Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE including low cost visitor accommodation and marine facilities. PO3 AO3.1 AO3.1 Development contributes to the Development adjacent to a gateway or The site is not located adjacent to a gateway ☐Compliant establishment of attractive special place or on land identified as a key or special place. ☒N/A streetscapes and gateways to enhance corner on Figure 7.2.3.4 (Tewantin the sense of arrival and character of Framework and Character Plan): ☐Performance Tewantin. Solution a) incorporates architectural and landscape treatments which emphasise the corner location as show in Figure AP3-10A and Figure AP3-10B; and b) incorporates building materials such as varied roof forms, changes in materials and variations in projected and recessed elements and facades AO3.2 AO3.2 Development adjacent to a primary The site is not located adjacent to a ☐Compliant streetscape treatment area on Figure streetscape treatment area. ☒N/A 7.2.3.4 (Tewantin Framework and Character Plan) provides for streetscape ☐Performance improvements which are appropriate to the Solution location, setting and context of the development and complement existing or proposed streetscape works in the local area. AO3.3 AO3.3 Development on Key Development Sites The site is not identified as a key development ☐Compliant identified on Figure 7.2.3.4 (Tewantin site. ☒N/A Framework and Character BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.