Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE the surface of land facilitates efficient development in a manner that is consistent with the overall outcomes for the zone and Local plan area in which the site is located. Stormwater Management PO24 PO24 AO24 ☒Compliant Development provides for the No acceptable outcome provided The proposal provides a suitable stormwater ☐N/A effective drainage of lots and roads in management system that will be designed and ☐Performance Solution a manner that:- constructed in accordance with the relevant a) maintains the natural flow requirements. regime; b) effectively manages stormwater quality and quantity; and c) ensures no adverse impacts on receiving waters and surrounding land. Conflicting land uses PO25 PO25 AO25 ☒Compliant New lots for residential development No acceptable outcome provided The proposed lots are suitably located. ☐N/A do not adjoin land located in the ☐Performance Solution Medium impact industry zone or the Low impact industry zone. Rearrangement of Lot Boundaries BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.