zone, High areas. ☐Performance Solution and configuration of roads and density residential zone, Tourist pathways that is responsive to:- accommodation zone or Community facilities zone and intended for a residential (a) the setting of the site within an use, any new lot is located outside the urban or nonurban context; modelled flood level of the 1% AEP (1:100 year ARI) water surface levels or where not BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.