Original source · versioned page text
Application Report
RECONFIGURATION OF A LOT (1 INTO 5 LOTS) 83 BUTLER STREET, TEWANTIN PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE AO5.4 AO5.4 ☒Compliant Bus routes are located to maximise patron The proposal maintains and supports the ☐N/A catchment and to consider personal safety, adjoining roads with regards to catering for ☐Performance Solution lighting and traffic management. buses. AO5.5 AO5.5 ☒Compliant Development on bus routes does not impact The proposal maintains and supports the ☐N/A on bus stop infrastructure or the efficient adjoining roads with regards to catering for ☐Performance Solution running of bus services. buses. AO5.6 AO5.4 ☒Compliant Roads catering for buses are designed and The proposal maintains and supports the ☐N/A constructed in accordance the relevant adjoining roads with regards to catering for ☐Performance Solution State government standards buses. PO6 AO6.1 AO6.1 ☒Compliant Development enhances connectivity Development provides direct and The proposal maintains and enhances ☐N/A between existing and future public convenient pathway linkages between linkages to transport facilities where ☐Performance Solution passenger transport facilities and other existing and future public passenger required. transport modes transport facilities. AO6.2 AO6.2 ☒Compliant Development provides wayfinding The proposal maintains and enhances ☐N/A information for existing public transport linkages to transport facilities where ☐Performance Solution facilities and interconnecting transport required. modes. BRISBANE: P +617 3361 9999 I 57 Manilla Street, EAST BRISBANE Q 4169 NORTHERN NSW: P +61 2 6637 9110 I Building 1, 1 Porter Street, BYRON BAY N 2481 E: [email protected] W: www.tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.