Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Application Report

of 157

Page text shows just the words. Original shows the document exactly as it was published.

RECONFIGURATION OF A LOT (1 INTO 5 LOTS)
83 BUTLER STREET, TEWANTIN




 PURPOSE & OVERALL OUTCOMES                                         PROPOSAL                                                            COMPLIANCE
 a) Development is located, designed, constructed and
    operated in accordance with best sustainable design                                                                                 ☒Compliant
                                                                    The proposed new lots are suitably designed and positioned to
    principles.                                                                                                                         ☐N/A
                                                                    support best sustainable design principles in accordance with the
 b) Development responds to the site’s topography,                                                                                      ☐Performance Solution
    orientation, prevailing winds and existing vegetation.          overall outcomes.
 c) Development incorporates water sensitive urban design
    principles to manage stormwater.
 d) Development includes passive design elements to respond
    to the local climate.
 e) Development minimises the reliance on non-renewable
    resources.
 f) Buildings are designed and constructed to be energy and
    water efficient.
 g) Development includes operational initiatives for energy
    efficiency.
 h) Existing vegetation is retained where possible and creates
    shade and cooling on site.
 i) Stormwater is collected and used on site for non-potable
    purposes of gardening, toilet flushing, laundry and hot
    water supply uses.
 j) Healthy indoor environments are provided by
    incorporating the use of low toxic materials, natural light
    and cross ventilation.




                                                BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169
                                            NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481
                                                         E: [email protected] W: www.tpalliance.com.au
Log in to download the original file

Application Report.pdf · 2.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.